{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,1,28]],"date-time":"2026-01-28T06:48:05Z","timestamp":1769582885134,"version":"3.49.0"},"reference-count":35,"publisher":"MDPI AG","issue":"5","license":[{"start":{"date-parts":[[2022,5,12]],"date-time":"2022-05-12T00:00:00Z","timestamp":1652313600000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by\/4.0\/"}],"funder":[{"name":"Funda\u00e7\u00e3o para a Ci\u00eancia e a Tecnologia","award":["2020.09705.BD"],"award-info":[{"award-number":["2020.09705.BD"]}]}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Buildings"],"abstract":"<jats:p>Building information modelling (BIM) has demonstrated its potential as a solution providing support to a series of operations related to facility management (FM) through building data retrieval, analysis, and processing. However, some challenges to the effective adoption of BIM-centred FM information systems occur in their design and implementation, causing obstacles to usability. Among these challenges are the customization of the information structure for each application case, the dynamic character of data supporting building maintenance, and the range of FM specialities involved, frequently including persons who are not BIM experts. This paper presents a BIM\u2013FM prototype to support operations and access updated environmental data for a university building. The two contributions of the developed prototype are its ability to register two types of dynamic data, namely, the regularly acquired environmental sensor information and the sporadic building intervention records, and the automation of the data feeding, updating, and retrieval processes, allowing a user-friendly environment for both BIM experts and non-BIM users. Exploring the BIM interoperability and the integration of plug-ins, the proposed solution enables the comprehensive registration of dynamic FM-related data in an updated model while being accessible to all the specialities involved in the building management operations, enhancing its usability as an integrated solution for data maintenance and retrieval.<\/jats:p>","DOI":"10.3390\/buildings12050645","type":"journal-article","created":{"date-parts":[[2022,5,12]],"date-time":"2022-05-12T05:10:32Z","timestamp":1652332232000},"page":"645","update-policy":"https:\/\/doi.org\/10.3390\/mdpi_crossmark_policy","source":"Crossref","is-referenced-by-count":26,"title":["Dynamic Data Feeding into BIM for Facility Management: A Prototype Application to a University Building"],"prefix":"10.3390","volume":"12","author":[{"given":"Jonatan Villavicencio","family":"Moreno","sequence":"first","affiliation":[{"name":"Instituto Superior T\u00e9cnico, Universidade de Lisboa, Av. Rovisco Pais, 1049-001 Lisboa, Portugal"}]},{"ORCID":"https:\/\/orcid.org\/0000-0003-3106-9337","authenticated-orcid":false,"given":"Rita","family":"Machete","sequence":"additional","affiliation":[{"name":"CERIS, Instituto Superior T\u00e9cnico, Universidade de Lisboa, Av. Rovisco Pais, 1049-001 Lisboa, Portugal"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-3626-7634","authenticated-orcid":false,"given":"Ana Paula","family":"Falc\u00e3o","sequence":"additional","affiliation":[{"name":"CERIS, Instituto Superior T\u00e9cnico, Universidade de Lisboa, Av. Rovisco Pais, 1049-001 Lisboa, Portugal"}]},{"ORCID":"https:\/\/orcid.org\/0000-0001-7273-1230","authenticated-orcid":false,"given":"Alexandre B.","family":"Gon\u00e7alves","sequence":"additional","affiliation":[{"name":"CERIS, Instituto Superior T\u00e9cnico, Universidade de Lisboa, Av. Rovisco Pais, 1049-001 Lisboa, Portugal"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-6503-0644","authenticated-orcid":false,"given":"Rita","family":"Bento","sequence":"additional","affiliation":[{"name":"CERIS, Instituto Superior T\u00e9cnico, Universidade de Lisboa, Av. Rovisco Pais, 1049-001 Lisboa, Portugal"}]}],"member":"1968","published-online":{"date-parts":[[2022,5,12]]},"reference":[{"key":"ref_1","doi-asserted-by":"crossref","first-page":"106568","DOI":"10.1016\/j.buildenv.2019.106568","article-title":"BIM-based life cycle assessment and life cycle costing of an office building in Western Europe","volume":"169","author":"Santos","year":"2020","journal-title":"Build. Environ."},{"key":"ref_2","doi-asserted-by":"crossref","first-page":"242","DOI":"10.1016\/j.jobe.2018.04.028","article-title":"Beyond the third dimension of BIM: A systematic review of literature and assessment of professional views","volume":"19","author":"Charef","year":"2018","journal-title":"J. Build. Eng."},{"key":"ref_3","doi-asserted-by":"crossref","first-page":"431","DOI":"10.1061\/(ASCE)CO.1943-7862.0000433","article-title":"Application areas and data requirements for BIM-enabled facilities management","volume":"138","author":"Jazizadeh","year":"2012","journal-title":"J. Constr. Eng. Manag."},{"key":"ref_4","doi-asserted-by":"crossref","first-page":"455","DOI":"10.1108\/F-03-2018-0043","article-title":"Integration of facility management and building information modeling (BIM): A review of key issues and challenges","volume":"37","author":"Dixit","year":"2019","journal-title":"Facilities"},{"key":"ref_5","doi-asserted-by":"crossref","first-page":"94","DOI":"10.1016\/j.culher.2021.02.010","article-title":"Information transfer between two heritage BIMs for reconstruction support and facility management: The case study of the Chalet of the Countess of Edla, Sintra, Portugal","volume":"49","author":"Machete","year":"2021","journal-title":"J. Cult. Herit."},{"key":"ref_6","doi-asserted-by":"crossref","first-page":"103736","DOI":"10.1016\/j.jobe.2021.103736","article-title":"Barriers to the implementation of Building Information Modelling (BIM) for facility management","volume":"46","author":"Durdyev","year":"2022","journal-title":"J. Build. Eng."},{"key":"ref_7","doi-asserted-by":"crossref","first-page":"103115","DOI":"10.1016\/j.autcon.2020.103115","article-title":"BIM-integrated management of occupational hazards in building construction and maintenance","volume":"113","year":"2020","journal-title":"Autom. Constr."},{"key":"ref_8","unstructured":"Chen, W.W., Chen, K.Y., and Cheng, J.C.P. (2017, January 20\u201323). BIM- and IoT-based framework for building energy consumption and indoor human comfort management. Proceedings of the 22nd International Conference on Advancement of Construction Management and Real Estate, CRIOCM 2017, Melbourne, Australia."},{"key":"ref_9","doi-asserted-by":"crossref","unstructured":"Mataloto, B., Ferreira, J.C., Resende, R., Moura, M., and Lu\u00eds, S. (2020). BIM in People2People and Things2People interactive process. Sensors, 20.","DOI":"10.3390\/s20102982"},{"key":"ref_10","doi-asserted-by":"crossref","unstructured":"Mataloto, B., Mendes, H., and Ferreira, J.C. (2020). Things2People Interaction toward Energy Savings in Shared Spaces Using BIM. Appl. Sci., 10.","DOI":"10.3390\/app10165709"},{"key":"ref_11","doi-asserted-by":"crossref","unstructured":"Mobaraki, B., Lozano-Galant, F., Soriano, R.P., and Castilla Pascual, F.J. (2021). Application of Low-Cost Sensors for Building Monitoring: A Systematic Literature Review. Buildings, 11.","DOI":"10.3390\/buildings11080336"},{"key":"ref_12","doi-asserted-by":"crossref","unstructured":"Lombardo, L., Corbellini, S., Elsayed, A., Angelini, E., Parvis, M., and Grassini, S. (2017, January 27\u201329). Sensor network for museum environmental monitoring. Proceedings of the 2017 IEEE International Workshop on Measurement and Networking (M&N), Naples, Italy.","DOI":"10.1109\/IWMN.2017.8078394"},{"key":"ref_13","doi-asserted-by":"crossref","unstructured":"Klein, L., Bermudez, S., Schrott, A., Tsukada, M., Dionisi-Vici, P., Kargere, L., Marianno, F., Hamann, H., L\u00f3pez, V., and Leona, M. (2017). Wireless Sensor Platform for Cultural Heritage Monitoring and Modeling System. Sensors, 17.","DOI":"10.3390\/s17091998"},{"key":"ref_14","doi-asserted-by":"crossref","first-page":"176","DOI":"10.1108\/IJBPA-01-2019-0012","article-title":"Assessing building performance in residential buildings using BIM and sensor data","volume":"38","author":"Rogage","year":"2020","journal-title":"Int. J. Build. Pathol. Adapt."},{"key":"ref_15","doi-asserted-by":"crossref","first-page":"177","DOI":"10.1016\/j.apacoust.2010.11.006","article-title":"Low frequency impact sound transmission in dwellings through homogeneous concrete floors and floating floors","volume":"72","author":"Gibbs","year":"2011","journal-title":"Appl. Acoust."},{"key":"ref_16","doi-asserted-by":"crossref","first-page":"46","DOI":"10.1016\/j.enbuild.2016.07.026","article-title":"Estimating occupancy in heterogeneous sensor environment","volume":"129","author":"Amayri","year":"2016","journal-title":"Energy Build."},{"key":"ref_17","doi-asserted-by":"crossref","first-page":"260","DOI":"10.1016\/j.enbuild.2018.03.084","article-title":"Building occupancy estimation and detection: A review","volume":"169","author":"Chen","year":"2018","journal-title":"Energy Build."},{"key":"ref_18","doi-asserted-by":"crossref","first-page":"128","DOI":"10.1016\/j.autcon.2016.05.005","article-title":"Conditional Random Fields-based approach for real-time building occupancy estimation with multi-sensory networks","volume":"68","author":"Zikos","year":"2016","journal-title":"Autom. Constr."},{"key":"ref_19","doi-asserted-by":"crossref","first-page":"757","DOI":"10.1080\/15583058.2019.1648587","article-title":"A Multi-Disciplinary Approach to the Seismic Assessment of the National Palace of Sintra","volume":"15","author":"Ponte","year":"2019","journal-title":"Int. J. Archit. Herit."},{"key":"ref_20","doi-asserted-by":"crossref","unstructured":"Valinejadshoubi, M., Moselhi, O., and Bagchi, A. (2021). Integrating BIM into sensor-based facilities management operations. J. Facil. Manag.","DOI":"10.1108\/JFM-08-2020-0055"},{"key":"ref_21","doi-asserted-by":"crossref","first-page":"127","DOI":"10.1016\/j.autcon.2019.01.020","article-title":"A review of building information modeling (BIM) and the internet of things (IoT) devices integration: Present status and future trends","volume":"101","author":"Tang","year":"2019","journal-title":"Autom. Constr."},{"key":"ref_22","doi-asserted-by":"crossref","first-page":"103170","DOI":"10.1016\/j.autcon.2020.103179","article-title":"Towards a semantic Construction Digital Twin: Directions for future research","volume":"114","author":"Boje","year":"2020","journal-title":"Autom. Constr."},{"key":"ref_23","doi-asserted-by":"crossref","unstructured":"Altohami, A.B.A., Haron, N.A., Alias, A.H., and Law, T.H. (2021). Investigating Approaches of Integrating BIM, IoT, and Facility Management for Renovating Existing Buildings: A Review. Sustainability, 13.","DOI":"10.3390\/su13073930"},{"key":"ref_24","doi-asserted-by":"crossref","unstructured":"Laurini, E., Rotilio, M., Lucarelli, M., and De Berardinis, P. (2019, January 8\u201310). Technology 4.0 for Buildings Management: From Building Site to the Interactive Building Book. The International Archives of the Photogrammetry, Remote Sensing and Spatial Information Sciences, XLII-2\/W11. Proceedings of the 2nd International Conference of Geomatics and Restoration, Milan, Italy.","DOI":"10.5194\/isprs-archives-XLII-2-W11-707-2019"},{"key":"ref_25","doi-asserted-by":"crossref","unstructured":"Desogus, G., Quaquero, E., Rubiu, G., Gatto, G., and Perra, C. (2021). BIM and IoT Sensors Integration: A Framework for Consumption and Indoor Conditions Data Monitoring of Existing Buildings. Sustainability, 13.","DOI":"10.3390\/su13084496"},{"key":"ref_26","doi-asserted-by":"crossref","unstructured":"Scianna, A., Gaglio, G.F., and La Guardia, M. (2022). Structure Monitoring with BIM and IoT: The Case Study of a Bridge Beam Model. ISPRS Int. J. Geo-Inf., 11.","DOI":"10.3390\/ijgi11030173"},{"key":"ref_27","doi-asserted-by":"crossref","first-page":"1","DOI":"10.2495\/SDP-V13-N1-1-11","article-title":"Building information modelling in operations of maintenance at the University of Alicante","volume":"13","year":"2018","journal-title":"Int. J. Sustain. Dev. Plan."},{"key":"ref_28","doi-asserted-by":"crossref","first-page":"261","DOI":"10.1108\/BEPAM-02-2014-0011","article-title":"BIM in facilities management applications: A case study of a large university complex","volume":"5","author":"Kassem","year":"2015","journal-title":"Built Environ. Proj. Asset Manag."},{"key":"ref_29","doi-asserted-by":"crossref","unstructured":"Su, Y., Lee, Y., and Lin, Y. (July, January 29). Enhancing Maintenance Management Using Building Information Modeling in Facilities Management. Proceedings of the 28th International Symposium on Automation and Robotics in Construction (ISARC 2011), Seoul, Korea.","DOI":"10.22260\/ISARC2011\/0140"},{"key":"ref_30","doi-asserted-by":"crossref","unstructured":"Mu\u00f1oz Pav\u00f3n, R., Arcos Alvarez, A.A., and Alberti, M.G. (2020). BIM-Based Educational and Facility Management of Large University Venues. Appl. Sci., 10.","DOI":"10.3390\/app10227976"},{"key":"ref_31","doi-asserted-by":"crossref","unstructured":"Muhamad, W., Kurniawan, N.B., and Yazid, S. (2017, January 23\u201324). Smart campus features, technologies, and applications: A systematic literature review. Proceedings of the 2017 International Conference on Information Technology Systems and Innovation (ICITSI), Bandung, Indonesia.","DOI":"10.1109\/ICITSI.2017.8267975"},{"key":"ref_32","doi-asserted-by":"crossref","unstructured":"Villa, V., Naticchia, B., Bruno, G., Aliev, K., Piantanida, P., and Antonelli, D. (2021). IoT Open-Source Architecture for the Maintenance of Building Facilities. Appl. Sci., 11.","DOI":"10.3390\/app11125374"},{"key":"ref_33","doi-asserted-by":"crossref","first-page":"1104","DOI":"10.1016\/j.proeng.2015.08.450","article-title":"A Building Information Management (BIM) Framework and Supporting Case Study for Existing Building Operations, Maintenance and Sustainability","volume":"118","author":"McArthur","year":"2015","journal-title":"Procedia Eng."},{"key":"ref_34","unstructured":"DiRoots (n\/d) (2021, December 01). Revit to Excel and Google Sheets. Available online: https:\/\/diroots.com\/revit-plugins\/revit-to-excel-sheetlink\/."},{"key":"ref_35","unstructured":"PG Apps (n\/d) (2021, December 03). Tracer for Revit | 3D Building Information Models for Power BI. Available online: https:\/\/apps.provingground.io\/tracer\/."}],"container-title":["Buildings"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/www.mdpi.com\/2075-5309\/12\/5\/645\/pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,10,10]],"date-time":"2025-10-10T23:09:41Z","timestamp":1760137781000},"score":1,"resource":{"primary":{"URL":"https:\/\/www.mdpi.com\/2075-5309\/12\/5\/645"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2022,5,12]]},"references-count":35,"journal-issue":{"issue":"5","published-online":{"date-parts":[[2022,5]]}},"alternative-id":["buildings12050645"],"URL":"https:\/\/doi.org\/10.3390\/buildings12050645","relation":{},"ISSN":["2075-5309"],"issn-type":[{"value":"2075-5309","type":"electronic"}],"subject":[],"published":{"date-parts":[[2022,5,12]]}}}