{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,4,22]],"date-time":"2026-04-22T12:37:33Z","timestamp":1776861453839,"version":"3.51.2"},"reference-count":101,"publisher":"MDPI AG","issue":"6","license":[{"start":{"date-parts":[[2025,5,26]],"date-time":"2025-05-26T00:00:00Z","timestamp":1748217600000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by\/4.0\/"}],"funder":[{"DOI":"10.13039\/501100001871","name":"Funda\u00e7\u00e3o para a Ci\u00eancia e Tecnologia","doi-asserted-by":"publisher","award":["UI\/BD\/151165\/2021"],"award-info":[{"award-number":["UI\/BD\/151165\/2021"]}],"id":[{"id":"10.13039\/501100001871","id-type":"DOI","asserted-by":"publisher"}]},{"DOI":"10.13039\/501100001871","name":"Funda\u00e7\u00e3o para a Ci\u00eancia e Tecnologia","doi-asserted-by":"publisher","award":["UID\/00319\/Centro ALGORITMI (ALGORITMI\/UM)"],"award-info":[{"award-number":["UID\/00319\/Centro ALGORITMI (ALGORITMI\/UM)"]}],"id":[{"id":"10.13039\/501100001871","id-type":"DOI","asserted-by":"publisher"}]},{"DOI":"10.13039\/501100001871","name":"Funda\u00e7\u00e3o para a Ci\u00eancia e Tecnologia","doi-asserted-by":"publisher","award":["UIDB\/05583\/2020"],"award-info":[{"award-number":["UIDB\/05583\/2020"]}],"id":[{"id":"10.13039\/501100001871","id-type":"DOI","asserted-by":"publisher"}]}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Algorithms"],"abstract":"<jats:p>This paper presents a narrative review on the Resource-Constrained Multi-Project Scheduling Problem (RCMPSP) under uncertainty and resource flexibility. Traditional project scheduling assumes complete information and a deterministic environment where a pre-computed baseline schedule is executed. However, real-world projects frequently face uncertainty, such as variable task durations and fluctuating resource availability. Analyzing studies from 2013 to 2024, this review examines optimization models addressing multiple objectives, including minimizing project duration, cost, and resource leveling. It categorizes solution approaches, from exact algorithms to heuristic and metaheuristic methods, while reviewing the primary instance sets and benchmarks used in the field. Additionally, it highlights the value of flexible resource management approaches that enable adaptive responses to real-time project demands, thereby enhancing scheduling robustness. By systematically addressing RCMPSP under uncertainty, this paper provides a valuable framework for researchers and practitioners seeking to develop resilient, adaptive scheduling solutions for complex, dynamic project environments.<\/jats:p>","DOI":"10.3390\/a18060314","type":"journal-article","created":{"date-parts":[[2025,5,27]],"date-time":"2025-05-27T05:52:52Z","timestamp":1748325172000},"page":"314","update-policy":"https:\/\/doi.org\/10.3390\/mdpi_crossmark_policy","source":"Crossref","is-referenced-by-count":3,"title":["Multi-Project Scheduling with Uncertainty and Resource Flexibility: A Narrative Review and Exploration of Future Landscapes"],"prefix":"10.3390","volume":"18","author":[{"ORCID":"https:\/\/orcid.org\/0000-0002-0048-002X","authenticated-orcid":false,"given":"Marzieh","family":"Aghileh","sequence":"first","affiliation":[{"name":"ALGORITMI Research Centre\/LASI, University of Minho, 4800-058 Guimar\u00e3es, Portugal"}]},{"ORCID":"https:\/\/orcid.org\/0000-0001-9802-0074","authenticated-orcid":false,"given":"Anabela","family":"Tereso","sequence":"additional","affiliation":[{"name":"ALGORITMI Research Centre\/LASI, University of Minho, 4800-058 Guimar\u00e3es, Portugal"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-1851-4339","authenticated-orcid":false,"given":"Filipe","family":"Alvelos","sequence":"additional","affiliation":[{"name":"ALGORITMI Research Centre\/LASI, University of Minho, 4800-058 Guimar\u00e3es, Portugal"}]},{"given":"Maria Odete Monteiro","family":"Lopes","sequence":"additional","affiliation":[{"name":"Mechanical Engineering and Industrial Management Department, Instituto Polit\u00e9cnico de Viseu, 5100-074 Viseu, Portugal"}]}],"member":"1968","published-online":{"date-parts":[[2025,5,26]]},"reference":[{"key":"ref_1","unstructured":"Villafa\u00f1ez, F., Lopez-Paredes, A., Pajares, J., and de la Fuente, D. (2014, January 18\u201320). From the RCPSP to the DRCMPSP: Methodological foundations. Proceedings of the International Conference on Artificial Intelligence (ICAI), Sousse, Tunis. The Steering Committee of the World Congress in Computer Science, Computer Engineering and Applied Computing (WorldComp)."},{"key":"ref_2","doi-asserted-by":"crossref","first-page":"3465","DOI":"10.1007\/s00500-017-3003-y","article-title":"A generic heuristic for multi-project scheduling problems with global and local resource constraints (RCMPSP)","volume":"23","author":"Poza","year":"2019","journal-title":"Soft Comput."},{"key":"ref_3","doi-asserted-by":"crossref","unstructured":"Rokou, E., Dermitzakis, M., and Kirytopoulos, K. (2014, January 9\u201312). Multi-project flexible resource profiles project scheduling with Ant Colony Optimization. Proceedings of the 2014 IEEE International Conference on Industrial Engineering and Engineering Management, Selangor, Malaysia. Available online: http:\/\/ieeexplore.ieee.org\/document\/7058717\/.","DOI":"10.1109\/IEEM.2014.7058717"},{"key":"ref_4","doi-asserted-by":"crossref","first-page":"211","DOI":"10.1007\/s10951-017-0553-x","article-title":"The proactive and reactive resource-constrained project scheduling problem","volume":"22","author":"Davari","year":"2019","journal-title":"J. Sched."},{"key":"ref_5","doi-asserted-by":"crossref","first-page":"599","DOI":"10.1504\/EJIE.2020.109899","article-title":"Project management under uncertainty: Using flexible resource management to exploit schedule flexibility","volume":"14","author":"Faria","year":"2020","journal-title":"Eur. J. Ind. Eng."},{"key":"ref_6","doi-asserted-by":"crossref","first-page":"381","DOI":"10.1016\/j.procs.2019.12.197","article-title":"Project management under uncertainty: Resource flexibility visualization in the schedule","volume":"164","author":"Lima","year":"2019","journal-title":"Procedia Comput. Sci."},{"key":"ref_7","doi-asserted-by":"crossref","first-page":"335","DOI":"10.1016\/j.ejor.2014.05.036","article-title":"MIP models for resource-constrained project scheduling with flexible resource profiles","volume":"239","author":"Naber","year":"2014","journal-title":"Eur. J. Oper. Res."},{"key":"ref_8","doi-asserted-by":"crossref","first-page":"262","DOI":"10.1016\/j.ejor.2017.03.006","article-title":"A hybrid metaheuristic for resource-constrained project scheduling with flexible resource profiles","volume":"262","author":"Tritschler","year":"2017","journal-title":"Eur. J. Oper. Res."},{"key":"ref_9","first-page":"1","article-title":"Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach","volume":"16","author":"Pritsker","year":"1969","journal-title":"Manag. Sci."},{"key":"ref_10","unstructured":"Marimuthu, K., Raphael, B., Ananthanarayanan, K., Palaneeswaran, E., and Bodaghi, B. (2017, January 20\u201323). An overview of multi-project scheduling problems in India with resource constrained and unconstrained settings. Proceedings of the 22nd International Conference on Advancement of Construction Management and Real Estate, Melbourne, Australia."},{"key":"ref_11","unstructured":"ElFiky, H., Owida, A., and Galal, N.M. (2020, January 10\u201312). Resource Constrained Multi-Project Scheduling Using Priority Rules: Application in the Deep-Water Construction Industry. Proceedings of the International Conference on Industrial Engineering and Operations Management, Dubai, United Arab Emirates."},{"key":"ref_12","doi-asserted-by":"crossref","first-page":"1922","DOI":"10.4304\/jcp.9.8.1922-1927","article-title":"A Modified Differential Evolution Algorithm for Resource Constrained Multi-project Scheduling Problem","volume":"9","author":"Yan","year":"2014","journal-title":"J. Comput."},{"key":"ref_13","doi-asserted-by":"crossref","first-page":"04014072","DOI":"10.1061\/(ASCE)CP.1943-5487.0000382","article-title":"Backward-Forward Hybrid Genetic Algorithm for Resource-Constrained Multiproject Scheduling Problem","volume":"29","author":"Sonmez","year":"2015","journal-title":"J. Comput. Civ. Eng."},{"key":"ref_14","doi-asserted-by":"crossref","unstructured":"Shu, X., Su, Q., Wang, Q., and Wang, Q. (2018, January 21\u201322). Optimization of Resource-Constrained Multi-Project Scheduling Problem Based on the Genetic Algorithm. Proceedings of the 2018 15th International Conference on Service Systems and Service Management (ICSSSM), Hangzhou, China. Available online: https:\/\/ieeexplore.ieee.org\/document\/8465086\/.","DOI":"10.1109\/ICSSSM.2018.8465086"},{"key":"ref_15","doi-asserted-by":"crossref","first-page":"88986","DOI":"10.1109\/ACCESS.2019.2926337","article-title":"Proactive and Reactive Multi-Project Scheduling in Uncertain Environment","volume":"7","author":"Weixin","year":"2019","journal-title":"IEEE Access"},{"key":"ref_16","doi-asserted-by":"crossref","first-page":"530","DOI":"10.1080\/18756891.2013.789152","article-title":"Resource-constraint Multi-project Scheduling with Priorities and Uncertain Activity Durations","volume":"6","author":"Zheng","year":"2013","journal-title":"Int. J. Comput. Intell. Syst."},{"key":"ref_17","first-page":"825","article-title":"Ablaufplanung f\u00fcr die Leitstrukturoptimierung in der Pharmaforschung (Scheduling of lead structure optimization in pharmaceutical research)","volume":"73","author":"Kolisch","year":"2003","journal-title":"Z. F\u00fcr Betr. Swirtschaft"},{"key":"ref_18","first-page":"25","article-title":"Resource-Constrained Project Scheduling Problem with Flexible Work Profiles: A Genetic Algorithm Approach","volume":"17","author":"Ranjbar","year":"2010","journal-title":"Sci. Iran."},{"key":"ref_19","first-page":"2319574","article-title":"Multi-project scheduling under uncertainty and resource flexibility: A systematic literature review","volume":"12","author":"Aghileh","year":"2024","journal-title":"Prod. Manuf. Res."},{"key":"ref_20","doi-asserted-by":"crossref","first-page":"174","DOI":"10.1108\/AA-09-2020-0132","article-title":"Modeling and algorithm for resource-constrained multi-project scheduling problem based on detection and rework","volume":"41","author":"Zhu","year":"2021","journal-title":"Assem. Autom."},{"key":"ref_21","doi-asserted-by":"crossref","first-page":"106060","DOI":"10.1016\/j.cie.2019.106060","article-title":"Research on priority rules for the stochastic resource constrained multi-project scheduling problem with new project arrival","volume":"137","author":"Chen","year":"2019","journal-title":"Comput. Ind. Eng."},{"key":"ref_22","doi-asserted-by":"crossref","first-page":"223","DOI":"10.1016\/j.cie.2017.10.021","article-title":"On the performance of priority rules for the stochastic resource constrained multi-project scheduling problem","volume":"114","author":"Wang","year":"2017","journal-title":"Comput. Ind. Eng."},{"key":"ref_23","doi-asserted-by":"crossref","first-page":"853","DOI":"10.1016\/j.ejor.2021.10.006","article-title":"New summary measures and datasets for the multi-project scheduling problem","volume":"299","author":"Vanhoucke","year":"2022","journal-title":"Eur. J. Oper. Res."},{"key":"ref_24","doi-asserted-by":"crossref","unstructured":"K\u00fchn, M., V\u00f6lker, M., and Schmidt, T. (2020). An Algorithm for Efficient Generation of Customized Priority Rules for Production Control in Project Manufacturing with Stochastic Job Processing Times. Algorithms, 13.","DOI":"10.3390\/a13120337"},{"key":"ref_25","doi-asserted-by":"crossref","first-page":"54","DOI":"10.1016\/j.ejor.2022.11.009","article-title":"Multi-project scheduling: A benchmark analysis of metaheuristic algorithms on various optimisation criteria and due dates","volume":"308","author":"Bredael","year":"2023","journal-title":"Eur. J. Oper. Res."},{"key":"ref_26","doi-asserted-by":"crossref","first-page":"S34","DOI":"10.1002\/tee.22324","article-title":"A genetic algorithm with local search using activity list characteristics for solving resource-constrained multiproject scheduling problem","volume":"11","author":"Okada","year":"2016","journal-title":"IEEJ Trans. Electr. Electron. Eng."},{"key":"ref_27","unstructured":"Besikci, U., Ulusoy, G., and Bilge, U. (2013, January 8\u201330). A Combination of Different Resource Management Policies in a Multi-Project Environment. Proceedings of the International Conference on Industrial Engineering and Systems Management, Rabat, Morocco."},{"key":"ref_28","doi-asserted-by":"crossref","first-page":"9776","DOI":"10.1016\/j.apm.2013.05.013","article-title":"Minimizing total weighted late work in the resource-constrained project scheduling problem","volume":"37","author":"Ranjbar","year":"2013","journal-title":"Appl. Math. Model."},{"key":"ref_29","first-page":"361","article-title":"Robust Optimization for the Resource Constrained Multi-Project Scheduling Problem with Uncertain Activity Durations","volume":"17","author":"Aghaie","year":"2018","journal-title":"Sci. Iran."},{"key":"ref_30","first-page":"143","article-title":"Solving Multi-Mode Resource-Constrained Multi-Project Scheduling Problem with Combinatorial Auction Mechanisms","volume":"30","author":"Cheng","year":"2019","journal-title":"Int. J. Inf. Manag. Sci."},{"key":"ref_31","doi-asserted-by":"crossref","first-page":"569","DOI":"10.1007\/s10479-024-05841-9","article-title":"The performance of priority rules for the dynamic stochastic resource-constrained multi-project scheduling problem: An experimental investigation","volume":"338","author":"Melchiors","year":"2024","journal-title":"Ann. Oper. Res."},{"key":"ref_32","doi-asserted-by":"crossref","first-page":"425","DOI":"10.1007\/s10479-024-05854-4","article-title":"A robust multi-project scheduling problem under a resource dedication-transfer policy","volume":"337","author":"Zhao","year":"2024","journal-title":"Ann. Oper. Res."},{"key":"ref_33","first-page":"1391","article-title":"The Combinatorial Multi-Mode Resource Constrained Multi-Project Scheduling Problem","volume":"3","author":"Pinha","year":"2016","journal-title":"Int. J. Supply Oper. Manag."},{"key":"ref_34","unstructured":"Korotkov, V., and Matveev, M. (2024, January 1\u20133). Individual Scheduling for the Multi-Mode Resource_Constrained Multi-Project Scheduling Problem. Proceedings of the CEUR Workshop Proceedings, Aachen, Germany."},{"key":"ref_35","doi-asserted-by":"crossref","first-page":"688","DOI":"10.1016\/j.ejor.2022.01.018","article-title":"Integrated multi-project planning and scheduling\u2014A multiagent approach","volume":"302","author":"He","year":"2022","journal-title":"Eur. J. Oper. Res."},{"key":"ref_36","doi-asserted-by":"crossref","first-page":"206","DOI":"10.1007\/s10696-012-9140-9","article-title":"Resource dedication problem in a multi-project environment","volume":"25","author":"Besikci","year":"2013","journal-title":"Flex. Serv. Manuf. J."},{"key":"ref_37","doi-asserted-by":"crossref","unstructured":"Nie, H., and Liu, B. (2013, January 21\u201323). Combining MILP with Memetic Algorithm for Scheduling and Staffing Construction Project with a Multi-skilled Workforce. Proceedings of the 2013 International Conference on Computational and Information Sciences, Shiyang, China.","DOI":"10.1109\/ICCIS.2013.305"},{"key":"ref_38","doi-asserted-by":"crossref","unstructured":"Chen, J., Zhu, J., and Zhang, D. (2014, January 17\u201319). Multi-project scheduling problem with human resources based on dynamic programming and staff time coefficient. Proceedings of the 2014 International Conference on Management Science & Engineering 21st Annual Conference, Helsinki, Finland.","DOI":"10.1109\/ICMSE.2014.6930339"},{"key":"ref_39","doi-asserted-by":"crossref","first-page":"95","DOI":"10.1007\/s10479-014-1555-0","article-title":"Multi-project scheduling with two-stage decomposition","volume":"217","author":"Can","year":"2014","journal-title":"Ann. Oper. Res."},{"key":"ref_40","doi-asserted-by":"crossref","first-page":"295","DOI":"10.1007\/s10951-015-0422-4","article-title":"An integer programming approach to the multimode resource-constrained multiproject scheduling problem","volume":"19","author":"Toffolo","year":"2016","journal-title":"J. Sched."},{"key":"ref_41","unstructured":"Gonz\u00e1lez, G., Calder\u00f3n, C., Gonz\u00e1lez, D., and Trujillo, J. (2017, January 25\u201326). Priority Rules Performance Analysis as a GA Initial Population for RCMPSP. Proceedings of the International Conference on Industrial Engineering and Operations, Management, Bogota, Colombia."},{"key":"ref_42","first-page":"627","article-title":"Optimization of Time, Cost and Quality in Critical Chain Method Using Simulated Annealing","volume":"30","author":"Haghighi","year":"2017","journal-title":"Int. J. Eng."},{"key":"ref_43","doi-asserted-by":"crossref","unstructured":"Li, S., Dong, X., and Han, S. (2017, January 22\u201323). Research on a Multi-project Scheduling Optimization Algorithm with Resource Time-Windows. Proceedings of the 2nd International Conference on Computational Modeling, Simulation and Applied Mathematics, Beijing, China.","DOI":"10.12783\/dtcse\/cmsam2017\/16411"},{"key":"ref_44","doi-asserted-by":"crossref","unstructured":"Tian, J., Han, X., and Dong, S. (2018, January 22\u201323). Optimizing for a Resource-constrained Multi-project Scheduling Problem with Planned Resource Unavailability. Proceedings of the 3rd International Conference on Modelling, Simulation and Applied Mathematics, Shanghai, China.","DOI":"10.2991\/msam-18.2018.51"},{"key":"ref_45","doi-asserted-by":"crossref","unstructured":"Yuan, P., Han, W., Su, X., Liu, J., and Song, J. (2018). A Dynamic Scheduling Method for Carrier Aircraft Support Operation under Uncertain Conditions Based on Rolling Horizon Strategy. Appl. Sci., 8.","DOI":"10.3390\/app8091546"},{"key":"ref_46","doi-asserted-by":"crossref","unstructured":"Maher, G., Abd-El-Roaf, O., El-Hefnawy, N., and Kfafy, A. (2019, January 8\u201310). A Novel Approach for Multi-Resource Planning in Construction Engineering. Proceedings of the 2019 Ninth International Conference on Intelligent Computing and Information Systems (ICICIS), Cairo, Egypt.","DOI":"10.1109\/ICICIS46948.2019.9014772"},{"key":"ref_47","doi-asserted-by":"crossref","first-page":"298","DOI":"10.1016\/j.procir.2019.04.078","article-title":"A hybrid algorithm of product-service framework for the multi-project scheduling in ETO assembly process","volume":"83","author":"Jiang","year":"2019","journal-title":"Procedia CIRP"},{"key":"ref_48","doi-asserted-by":"crossref","unstructured":"Yang, D., Zhou, X., Yang, Z., Jiang, Q., and Feng, W. (2020, January 19\u201324). Multi-objective optimization Model for Flexible Job Shop Scheduling Problem Considering Transportation Constraints: A Comparative Study. Proceedings of the 2020 IEEE Congress on Evolutionary Computation (CEC), Glasgow, UK. Available online: https:\/\/ieeexplore.ieee.org\/document\/9185653\/.","DOI":"10.1109\/CEC48606.2020.9185653"},{"key":"ref_49","doi-asserted-by":"crossref","first-page":"106857","DOI":"10.1016\/j.cie.2020.106857","article-title":"Resource-constrained multi-project scheduling with activity and time flexibility","volume":"150","author":"Hauder","year":"2020","journal-title":"Comput. Ind. Eng."},{"key":"ref_50","doi-asserted-by":"crossref","first-page":"1334","DOI":"10.1080\/15732479.2021.1906711","article-title":"Resilience-based mathematical model to restore disrupted road-bridge transportation networks","volume":"18","author":"Somy","year":"2021","journal-title":"Struct. Infrastruct. Eng."},{"key":"ref_51","doi-asserted-by":"crossref","first-page":"107553","DOI":"10.1016\/j.cie.2021.107553","article-title":"A three-stage decomposition algorithm for decentralized multi-project scheduling under uncertainty","volume":"160","author":"Liu","year":"2021","journal-title":"Comput. Ind. Eng."},{"key":"ref_52","doi-asserted-by":"crossref","first-page":"107480","DOI":"10.1016\/j.asoc.2021.107480","article-title":"A variable neighborhood search approach for the resource-constrained multi-project collaborative scheduling problem","volume":"107","author":"Cui","year":"2021","journal-title":"Appl. Soft Comput."},{"key":"ref_53","unstructured":"Winklehnera, P., and Hauder, V.A. (2022, January 2\u20134). Flexible job-shop scheduling with release dates, deadlines and sequence dependent setup times: A real-world case. Proceedings of the 3rd International Conference on Industry 4.0 and Smart Manufacturing, Linz, Austria."},{"key":"ref_54","doi-asserted-by":"crossref","first-page":"42","DOI":"10.1080\/02533839.2021.1983461","article-title":"Applying hybrid genetic algorithm to multi-mode resource constrained multi-project scheduling problems","volume":"45","author":"Chen","year":"2022","journal-title":"J. Chin. Inst. Eng."},{"key":"ref_55","doi-asserted-by":"crossref","first-page":"109087","DOI":"10.1016\/j.asoc.2022.109087","article-title":"A two-stage genetic programming framework for Stochastic Resource Constrained Multi-Project Scheduling Problem under New Project Insertions","volume":"124","author":"Chen","year":"2022","journal-title":"Appl. Soft Comput."},{"key":"ref_56","doi-asserted-by":"crossref","first-page":"116911","DOI":"10.1016\/j.eswa.2022.116911","article-title":"A filtering genetic programming framework for stochastic resource constrained multi-project scheduling problem under new project insertions","volume":"198","author":"Chen","year":"2022","journal-title":"Expert Syst. Appl."},{"key":"ref_57","doi-asserted-by":"crossref","unstructured":"Zohrehvandi, S. (2022). A Project-Scheduling and Resource Management Heuristic Algorithm in the Construction of Combined Cycle Power Plant Projects. Computers, 11.","DOI":"10.3390\/computers11020023"},{"key":"ref_58","doi-asserted-by":"crossref","first-page":"1637","DOI":"10.1007\/s10479-023-05403-5","article-title":"A Benders decomposition algorithm for the multi-mode resource-constrained multi-project scheduling problem with uncertainty","volume":"339","author":"Sadeghloo","year":"2023","journal-title":"Ann. Oper. Res."},{"key":"ref_59","doi-asserted-by":"crossref","first-page":"96","DOI":"10.1016\/j.compchemeng.2014.05.009","article-title":"New continuous-time and discrete-time mathematical formulations for resource-constrained project scheduling problems","volume":"68","author":"Kopanos","year":"2014","journal-title":"Comput. Chem. Eng."},{"key":"ref_60","doi-asserted-by":"crossref","unstructured":"Wu, Y.N., and Ding, Y. (2015, January 5\u20136). Research on the resource-constrained government investment multi-project scheduling problems. Proceedings of the International Conference on Material Science and Environmental Engineering, Wuhan, China.","DOI":"10.1201\/b19346-161"},{"key":"ref_61","first-page":"1","article-title":"Multiple R&D Projects Scheduling Optimization with Improved Particle Swarm Algorithm","volume":"2014","author":"Liu","year":"2014","journal-title":"Sci. World J."},{"key":"ref_62","doi-asserted-by":"crossref","first-page":"13","DOI":"10.7454\/mst.v20i1.3050","article-title":"Multi-Project Scheduling Cost Optimization in a Machine Manufacturer Engineer-to-Order","volume":"20","author":"Farizal","year":"2016","journal-title":"Makara J. Technol."},{"key":"ref_63","doi-asserted-by":"crossref","first-page":"107","DOI":"10.1007\/s10951-015-0443-z","article-title":"An exact algorithm for an integrated project staffing problem with a homogeneous workforce","volume":"19","author":"Maenhout","year":"2016","journal-title":"J. Sched."},{"key":"ref_64","doi-asserted-by":"crossref","unstructured":"Cheng, C., and Lo, C. (2017, January 21\u201323). Multi-Project Scheduling by Fuzzy Combinatorial Auction. Proceedings of the 2017 3rd IEEE International Conference on Cybernetics (CYBCONF), Exeter, UK. Available online: http:\/\/ieeexplore.ieee.org\/document\/7985794\/.","DOI":"10.1109\/CYBConf.2017.7985794"},{"key":"ref_65","first-page":"1447","article-title":"Hybrid constrained flexible city resource scheduling scheme based on particle swarm optimization","volume":"62","author":"Fu","year":"2017","journal-title":"J. Acta Tech."},{"key":"ref_66","doi-asserted-by":"crossref","unstructured":"Li, F., and Xu, Z. (2018). A multi-agent system for distributed multi-project scheduling with two-stage decomposition. PLoS ONE, 13.","DOI":"10.1371\/journal.pone.0205445"},{"key":"ref_67","first-page":"857","article-title":"A lagrangian relaxation algorithm for facility location of resource-constrained decentralized multi-project scheduling problems","volume":"20","author":"Rostami","year":"2020","journal-title":"Oper. Res."},{"key":"ref_68","doi-asserted-by":"crossref","first-page":"104336","DOI":"10.1016\/j.autcon.2022.104336","article-title":"Simultaneous scheduling of multiple construction projects considering supplier selection and material transportation routing","volume":"140","author":"Abdzadeh","year":"2022","journal-title":"Autom. Constr."},{"key":"ref_69","doi-asserted-by":"crossref","first-page":"108240","DOI":"10.1016\/j.cie.2022.108240","article-title":"Multi-project scheduling with multi-skilled workforce assignment considering uncertainty and learning effect for large-scale equipment manufacturer","volume":"169","author":"Chen","year":"2022","journal-title":"Comput. Ind. Eng."},{"key":"ref_70","doi-asserted-by":"crossref","first-page":"117385","DOI":"10.1016\/j.eswa.2022.117385","article-title":"A two-stage approach with softmax scoring mechanism for a multi-project scheduling problem sharing multi-skilled staff","volume":"203","author":"Yu","year":"2022","journal-title":"Expert Syst. Appl."},{"key":"ref_71","first-page":"2245","article-title":"A bi-objective model for scheduling of multiple projects under multi-skilled workforce for distributed load energy usage","volume":"22","author":"Javanmard","year":"2022","journal-title":"Oper. Res."},{"key":"ref_72","doi-asserted-by":"crossref","first-page":"100069","DOI":"10.1016\/j.ejtl.2021.100069","article-title":"A branch-and-price algorithm for the robust single-source capacitated facility location problem under demand uncertainty","volume":"11","author":"Ryu","year":"2022","journal-title":"EURO J. Transp. Logist."},{"key":"ref_73","doi-asserted-by":"crossref","first-page":"108148","DOI":"10.1016\/j.cie.2022.108148","article-title":"An efficient hybrid integer and categorical particle swarm optimization algorithm for the multi-mode multi-project inverse scheduling problem in turbine assembly workshop","volume":"169","author":"Zhang","year":"2022","journal-title":"Comput. Ind. Eng."},{"key":"ref_74","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1155\/2014\/302684","article-title":"A Multiagent Evolutionary Algorithm for the Resource-Constrained Project Portfolio Selection and Scheduling Problem","volume":"2014","author":"Shou","year":"2014","journal-title":"Math. Probl. Eng."},{"key":"ref_75","doi-asserted-by":"crossref","first-page":"632","DOI":"10.1080\/17477778.2022.2041990","article-title":"A GA-simheuristic for the stochastic and multi-period portfolio optimisation problem with liabilities","volume":"17","author":"Nieto","year":"2022","journal-title":"J. Simul."},{"key":"ref_76","doi-asserted-by":"crossref","unstructured":"Ghoroqi, M., Ghoddousi, P., Makui, A., Shirzadi Javid, A.A., and Talebi, S. (2023). An Integrated Model for Multi-Mode Resource-Constrained Multi-Project Scheduling Problems Considering Supply Management with Sustainable Approach in the Construction Industry under Uncertainty Using Evidence Theory and Optimization Algorithms. Buildings, 13.","DOI":"10.3390\/buildings13082023"},{"key":"ref_77","first-page":"820","article-title":"Multi-skill resource-constrained project scheduling problem considering overlapping: Fuzzy multi-objective programming approach to a case study","volume":"24","author":"Zarei","year":"2024","journal-title":"Int. J. Constr. Manag."},{"key":"ref_78","first-page":"2","article-title":"Research of multi-attribute trade-off optimization on critical Chain Multi-project scheduling","volume":"48","author":"Weixin","year":"2013","journal-title":"J. Theor. Appl. Inf. Technol."},{"key":"ref_79","doi-asserted-by":"crossref","unstructured":"Luo, X., Guo, S., Du, B., Luo, X., and Guo, J. (2024). Multi-Objective Multi-Skill Resource-Constrained Project Scheduling Considering Flexible Resource Profiles. Appl. Sci., 14.","DOI":"10.3390\/app14051921"},{"key":"ref_80","doi-asserted-by":"crossref","first-page":"276","DOI":"10.1111\/coin.12260","article-title":"A multiobjective integrated multiproject scheduling and multiskilled workforce assignment model considering learning effect under uncertainty","volume":"36","author":"Hematian","year":"2020","journal-title":"Comput. Intell."},{"key":"ref_81","doi-asserted-by":"crossref","first-page":"6207","DOI":"10.1080\/00207543.2017.1326641","article-title":"A multi-objective model for multi-project scheduling and multi-skilled staff assignment for IT product development considering competency evolution","volume":"55","author":"Chen","year":"2017","journal-title":"Int. J. Prod. Res."},{"key":"ref_82","doi-asserted-by":"crossref","first-page":"108202","DOI":"10.1016\/j.cie.2022.108202","article-title":"A community detection approach for the resource leveling problem in a multi-project scheduling environment","volume":"169","author":"Sayyadi","year":"2022","journal-title":"Comput. Ind. Eng."},{"key":"ref_83","doi-asserted-by":"crossref","first-page":"389","DOI":"10.1007\/s10479-021-04106-z","article-title":"A bi-objective hierarchical program scheduling problem and its solution based on NSGA-III","volume":"308","author":"Peng","year":"2022","journal-title":"Ann. Oper. Res."},{"key":"ref_84","doi-asserted-by":"crossref","first-page":"e6266","DOI":"10.1002\/cpe.6266","article-title":"A graphical processing unit-based parallel hybrid genetic algorithm for resource-constrained multi-project scheduling problem","volume":"33","author":"Uysal","year":"2021","journal-title":"Concurr. Comput. Pract. Exp."},{"key":"ref_85","doi-asserted-by":"crossref","unstructured":"Weixin, W., Xianlong, G., and Jiafu, S. (2019, January 2\u20134). Multi-Project Scheduling with Multi-Factor Disruptions Under Uncertain Environments. Proceedings of the 2019 8th International Conference on Industrial Technology and Management (ICITM), Cambridge, UK. Available online: https:\/\/ieeexplore.ieee.org\/document\/8710663\/.","DOI":"10.1109\/ICITM.2019.8710663"},{"key":"ref_86","doi-asserted-by":"crossref","first-page":"106961","DOI":"10.1016\/j.cie.2020.106961","article-title":"A multi-agent based cooperative approach to decentralized multi-project scheduling and resource allocation","volume":"151","author":"Li","year":"2021","journal-title":"Comput. Ind. Eng."},{"key":"ref_87","doi-asserted-by":"crossref","first-page":"129","DOI":"10.1080\/12460125.1996.10511678","article-title":"Heuristic procedures for resource\u2014Constrained project scheduling with minimal and maximal time lags: The resource\u2014Levelling and minimum project\u2014Duration problems","volume":"5","author":"Brinkmann","year":"1996","journal-title":"J. Decis. Syst."},{"key":"ref_88","doi-asserted-by":"crossref","first-page":"1197","DOI":"10.1287\/mnsc.28.10.1197","article-title":"Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case","volume":"28","author":"Talbot","year":"1982","journal-title":"Manag. Sci."},{"key":"ref_89","unstructured":"Sprecher, A., and Drexl, A. (1996). Solving multi-mode resource-constrained project scheduling problems by a simple general and powerful sequencing algorithm. Part I: Theory. Manuskripte aus den Instituten fur Betriebs Wirtschaftslehre 385, University of Kiel."},{"key":"ref_90","doi-asserted-by":"crossref","first-page":"377","DOI":"10.1016\/0377-2217(95)00158-1","article-title":"A note on \u201cHierarchical models for multi-project planning and scheduling\u201d","volume":"94","author":"Hartmann","year":"1996","journal-title":"Eur. J. Oper. Res. 94"},{"key":"ref_91","doi-asserted-by":"crossref","first-page":"283","DOI":"10.1287\/ijoc.1040.0121","article-title":"A Branch-and-Cut Procedure for the Multimode Resource-Constrained Project-Scheduling Problem","volume":"18","author":"Zhu","year":"2006","journal-title":"Inf. J. Comput."},{"key":"ref_92","first-page":"253","article-title":"A Review of Resource-Constrained Project Scheduling Problems (RCPSP) Approaches and Solutions","volume":"5","author":"Abdolshah","year":"2014","journal-title":"Int. Trans. J. Eng."},{"key":"ref_93","doi-asserted-by":"crossref","first-page":"107402","DOI":"10.1016\/j.asoc.2021.107402","article-title":"A combined multi-agent system for distributed multi-project scheduling problems","volume":"107","author":"Fu","year":"2021","journal-title":"Appl. Soft Comput."},{"key":"ref_94","doi-asserted-by":"crossref","first-page":"106185","DOI":"10.1016\/j.cor.2023.106185","article-title":"Tabu search for proactive project scheduling problem with flexible resources","volume":"153","author":"Ma","year":"2023","journal-title":"Comput. Oper. Res."},{"key":"ref_95","doi-asserted-by":"crossref","first-page":"012007","DOI":"10.1088\/1757-899X\/627\/1\/012007","article-title":"A Robust Optimization Scheduling for Carrier Aircraft Support Operation Based on Critical Chain Method","volume":"627","author":"Yuan","year":"2019","journal-title":"IOP Conf. Ser. Mater. Sci. Eng."},{"key":"ref_96","doi-asserted-by":"crossref","first-page":"107936","DOI":"10.1016\/j.ijpe.2020.107936","article-title":"Solving resource-constrained multi-project environment under different activity assumptions","volume":"232","author":"Patterson","year":"2021","journal-title":"Int. J. Prod. Econ."},{"key":"ref_97","doi-asserted-by":"crossref","first-page":"205","DOI":"10.1016\/S0377-2217(96)00170-1","article-title":"PSPLIB\u2014A project scheduling problem library","volume":"96","author":"Kolisch","year":"1997","journal-title":"Eur. J. Oper. Res."},{"key":"ref_98","doi-asserted-by":"crossref","first-page":"565","DOI":"10.1111\/j.1475-3995.2007.00614.x","article-title":"A multi-agent system for the decentralized resource-constrained multi-project scheduling problem","volume":"14","author":"Homberger","year":"2007","journal-title":"Int. Trans. Oper. Res."},{"key":"ref_99","doi-asserted-by":"crossref","first-page":"107","DOI":"10.1007\/s00291-009-0178-3","article-title":"A (\u03bc, \u03bb)-coordination mechanism for agent-based multi-project scheduling","volume":"34","author":"Homberger","year":"2012","journal-title":"OR Spectr."},{"key":"ref_100","doi-asserted-by":"crossref","first-page":"289","DOI":"10.1016\/j.ejor.2004.04.002","article-title":"Project scheduling under uncertainty: Survey and research potentials","volume":"165","author":"Herroelen","year":"2005","journal-title":"Eur. J. Oper. Res."},{"key":"ref_101","first-page":"117","article-title":"A survey in the resource-constrained project and multi-project scheduling problems","volume":"5","author":"Tu","year":"2020","journal-title":"J. Proj. Manag."}],"container-title":["Algorithms"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/www.mdpi.com\/1999-4893\/18\/6\/314\/pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,10,9]],"date-time":"2025-10-09T17:40:46Z","timestamp":1760031646000},"score":1,"resource":{"primary":{"URL":"https:\/\/www.mdpi.com\/1999-4893\/18\/6\/314"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2025,5,26]]},"references-count":101,"journal-issue":{"issue":"6","published-online":{"date-parts":[[2025,6]]}},"alternative-id":["a18060314"],"URL":"https:\/\/doi.org\/10.3390\/a18060314","relation":{},"ISSN":["1999-4893"],"issn-type":[{"value":"1999-4893","type":"electronic"}],"subject":[],"published":{"date-parts":[[2025,5,26]]}}}