{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,6,8]],"date-time":"2026-06-08T21:49:46Z","timestamp":1780955386866,"version":"3.54.1"},"reference-count":104,"publisher":"MDPI AG","issue":"12","license":[{"start":{"date-parts":[[2023,11,25]],"date-time":"2023-11-25T00:00:00Z","timestamp":1700870400000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by\/4.0\/"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Buildings"],"abstract":"<jats:p>The high volume of information produced by project management and its quality have become a challenge for organizations. Due to this, emerging technologies such as big data, data science and artificial intelligence (ETs) have become an alternative in the project life cycle. This article aims to present a systematic review of the literature on the use of these technologies in the architecture, engineering, and construction industry. A methodology of collection, purification, evaluation, bibliometric, and categorical analysis was used. A total of 224 articles were found, which, using the PRISMA method, finally generated 57 articles. The categorical analysis focused on determining the technologies used, the most common methodologies, the most-discussed project management areas, and the contributions to the AEC industry. The review found that there is international leadership by China, the United States, and the United Kingdom. The type of research most used is quantitative. The areas of knowledge where ETs are most used are Cost, Quality, Time, and Scope. Finally, among the most outstanding contributions are as follows: prediction in the development of projects, the identification of critical factors, the detailed identification of risks, the optimization of planning, the automation of tasks, and the increase in efficiency; all of these to facilitate management decision making.<\/jats:p>","DOI":"10.3390\/buildings13122944","type":"journal-article","created":{"date-parts":[[2023,11,27]],"date-time":"2023-11-27T03:33:56Z","timestamp":1701056036000},"page":"2944","update-policy":"https:\/\/doi.org\/10.3390\/mdpi_crossmark_policy","source":"Crossref","is-referenced-by-count":41,"title":["Big Data, Data Science, and Artificial Intelligence for Project Management in the Architecture, Engineering, and Construction Industry: A Systematic Review"],"prefix":"10.3390","volume":"13","author":[{"given":"Sergio","family":"Zabala-Vargas","sequence":"first","affiliation":[{"name":"Especializaci\u00f3n en Gerencia de Proyectos\/Ingenier\u00eda Industrial, Rector\u00eda Virtual, Corporaci\u00f3n Universitaria Minuto de Dios, Bogot\u00e1 D.C 111021, Colombia"}],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Mar\u00eda","family":"Jaimes-Quintanilla","sequence":"additional","affiliation":[{"name":"Especializaci\u00f3n en Gerencia de Proyectos\/Ingenier\u00eda Industrial, Rector\u00eda Virtual, Corporaci\u00f3n Universitaria Minuto de Dios, Bogot\u00e1 D.C 111021, Colombia"}],"role":[{"vocabulary":"crossref","role":"author"}]},{"ORCID":"https:\/\/orcid.org\/0000-0001-5251-5944","authenticated-orcid":false,"given":"Miguel Hern\u00e1n","family":"Jimenez-Barrera","sequence":"additional","affiliation":[{"name":"Especializaci\u00f3n en Gerencia de Proyectos\/Ingenier\u00eda Industrial, Rector\u00eda Virtual, Corporaci\u00f3n Universitaria Minuto de Dios, Bogot\u00e1 D.C 111021, Colombia"}],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"1968","published-online":{"date-parts":[[2023,11,25]]},"reference":[{"key":"ref_1","unstructured":"Oxford Economics (2021). Future of Construction, Oxford Economics."},{"key":"ref_2","unstructured":"Cooke, B., and Williams, P. (2013). Construction Planning, Programming and Control, John Wiley & Sons."},{"key":"ref_3","doi-asserted-by":"crossref","unstructured":"Saltz, J.S. (November, January 29). The Need for New Processes, Methodologies and Tools to Support Big Data Teams and Improve Big Data Project Effectiveness. Proceedings of the 2015 IEEE International Conference on Big Data (Big Data), Santa Clara, CA, USA.","DOI":"10.1109\/BigData.2015.7363988"},{"key":"ref_4","doi-asserted-by":"crossref","first-page":"534","DOI":"10.1108\/ECAM-05-2016-0110","article-title":"Building a Rough Sets-Based Prediction Model for Classifying Large-Scale Construction Projects Based on Sustainable Success Index","volume":"25","author":"Akbari","year":"2018","journal-title":"ECAM"},{"key":"ref_5","unstructured":"Larson, E., and Gray, C. (2014). Project Management: The Managerial Process 6e, McGraw Hill."},{"key":"ref_6","unstructured":"Lester, A. (2013). Project Management, Planning and Control: Managing Engineering, Construction and Manufacturing Projects to PMI, APM and BSI Standards, Elsevier Science."},{"key":"ref_7","unstructured":"Netscher, P. (2014). Successful Construction Project Management: The Practical Guide, Panet Publications."},{"key":"ref_8","doi-asserted-by":"crossref","first-page":"146","DOI":"10.1016\/j.autcon.2017.08.032","article-title":"Optimizing Decisions in Advanced Manufacturing of Prefabricated Products: Theorizing Supply Chain Configurations in off-Site Construction","volume":"84","author":"Arashpour","year":"2017","journal-title":"Autom. Constr."},{"key":"ref_9","doi-asserted-by":"crossref","first-page":"1405","DOI":"10.1016\/j.ijproman.2015.03.006","article-title":"Bridging BIM and Building: From a Literature Review to an Integrated Conceptual Framework","volume":"33","author":"Chen","year":"2015","journal-title":"Int. J. Proj. Manag."},{"key":"ref_10","doi-asserted-by":"crossref","first-page":"184","DOI":"10.1016\/j.jss.2017.11.066","article-title":"An Effective Approach for Software Project Effort and Duration Estimation with Machine Learning Algorithms","volume":"137","author":"Pospieszny","year":"2018","journal-title":"J. Syst. Softw."},{"key":"ref_11","doi-asserted-by":"crossref","first-page":"e14","DOI":"10.1017\/dce.2020.16","article-title":"Construction with Digital Twin Information Systems","volume":"1","author":"Sacks","year":"2020","journal-title":"Data-Centric Eng."},{"key":"ref_12","doi-asserted-by":"crossref","first-page":"45","DOI":"10.1016\/j.autcon.2016.08.027","article-title":"Integrating Semantic NLP and Logic Reasoning into a Unified System for Fully-Automated Code Checking","volume":"73","author":"Zhang","year":"2017","journal-title":"Autom. Constr."},{"key":"ref_13","doi-asserted-by":"crossref","first-page":"322","DOI":"10.1177\/0165551518789880","article-title":"A Study of Big Data Evolution and Research Challenges","volume":"45","author":"Gupta","year":"2019","journal-title":"J. Inf. Sci."},{"key":"ref_14","unstructured":"Chang, W., and Grady, N. (2019). NIST Big Data Interoperability Framework: Volume 1, Definitions, National Institute of Standards and Technology."},{"key":"ref_15","unstructured":"International Data Corporation (2020). IDC\u2019s Worldwide Software Taxonomy, International Data Corporation."},{"key":"ref_16","unstructured":"Mayer-Sch\u00f6nberger, V., and Cukier, K. (2013). Big Data: A Revolution That Will Transform How We Live, Work, and Think, Houghton Mifflin Harcourt."},{"key":"ref_17","unstructured":"Motoa-Grajales, C., Gomez-Pe\u00f1a, M., and Zabala-Vargas, S. (2023). Emerging Technologies (Big-Data, Data Science and Artificial Intelligence) in Project Management. An Initial Overview, Universidad Francisco de Paula Santander."},{"key":"ref_18","doi-asserted-by":"crossref","first-page":"9","DOI":"10.1186\/s41044-016-0014-0","article-title":"Big Data Preprocessing: Methods and Prospects","volume":"1","author":"Luengo","year":"2016","journal-title":"Big Data Anal."},{"key":"ref_19","doi-asserted-by":"crossref","first-page":"073001","DOI":"10.1088\/1748-9326\/ab1b7d","article-title":"How Can Big Data and Machine Learning Benefit Environment and Water Management: A Survey of Methods, Applications, and Future Directions","volume":"14","author":"Sun","year":"2019","journal-title":"Environ. Res. Lett."},{"key":"ref_20","doi-asserted-by":"crossref","first-page":"05019017","DOI":"10.1061\/(ASCE)CO.1943-7862.0001745","article-title":"Big Data Analytics System for Costing Power Transmission Projects","volume":"146","author":"Oyedele","year":"2020","journal-title":"J. Constr. Eng. Manag."},{"key":"ref_21","unstructured":"Omran, B.A., and Chen, Q. (2016). Construction Research Congress, ASCE."},{"key":"ref_22","unstructured":"Wang, K., Guo, F., Zhang, C., Hao, J., and Schaefer, D. (2022). Construction Research Congress, ASCE."},{"key":"ref_23","unstructured":"AlChaer, E., and Issa, C. (2021). Computing in Civil Engineering, ASCE."},{"key":"ref_24","doi-asserted-by":"crossref","first-page":"1239","DOI":"10.1111\/mice.12917","article-title":"Scenario-oriented Repetitive Project Scheduling Optimization","volume":"38","author":"Hu","year":"2023","journal-title":"Comput. -Aided Civ. Infrastruct. Eng."},{"key":"ref_25","doi-asserted-by":"crossref","first-page":"923","DOI":"10.1111\/mice.12547","article-title":"Construction Project Scheduling under Workspace Interference","volume":"35","author":"Tao","year":"2020","journal-title":"Comput. -Aided Civ. Infrastruct. Eng."},{"key":"ref_26","unstructured":"Haider, M. (2015). Getting Started with Data Science: Making Sense of Data with Analytics, IBM Press."},{"key":"ref_27","doi-asserted-by":"crossref","first-page":"44","DOI":"10.1186\/s40537-019-0206-3","article-title":"Uncertainty in Big Data Analytics: Survey, Opportunities, and Challenges","volume":"6","author":"Hariri","year":"2019","journal-title":"J. Big Data"},{"key":"ref_28","doi-asserted-by":"crossref","first-page":"158","DOI":"10.1287\/msom.2019.0805","article-title":"Data Analytics in Operations Management: A Review","volume":"22","author":"Perakis","year":"2020","journal-title":"Manuf. Serv. Oper. Manag."},{"key":"ref_29","doi-asserted-by":"crossref","unstructured":"Kelleher, J.D., and Tierney, B. (2018). Data Science, MIT Press.","DOI":"10.7551\/mitpress\/11140.001.0001"},{"key":"ref_30","doi-asserted-by":"crossref","first-page":"92","DOI":"10.1016\/j.jik.2020.08.001","article-title":"Using Data Sciences in Digital Marketing: Framework, Methods, and Performance Metrics","volume":"6","author":"Saura","year":"2021","journal-title":"J. Innov. Knowl."},{"key":"ref_31","doi-asserted-by":"crossref","first-page":"706","DOI":"10.1108\/ECAM-02-2020-0135","article-title":"Big Data, Technology Capability and Construction Project Quality: A Cross-Level Investigation","volume":"28","author":"Sang","year":"2021","journal-title":"Eng. Constr. Archit. Manag."},{"key":"ref_32","doi-asserted-by":"crossref","first-page":"1647","DOI":"10.1108\/ECAM-09-2019-0511","article-title":"A Review of Integrated Applications of BIM and Related Technologies in Whole Building Life Cycle","volume":"27","author":"Meng","year":"2020","journal-title":"Eng. Constr. Archit. Manag."},{"key":"ref_33","doi-asserted-by":"crossref","first-page":"04020072","DOI":"10.1061\/(ASCE)CO.1943-7862.0001846","article-title":"Codification Challenges for Data Science in Construction","volume":"146","author":"Soman","year":"2020","journal-title":"J. Constr. Eng. Manag."},{"key":"ref_34","unstructured":"Maqsoom, A., Ali, U., ul Basharat, M., Naeem, M.H., and Irfan, M. (2023). ASCE Inspire, ASCE."},{"key":"ref_35","doi-asserted-by":"crossref","first-page":"04521042","DOI":"10.1061\/(ASCE)LA.1943-4170.0000514","article-title":"Leveraging the Value of Project Scope Growth through Construction Manager-at-Risk Delivery of Public University Capital Improvement Projects","volume":"14","author":"Gransberg","year":"2022","journal-title":"J. Leg. Aff. Disput. Resolut. Eng. Constr."},{"key":"ref_36","doi-asserted-by":"crossref","first-page":"103081","DOI":"10.1016\/j.autcon.2020.103081","article-title":"Artificial Intelligence in the AEC Industry: Scientometric Analysis and Visualization of Research Activities","volume":"112","author":"Darko","year":"2020","journal-title":"Autom. Constr."},{"key":"ref_37","doi-asserted-by":"crossref","first-page":"121458","DOI":"10.1016\/j.jclepro.2020.121458","article-title":"Research Trend of the Application of Information Technologies in Construction and Demolition Waste Management","volume":"263","author":"Li","year":"2020","journal-title":"J. Clean. Prod."},{"key":"ref_38","doi-asserted-by":"crossref","first-page":"e1424","DOI":"10.1002\/widm.1424","article-title":"Explainable Artificial Intelligence: An Analytical Review","volume":"11","author":"Angelov","year":"2021","journal-title":"Wiley Interdiscip. Rev. Data Min. Knowl. Discov."},{"key":"ref_39","unstructured":"Boden, M.A. (2017). Inteligencia Artificial, Turner."},{"key":"ref_40","doi-asserted-by":"crossref","first-page":"652","DOI":"10.3390\/ai4030034","article-title":"Explainable Artificial Intelligence (XAI): Concepts and Challenges in Healthcare","volume":"4","author":"Hulsen","year":"2023","journal-title":"AI"},{"key":"ref_41","unstructured":"Rouhiainen, L. (2018). Inteligencia Artificial, Alienta Editorial."},{"key":"ref_42","first-page":"100224","article-title":"Study on Artificial Intelligence: The State of the Art and Future Prospects","volume":"23","author":"Zhang","year":"2021","journal-title":"J. Ind. Inf. Integr."},{"key":"ref_43","doi-asserted-by":"crossref","first-page":"103299","DOI":"10.1016\/j.jobe.2021.103299","article-title":"Artificial Intelligence in the Construction Industry: A Review of Present Status, Opportunities and Future Challenges","volume":"44","author":"Abioye","year":"2021","journal-title":"J. Build. Eng."},{"key":"ref_44","doi-asserted-by":"crossref","first-page":"04015064","DOI":"10.1061\/(ASCE)CP.1943-5487.0000538","article-title":"The Role of Information Technologies to Address Data Handling in Construction Project Management","volume":"30","author":"Vila","year":"2016","journal-title":"J. Comput. Civ. Eng."},{"key":"ref_45","doi-asserted-by":"crossref","first-page":"03119008","DOI":"10.1061\/(ASCE)CO.1943-7862.0001678","article-title":"Artificial Intelligence and Parametric Construction Cost Estimate Modeling: State-of-the-Art Review","volume":"146","author":"Elmousalami","year":"2020","journal-title":"J. Constr. Eng. Manag."},{"key":"ref_46","doi-asserted-by":"crossref","first-page":"702","DOI":"10.1111\/mice.12904","article-title":"Graph-based Deep Learning Model for Knowledge Base Completion in Constraint Management of Construction Projects","volume":"38","author":"Wu","year":"2023","journal-title":"Comput. -Aided Civ. Infrastruct. Eng."},{"key":"ref_47","doi-asserted-by":"crossref","first-page":"6674980","DOI":"10.1155\/2021\/6674980","article-title":"Research Status and Challenges of Data-Driven Construction Project Management in the Big Data Context","volume":"2021","author":"Huang","year":"2021","journal-title":"Adv. Civ. Eng."},{"key":"ref_48","doi-asserted-by":"crossref","unstructured":"Petticrew, M., and Roberts, H. (2006). Systematic Reviews in the Social Sciences: A Practical Guide, Wiley-Blackwell.","DOI":"10.1002\/9780470754887"},{"key":"ref_49","first-page":"13","article-title":"de Game-Based Learning (GBL) Applied to the Teaching of Mathematics in Higher Education. A Systematic Review of the Literature","volume":"13","year":"2020","journal-title":"Form. Univ."},{"key":"ref_50","doi-asserted-by":"crossref","first-page":"736","DOI":"10.3102\/0034654317704306","article-title":"van der Team-Based Professional Development Interventions in Higher Education: A Systematic Review","volume":"87","author":"Gast","year":"2017","journal-title":"Rev. Educ. Res."},{"key":"ref_51","doi-asserted-by":"crossref","first-page":"1033","DOI":"10.24136\/oc.2021.034","article-title":"Neuromanagement Decision-Making and Cognitive Algorithmic Processes in the Technological Adoption of Mobile Commerce Apps","volume":"12","author":"Andronie","year":"2021","journal-title":"Oeconomia Copernic."},{"key":"ref_52","doi-asserted-by":"crossref","unstructured":"Balcerzak, A.P., Nica, E., Rogalska, E., Poliak, M., Klie\u0161tik, T., and Sabie, O.-M. (2022). Blockchain Technology and Smart Contracts in Decentralized Governance Systems. Adm. Sci., 12.","DOI":"10.3390\/admsci12030096"},{"key":"ref_53","doi-asserted-by":"crossref","first-page":"101827","DOI":"10.1016\/j.jobe.2020.101827","article-title":"Deep Learning in the Construction Industry: A Review of Present Status and Future Innovations","volume":"32","author":"Akinosho","year":"2020","journal-title":"J. Build. Eng."},{"key":"ref_54","doi-asserted-by":"crossref","first-page":"04014063","DOI":"10.1061\/(ASCE)CO.1943-7862.0000915","article-title":"Comparing AHP and CBA as Decision Methods to Resolve the Choosing Problem in Detailed Design","volume":"141","author":"Arroyo","year":"2015","journal-title":"J. Constr. Eng. Manag."},{"key":"ref_55","doi-asserted-by":"crossref","first-page":"269","DOI":"10.1016\/j.aei.2019.02.002","article-title":"A Framework for Data-Driven Informatization of the Construction Company","volume":"39","author":"You","year":"2019","journal-title":"Adv. Eng. Inform."},{"key":"ref_56","doi-asserted-by":"crossref","first-page":"502","DOI":"10.1080\/01446193.2019.1616789","article-title":"Performance-Based Control of Variability and Tolerance in off-Site Manufacture and Assembly: Optimization of Penalty on Poor Production Quality","volume":"38","author":"Arashpour","year":"2020","journal-title":"Constr. Manag. Econ."},{"key":"ref_57","doi-asserted-by":"crossref","first-page":"101245","DOI":"10.1016\/j.aei.2020.101245","article-title":"Semantic Enrichment of Building and City Information Models: A Ten-Year Review","volume":"47","author":"Xue","year":"2021","journal-title":"Adv. Eng. Inform."},{"key":"ref_58","doi-asserted-by":"crossref","first-page":"100850","DOI":"10.1016\/j.jobe.2019.100850","article-title":"Investigating Profitability Performance of Construction Projects Using Big Data: A Project Analytics Approach","volume":"26","author":"Bilal","year":"2019","journal-title":"J. Build. Eng."},{"key":"ref_59","doi-asserted-by":"crossref","first-page":"103175","DOI":"10.1016\/j.autcon.2020.103175","article-title":"(Rick) Evaluating Industrial Modularization Strategies: Local vs. Overseas Fabrication","volume":"114","author":"Taghaddos","year":"2020","journal-title":"Autom. Constr."},{"key":"ref_60","doi-asserted-by":"crossref","first-page":"04020020","DOI":"10.1061\/(ASCE)ME.1943-5479.0000784","article-title":"Predicting the Volatility of Highway Construction Cost Index Using Long Short-Term Memory","volume":"36","author":"Cao","year":"2020","journal-title":"J. Manag. Eng."},{"key":"ref_61","doi-asserted-by":"crossref","first-page":"103001","DOI":"10.1016\/j.autcon.2019.103001","article-title":"Knowledge-Based System for Resolving Design Clashes in Building Information Models","volume":"110","author":"Hsu","year":"2020","journal-title":"Autom. Constr."},{"key":"ref_62","doi-asserted-by":"crossref","first-page":"110324","DOI":"10.1109\/ACCESS.2020.3001968","article-title":"Overview of Applications of the Sensor Technologies for Construction Machinery","volume":"8","author":"Jiang","year":"2020","journal-title":"IEEE Access"},{"key":"ref_63","doi-asserted-by":"crossref","first-page":"2489","DOI":"10.1007\/s00521-017-2840-z","article-title":"Estimating Construction Duration of Diaphragm Wall Using Firefly-Tuned Least Squares Support Vector Machine","volume":"30","author":"Cheng","year":"2018","journal-title":"Neural Comput. Applic"},{"key":"ref_64","doi-asserted-by":"crossref","unstructured":"Salem, T., and Dragomir, M. (2022). Options for and Challenges of Employing Digital Twins in Construction Management. Appl. Sci., 12.","DOI":"10.3390\/app12062928"},{"key":"ref_65","doi-asserted-by":"crossref","first-page":"19195","DOI":"10.1109\/ACCESS.2021.3054468","article-title":"Guimar\u00e3es Automated Monitoring of Construction Sites of Electric Power Substations Using Deep Learning","volume":"9","author":"Oliveira","year":"2021","journal-title":"IEEE Access"},{"key":"ref_66","doi-asserted-by":"crossref","first-page":"103929","DOI":"10.1016\/j.autcon.2021.103929","article-title":"Transformer Machine Learning Language Model for Auto-Alignment of Long-Term and Short-Term Plans in Construction","volume":"132","author":"Amer","year":"2021","journal-title":"Autom. Constr."},{"key":"ref_67","first-page":"1","article-title":"The Effectiveness of Project Management Construction with Data Mining and Blockchain Consensus","volume":"1","author":"Li","year":"2021","journal-title":"J. Ambient. Intell. Humaniz. Comput."},{"key":"ref_68","doi-asserted-by":"crossref","first-page":"109869","DOI":"10.1016\/j.chaos.2020.109869","article-title":"Symbiotic Organisms Search-Optimized Deep Learning Technique for Mapping Construction Cash Flow Considering Complexity of Project","volume":"138","author":"Cheng","year":"2020","journal-title":"Chaos Solitons Fractals"},{"key":"ref_69","doi-asserted-by":"crossref","first-page":"162","DOI":"10.1016\/j.wasman.2020.03.024","article-title":"An Anatomy of Waste Generation Flows in Construction Projects Using Passive Bigger Data","volume":"106","author":"Xu","year":"2020","journal-title":"Waste Manag."},{"key":"ref_70","doi-asserted-by":"crossref","first-page":"1820631","DOI":"10.1155\/2018\/1820631","article-title":"Development and Application of an Industry Foundation Classes-Based Metro Protection Information Model","volume":"2018","author":"Zhou","year":"2018","journal-title":"Math. Probl. Eng."},{"key":"ref_71","doi-asserted-by":"crossref","first-page":"03122004","DOI":"10.1061\/(ASCE)CO.1943-7862.0002324","article-title":"Artificial Intelligence and Robotics for Prefabricated and Modular Construction: A Systematic Literature Review","volume":"148","author":"Pan","year":"2022","journal-title":"J. Constr. Eng. Manag."},{"key":"ref_72","doi-asserted-by":"crossref","first-page":"03122005","DOI":"10.1061\/(ASCE)CO.1943-7862.0002347","article-title":"Implementing Remote-Sensing Methodologies for Construction Research: An Unoccupied Airborne System Perspective","volume":"148","author":"Zhang","year":"2022","journal-title":"J. Constr. Eng. Manag."},{"key":"ref_73","doi-asserted-by":"crossref","first-page":"2663","DOI":"10.1007\/s00366-021-01420-9","article-title":"An Intelligent Fuzzy-Based Hybrid Metaheuristic Algorithm for Analysis the Strength, Energy and Cost Optimization of Building Material in Construction Management","volume":"38","author":"Ronghui","year":"2022","journal-title":"Eng. Comput."},{"key":"ref_74","doi-asserted-by":"crossref","first-page":"104711","DOI":"10.1016\/j.engappai.2022.104711","article-title":"A Genetic Algorithm Tool for Conceptual Structural Design with Cost and Embodied Carbon Optimization","volume":"112","author":"Kanyilmaz","year":"2022","journal-title":"Eng. Appl. Artif. Intell."},{"key":"ref_75","first-page":"7908649","article-title":"Construction Project Cost Management and Control System Based on Big Data","volume":"2022","author":"Chen","year":"2022","journal-title":"Mob. Inf. Syst."},{"key":"ref_76","doi-asserted-by":"crossref","unstructured":"Fang, L., Mei, B., Jiang, L., and Sun, J. (2020, January 3\u20135). Investigation of Intelligent Safety Management Information System for Nuclear Power Construction Projects. Proceedings of the 3rd International Conference on Information Technologies and Electrical Engineering, Hunan, China.","DOI":"10.1145\/3452940.3453058"},{"key":"ref_77","doi-asserted-by":"crossref","unstructured":"Jianfeng, Z., Yechao, J., and Fang, L. (2020, January 13\u201314). Construction of Intelligent Building Design System Based on BIM and AI. Proceedings of the 2020 5th International Conference on Smart Grid and Electrical Automation (ICSGEA), Zhangjiajie, China.","DOI":"10.1109\/ICSGEA51094.2020.00066"},{"key":"ref_78","first-page":"884","article-title":"Artificial Intelligence in Construction Asset Management: A Review of Present Status, Challenges and Future Opportunities","volume":"27","author":"Rampini","year":"2022","journal-title":"J. Inf. Technol. Constr."},{"key":"ref_79","doi-asserted-by":"crossref","first-page":"4285328","DOI":"10.1155\/2022\/4285328","article-title":"Developing an Integrative Data Intelligence Model for Construction Cost Estimation","volume":"2022","author":"Ali","year":"2022","journal-title":"Complexity"},{"key":"ref_80","doi-asserted-by":"crossref","first-page":"72936","DOI":"10.1109\/ACCESS.2022.3189157","article-title":"Intelligent Risk Management in Construction Projects: Systematic Literature Review","volume":"10","author":"Chenya","year":"2022","journal-title":"IEEE Access"},{"key":"ref_81","first-page":"554","article-title":"Automated Progress Monitoring of Construction Projects Using Machine Learning and Image Processing Approach","volume":"65","author":"Edayadiyil","year":"2022","journal-title":"Mater. Today: Proc."},{"key":"ref_82","first-page":"864","article-title":"Acceptance of Contemporary Technologies for Cost Management of Construction Projects","volume":"27","author":"Igwe","year":"2022","journal-title":"J. Inf. Technol. Constr."},{"key":"ref_83","doi-asserted-by":"crossref","unstructured":"Feng, N. (2022). The Influence Mechanism of BIM on Green Building Engineering Project Management under the Background of Big Data. Appl. Bionics Biomech., 2022.","DOI":"10.1155\/2022\/8227930"},{"key":"ref_84","doi-asserted-by":"crossref","first-page":"4080879","DOI":"10.1155\/2022\/4080879","article-title":"Exploring the Application of BIM Technology in the Whole Process of Construction Cost Management with Computational Intelligence","volume":"2022","author":"Tang","year":"2022","journal-title":"Comput. Intell. Neurosci."},{"key":"ref_85","first-page":"2363669","article-title":"Development of Economic Evaluation System for Building Project Based on Computer Technology","volume":"2022","author":"Chen","year":"2022","journal-title":"Mob. Inf. Syst."},{"key":"ref_86","first-page":"5602842","article-title":"Artificial Intelligence Technology Based on Deep Learning in Building Construction Management System Modeling","volume":"2022","author":"Wang","year":"2022","journal-title":"Adv. Multimed."},{"key":"ref_87","first-page":"235","article-title":"Complex Works Project Management Enhanced by Digital Technologies","volume":"205","author":"Ruperto","year":"2021","journal-title":"Build. Inf. Model. (BIM) Des. Constr. Oper. IV"},{"key":"ref_88","doi-asserted-by":"crossref","unstructured":"Wang, T. (2021). Research on Detailed Design of Prefabricated Building Based on BIM and Big Data, IOP Publishing.","DOI":"10.1088\/1742-6596\/2037\/1\/012133"},{"key":"ref_89","doi-asserted-by":"crossref","unstructured":"Qian, Z., Yang, X., Xu, Z., and Cai, W. (2021). Research on Key Construction Technology of Building Engineering under the Background of Big Data, IOP Publishing.","DOI":"10.1088\/1742-6596\/1802\/3\/032003"},{"key":"ref_90","unstructured":"Wang, N., Issa, R., and Anumba, C. (2022). Computing in Civil Engineering, ACSE."},{"key":"ref_91","doi-asserted-by":"crossref","unstructured":"Pan, J., and Rao, Y. (2021, January 3\u20135). Research on Digital Collaborative Management Model of Engineering Projects Based on BIM and IPD. Proceedings of the 2021 2nd International Conference on Big Data Economy and Information Management (BDEIM), Sanya, China.","DOI":"10.1109\/BDEIM55082.2021.00018"},{"key":"ref_92","doi-asserted-by":"crossref","unstructured":"Tian, Y., Ma, T., and Khan, M.K. (2021). Proceedings of the Big Data and Security, Springer.","DOI":"10.1007\/978-981-16-3150-4"},{"key":"ref_93","doi-asserted-by":"crossref","unstructured":"Pfahlsberger, L., and Mendling, J. (2021, January 5\u20138). Design of a Process Mining Alignment Method for Building Big Data Analytics Capabilities. Proceedings of the 54th Annual Hawaii International Conference on System Sciences, HICSS, Kauai Island, HI, USA.","DOI":"10.24251\/HICSS.2021.688"},{"key":"ref_94","unstructured":"G\u00f3recki, J. (2018). Risk Management Treatise for Engineering Practitioners, IntechOpen."},{"key":"ref_95","doi-asserted-by":"crossref","first-page":"516","DOI":"10.1016\/j.procs.2018.10.071","article-title":"Data Lakes in Business Intelligence: Reporting from the Trenches","volume":"138","author":"Llave","year":"2018","journal-title":"Procedia Comput. Sci."},{"key":"ref_96","unstructured":"Han, Z., and Wang, Y. (2017). ICCREM, American Society of Civil Engineers."},{"key":"ref_97","unstructured":"Honcharenko, T., Kyivska, K., Serpinska, O., Savenko, V., Kysliuk, D., and Orlyk, Y. (2021, January 16\u201318). Digital Transformation of the Construction Design Based on the Building Information Modeling and Internet of Things. Proceedings of the ITTAP, Ternopil, Ukraine."},{"key":"ref_98","doi-asserted-by":"crossref","unstructured":"Boton, C., Halin, G., Kubicki, S., and Forgues, D. (2015, January 20\u201323). Challenges of Big Data in the Age of Building Information Modeling: A High-Level Conceptual Pipeline. Proceedings of the Cooperative Design, Visualization, and Engineering: 12th International Conference, CDVE 2015, Mallorca, Spain.","DOI":"10.1007\/978-3-319-24132-6_6"},{"key":"ref_99","doi-asserted-by":"crossref","unstructured":"Yuan, X., Chen, Y.-W., Fan, H., He, W.-H., and Ming, X.G. (2019, January 15\u201318). Collaborative Construction Industry Integrated Management Service System Framework Based on Big Data. Proceedings of the 2019 IEEE International Conference on Industrial Engineering and Engineering Management (IEEM), Macao, China.","DOI":"10.1109\/IEEM44572.2019.8978624"},{"key":"ref_100","unstructured":"Project Management Institute (2017). Gu\u00eda de Los Fundamentos Para La Direcci\u00f3n de Proyectos (Gu\u00eda Del Pmbok), Project Management Institute. [6th ed.]."},{"key":"ref_101","unstructured":"Zandi, Y., Issakhov, A., Roco Videla, \u00c1., Wakil, K., Wang, Q., Cao, Y., Selmi, A., Agdas, A.S., Fu, L., and Qian, X. (2021). A Review Study of Application of Artificial Intelligence in Construction Management and Composite Beams, University of California Santa Cruz."},{"key":"ref_102","unstructured":"Fletcher, D. (2015). The Internet of Things (IoT)\u2014Essential IoT Business Guide, Springer."},{"key":"ref_103","doi-asserted-by":"crossref","unstructured":"Shen, X., Lin, X., and Zhang, K. (2020). Encyclopedia of Wireless Networks, Springer International Publishing.","DOI":"10.1007\/978-3-319-32903-1"},{"key":"ref_104","doi-asserted-by":"crossref","unstructured":"Yao, H., and Guizani, M. (2023). Intelligent Internet of Things Networks, Springer.","DOI":"10.1007\/978-3-031-26987-5"}],"container-title":["Buildings"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/www.mdpi.com\/2075-5309\/13\/12\/2944\/pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,10,10]],"date-time":"2025-10-10T21:30:13Z","timestamp":1760131813000},"score":1,"resource":{"primary":{"URL":"https:\/\/www.mdpi.com\/2075-5309\/13\/12\/2944"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2023,11,25]]},"references-count":104,"journal-issue":{"issue":"12","published-online":{"date-parts":[[2023,12]]}},"alternative-id":["buildings13122944"],"URL":"https:\/\/doi.org\/10.3390\/buildings13122944","relation":{},"ISSN":["2075-5309"],"issn-type":[{"value":"2075-5309","type":"electronic"}],"subject":[],"published":{"date-parts":[[2023,11,25]]}}}