{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,2,12]],"date-time":"2026-02-12T10:24:22Z","timestamp":1770891862204,"version":"3.50.1"},"reference-count":85,"publisher":"MDPI AG","issue":"2","license":[{"start":{"date-parts":[[2023,2,17]],"date-time":"2023-02-17T00:00:00Z","timestamp":1676592000000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by\/4.0\/"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Buildings"],"abstract":"<jats:p>Project Management Maturity Models (PMMM) are considered practical tools to deal with poor Project Management (PM) performance, an issue that concerns academics and practitioners. However, the models that exist are something close to \u201cone size fits all\u201d. This means that those models might not be suitable for activity sectors with specific requirements, such as construction, in particular, the renovation and remodelling construction firms. The present research proposes a PMMM to assess the PM capabilities of Portuguese renovation and remodelling Project-Based Firms (PBF). To achieve this goal, the authors developed documental research, followed by exploratory research through qualitative analysis. The researchers conducted semi-structured interviews and performed a content analysis of the fully transcribed interviews. Compared with the literature review\u2019s findings, qualitative analysis results made it possible to find closure on previous research that indicated two models to have the best fit for an assessment project on construction PBFs: the OPM3 from the PMI and the MMGP-Prado. Based on those findings, the latter has the best fit for an assessment project on construction PBF. However, the model needs adjustments to fit the Portuguese context of renovation and remodelling organisations. This article presents a new PMMM for Portuguese renovation and remodelling construction firms based on obtained results. Furthermore, regarding construction PM, this article is among the few that studied PMMM on renovation and remodelling construction companies. Unlike large construction companies, these are small organisations that academics do not target for research.<\/jats:p>","DOI":"10.3390\/buildings13020557","type":"journal-article","created":{"date-parts":[[2023,2,20]],"date-time":"2023-02-20T04:58:23Z","timestamp":1676869103000},"page":"557","update-policy":"https:\/\/doi.org\/10.3390\/mdpi_crossmark_policy","source":"Crossref","is-referenced-by-count":6,"title":["Project Management Maturity in Renovation and Remodelling Construction Firms"],"prefix":"10.3390","volume":"13","author":[{"ORCID":"https:\/\/orcid.org\/0000-0002-0571-9925","authenticated-orcid":false,"given":"Filipe","family":"Machado","sequence":"first","affiliation":[{"name":"School of Engineering, Department of Production and Systems, Campus de Azur\u00e9m, Universidade do Minho, 4800-058 Guimar\u00e3es, Portugal"},{"name":"ALGORITMI Research Centre, Universidade do Minho, 4800-058 Braga, Portugal"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-4156-7922","authenticated-orcid":false,"given":"Nelson","family":"Duarte","sequence":"additional","affiliation":[{"name":"ESTG-P.PORTO, Department of Business Sciences, Rua do Curral, 4610-156 Margaride, Portugal"},{"name":"International Research Institute for Economics and Management, Hong Kong, China"},{"name":"INESC TEC\u2014Institute for Systems and Computer Engineering, Technology and Science, 4200-465 Porto, Portugal"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-7910-2418","authenticated-orcid":false,"given":"Ant\u00f3nio","family":"Amaral","sequence":"additional","affiliation":[{"name":"ALGORITMI Research Centre, Universidade do Minho, 4800-058 Braga, Portugal"},{"name":"INESC TEC\u2014Institute for Systems and Computer Engineering, Technology and Science, 4200-465 Porto, Portugal"},{"name":"ISEP-P.PORTO, Department of Mechanical Engineering, Rua Dr. Ant\u00f3nio Bernardino de Almeida, 431, 4249-015 Porto, Portugal"}]}],"member":"1968","published-online":{"date-parts":[[2023,2,17]]},"reference":[{"key":"ref_1","doi-asserted-by":"crossref","first-page":"105","DOI":"10.1002\/pmj.20079","article-title":"Developing an Effective Project: Planning and Team Building Combined","volume":"39","author":"Thomas","year":"2008","journal-title":"Proj. Manag. J."},{"key":"ref_2","doi-asserted-by":"crossref","first-page":"485","DOI":"10.1016\/j.ijproman.2018.12.002","article-title":"How Do Project Management Competencies Change within the Project Management Career Model in Large Chinese Construction Companies?","volume":"37","author":"Chen","year":"2019","journal-title":"Int. J. Proj. Manag."},{"key":"ref_3","doi-asserted-by":"crossref","first-page":"471","DOI":"10.1016\/S0263-7863(02)00084-4","article-title":"The Maturity of Project Management in Different Industries: An Investigation into Varia-tions between Project Management Models","volume":"21","author":"Arzymanow","year":"2003","journal-title":"Int. J. Proj. Manag."},{"key":"ref_4","first-page":"1","article-title":"Project Management Maturity and Project Management Success in the Engineering and Construction Industries in Southern Africa","volume":"23","author":"Pretorius","year":"2012","journal-title":"S. Afr. J. Ind. Eng."},{"key":"ref_5","unstructured":"Archibald, R., and Prado, D. (2022, November 02). Conceitua\u00e7\u00e3o Para o Sucesso. Available online: https:\/\/silo.tips\/download\/mpcm-prado-archibald-maturidade-brasil-2010-2."},{"key":"ref_6","doi-asserted-by":"crossref","first-page":"59","DOI":"10.1109\/TEM.2005.861802","article-title":"Project management maturity: An assessment of project management capabilities among and between selected industries","volume":"53","author":"Grant","year":"2006","journal-title":"IEEE Trans. Eng. Manag."},{"key":"ref_7","unstructured":"Prado, D. (2008). Maturidade Em Gerenciamento De Projetos, Falconi Editora. [2nd ed.]."},{"key":"ref_8","unstructured":"Prado, D. (2015). Maturidade Em Gerenciamento De Projetos, Falconi Editora. [3rd ed.]."},{"key":"ref_9","first-page":"49","article-title":"An\u00e1lise Da Maturidade Em Gest\u00e3o de Projetos de Uma Empresa Da Constru\u00e7\u00e3o Civil Utilizando a Metodologia MMGP","volume":"3","author":"Santos","year":"2019","journal-title":"Interfaces Cient\u00edficas"},{"key":"ref_10","doi-asserted-by":"crossref","unstructured":"Machado, F., Duarte, N., Amaral, A., and Barros, T. (2021). Project Management Maturity Models for Construction Firms. J. Risk Financ. Manag., 14.","DOI":"10.3390\/jrfm14120571"},{"key":"ref_11","doi-asserted-by":"crossref","first-page":"100836","DOI":"10.1016\/j.jobe.2019.100836","article-title":"On the concept of sustainable sustainability: An application to the Portuguese construction sector","volume":"25","author":"Cruz","year":"2019","journal-title":"J. Build. Eng."},{"key":"ref_12","unstructured":"AICCOPN (2020). Conjuntura Da Constru\u00e7\u00e3o\u2014Informa\u00e7\u00e3o R\u00e1pida\u2014Julho\/2020, AICCOPN."},{"key":"ref_13","unstructured":"AICCOPN (2022). Conjuntura Da Cpnstru\u00e7\u00e3o\u2014Informa\u00e7\u00e3o R\u00e1pida\u2014Abril\/2022, AICCOPN."},{"key":"ref_14","unstructured":"AICCOPN (2022). Bar\u00f3metro Da Reabilita\u00e7\u00e3o Urbana No. 103\u2014Julho\/2022, AICCOPN."},{"key":"ref_15","doi-asserted-by":"crossref","first-page":"157","DOI":"10.1080\/01446193.2022.2045717","article-title":"Sustainable building renovation\u2014Strategies and processes","volume":"40","author":"Jensen","year":"2022","journal-title":"Constr. Manag. Econ."},{"key":"ref_16","unstructured":"Bardin, L. (1977). An\u00e1lise de Conte\u00fado; Edi\u00e7\u00f5es 70, LDA."},{"key":"ref_17","doi-asserted-by":"crossref","first-page":"837","DOI":"10.1016\/j.sbspro.2014.03.094","article-title":"Project Management Maturity Models\u2014A Critical Review","volume":"119","author":"Backlund","year":"2014","journal-title":"Procedia Soc. Behav. Sci."},{"key":"ref_18","first-page":"56","article-title":"Application of Organizational Project Management Maturity Model (OPM3) to Construction in China: An Empirical Study","volume":"2","author":"Guangshe","year":"2008","journal-title":"Int. Conf. Inf. Manag. Innov. Manag. Ind. Eng."},{"key":"ref_19","unstructured":"Sarshar, M., Finnemore, M., Haigh, R., and Goulding, J. SPICE: Is a Capability Maturity Model Applicable in the Construction Industry?. Proceedings of the CIB W078 Workshop on Information Technology in Construction."},{"key":"ref_20","doi-asserted-by":"crossref","unstructured":"Neto, A., Santos Jr, B., Ara\u00fajo Filho, A., Souza, A., and Serpa, F. (2019). Avalia\u00e7\u00e3o Do Grau De Maturidade Em Gerenciamento De Projetos No Setor De Planejamento Da Empresa Mf Tecnologia Predial. Eng. Produ\u00e7\u00e3o Vetor Transform. Bras., 119\u2013132.","DOI":"10.22533\/at.ed.1191904099"},{"key":"ref_21","first-page":"71","article-title":"Proposta de Melhoria Do Desempenho Por Meio Da Maturidade Em Gerenciamento de Projetos","volume":"8","author":"Dragoni","year":"2020","journal-title":"Rev. Inova\u00e7\u00e3o Proj. Tecnol."},{"key":"ref_22","doi-asserted-by":"crossref","first-page":"1652","DOI":"10.1016\/j.ijproman.2015.05.004","article-title":"Evolution of project based organization: A case study","volume":"33","author":"Kwak","year":"2015","journal-title":"Int. J. Proj. Manag."},{"key":"ref_23","doi-asserted-by":"crossref","unstructured":"Guest, G., Namey, E., and Chen, M. (2020). A simple method to assess and report thematic saturation in qualitative research. PLoS ONE, 15.","DOI":"10.1371\/journal.pone.0232076"},{"key":"ref_24","doi-asserted-by":"crossref","first-page":"796","DOI":"10.1016\/j.ijproman.2010.05.005","article-title":"Getting control of multi-project organizations: Combining contingent control mechanisms","volume":"28","author":"Canonico","year":"2010","journal-title":"Int. J. Proj. Manag."},{"key":"ref_25","doi-asserted-by":"crossref","first-page":"3","DOI":"10.1023\/B:MAGO.0000015392.75507.ad","article-title":"Governing Project-based Firms: Promoting Market-like Processes within Hierarchies","volume":"8","author":"Lindkvist","year":"2004","journal-title":"J. Manag. Gov."},{"key":"ref_26","unstructured":"Turner, R. (2007). Handbook of Project Management, Gower."},{"key":"ref_27","doi-asserted-by":"crossref","first-page":"479","DOI":"10.1016\/j.ijproman.2016.12.007","article-title":"Towards a design for the project-based organization","volume":"35","author":"Miterev","year":"2017","journal-title":"Int. J. Proj. Manag."},{"key":"ref_28","unstructured":"Gareis, R., and Huemann, M. (2000). Project Management Competences in the Project-Oriented Organisation, Project Management Institute."},{"key":"ref_29","doi-asserted-by":"crossref","first-page":"77","DOI":"10.1093\/icc\/dtj003","article-title":"Project-Based Firms: New Organisational Form or Variations on a Theme?","volume":"15","author":"Whitley","year":"2006","journal-title":"Ind. Corp. Chang."},{"key":"ref_30","first-page":"6","article-title":"A Global System for Categorizing Projects","volume":"Volume XXXV","author":"Archibald","year":"2013","journal-title":"Proceedings of the IPMA Project Perspectives 2013\u2014The annual publication of International Project Management Association"},{"key":"ref_31","doi-asserted-by":"crossref","unstructured":"S\u00f6derlund, J. (2014). Project-Based Organizations: What Are They?, Newgen.","DOI":"10.1093\/acprof:oso\/9780199861378.003.0004"},{"key":"ref_32","doi-asserted-by":"crossref","first-page":"315","DOI":"10.1080\/01446190701874413","article-title":"Is construction different? A comparison of perceptions of project management performance and practices by business sector and project type","volume":"26","author":"Bryde","year":"2008","journal-title":"Constr. Manag. Econ."},{"key":"ref_33","doi-asserted-by":"crossref","first-page":"1207","DOI":"10.1108\/JKM-03-2021-0180","article-title":"Assessment of knowledge process capabilities toward project management maturity: An empirical study","volume":"26","author":"Alghail","year":"2021","journal-title":"J. Knowl. Manag."},{"key":"ref_34","doi-asserted-by":"crossref","first-page":"489","DOI":"10.1108\/JKM-03-2018-0199","article-title":"The relationship between organizational commitment, knowledge transfer and knowledge management maturity","volume":"23","author":"Marques","year":"2019","journal-title":"J. Knowl. Manag."},{"key":"ref_35","doi-asserted-by":"crossref","first-page":"70","DOI":"10.1061\/(ASCE)0742-597X(2004)20:2(70)","article-title":"Role of Error-Recovery Process in Projects","volume":"20","author":"Love","year":"2004","journal-title":"J. Manag. Eng."},{"key":"ref_36","doi-asserted-by":"crossref","first-page":"272","DOI":"10.1108\/09696470310486629","article-title":"From continuous improvement to organisational learning: Developmental theory","volume":"10","author":"Murray","year":"2003","journal-title":"Learn. Organ."},{"key":"ref_37","doi-asserted-by":"crossref","first-page":"337","DOI":"10.1016\/S0263-7863(98)00069-6","article-title":"Project management: Cost, time and quality, two best guesses and a phenomenon, its time to accept other success criteria","volume":"17","author":"Atkinson","year":"1999","journal-title":"Int. J. Proj. Manag."},{"key":"ref_38","doi-asserted-by":"crossref","unstructured":"Turner, R., and Zolan, R. (2012). Forecasting Success on Large Projects: Developing Reliable Scales to Predict Multiple Perspectives by Multiple Stakeholders over Multiple Time Frames. Proj. Manag. J., 55.","DOI":"10.1002\/pmj.21289"},{"key":"ref_39","doi-asserted-by":"crossref","first-page":"527","DOI":"10.1108\/IJMPB-09-2017-0107","article-title":"What is the Iron Triangle, and how has it changed?","volume":"11","author":"Pollack","year":"2018","journal-title":"Int. J. Manag. Proj. Bus."},{"key":"ref_40","doi-asserted-by":"crossref","first-page":"1836","DOI":"10.1016\/j.ijproman.2015.07.009","article-title":"Relationship quality and satisfaction: Customer-perceived success factors for on-time projects","volume":"33","author":"Williams","year":"2015","journal-title":"Int. J. Proj. Manag."},{"key":"ref_41","doi-asserted-by":"crossref","first-page":"30","DOI":"10.1002\/pmj.21468","article-title":"The Relationship between Project Success and Project Efficiency","volume":"46","author":"Serrador","year":"2015","journal-title":"Proj. Manag. J."},{"key":"ref_42","unstructured":"Ram, J. (2019). Quartet of Project Core: Agility, Scope, Time and Cost, IMPA."},{"key":"ref_43","unstructured":"PMBOK\u00ae Guide (2017). Guide to the Project Management Body of Knowledge, Project Management Institute. [6th ed.]."},{"key":"ref_44","doi-asserted-by":"crossref","first-page":"185","DOI":"10.1016\/S0263-7863(01)00067-9","article-title":"The \u201cReal\u201d Success Factors on Projects","volume":"20","year":"2002","journal-title":"Int. J. Proj. Manag."},{"key":"ref_45","first-page":"5","article-title":"Mapping the Dimensions of Project Success","volume":"28","author":"Shenhar","year":"1997","journal-title":"Proj. Manag. J. PMI"},{"key":"ref_46","unstructured":"Shenhar, A., and Dvir, D. (2007). Harvard Business Press."},{"key":"ref_47","unstructured":"Ibbs, C.W., Reginato, J.M., and Kwak, Y.H. (2004). The Wiley Guide to Managing Projects, Wiley."},{"key":"ref_48","doi-asserted-by":"crossref","unstructured":"Kerzner, H. (2019). Using the Project Management Maturity Model: Strategic Planning for Project Management, John Wiley & Sons, Inc.. [3rd ed.].","DOI":"10.1002\/9781119559078"},{"key":"ref_49","unstructured":"Sonnekus, R., and Labuschagne, L. (2004, January 10\u201312). Establishing the Relationship between IT Project Management Maturity and IT Project Success in a South African Context. Proceedings of the PMSA Global Knowledge Conference, Johannesburg, South Africa."},{"key":"ref_50","first-page":"671","article-title":"An Assessment of Software Project Management Maturity in Mauritius","volume":"2","author":"Sukhoo","year":"2005","journal-title":"Issues Inf. Sci. Inf. Technol."},{"key":"ref_51","first-page":"3","article-title":"What is Project Success: A Literature Review","volume":"3","author":"Prabhakar","year":"2009","journal-title":"Int. J. Bus. Manag."},{"key":"ref_52","doi-asserted-by":"crossref","first-page":"17","DOI":"10.1002\/pmj.21291","article-title":"Contextualized Project Management Practice: A Cluster Analysis of Practices and Best Practices","volume":"44","author":"Bresner","year":"2013","journal-title":"Proj. Manag. J."},{"key":"ref_53","unstructured":"Grobler, P., and Steyn, H. (June, January 30). Project Management Maturity Models: Does One Size Fit All. Proceedings of the 2006 PMSA International Conference, Johannesburg, South Africa."},{"key":"ref_54","doi-asserted-by":"crossref","first-page":"256","DOI":"10.1108\/IJMPB-05-2014-0047","article-title":"Maturity assessment: Towards continuous improvements for project-based organisations?","volume":"8","author":"Backlund","year":"2015","journal-title":"Int. J. Manag. Proj. Bus."},{"key":"ref_55","doi-asserted-by":"crossref","first-page":"162","DOI":"10.1016\/j.sbspro.2014.03.020","article-title":"Project Complexity as an Influence Factor on the Balance of Costs and Benefits in Project Management Maturity Modeling","volume":"119","author":"Christoph","year":"2014","journal-title":"Procedia Soc. Behav. Sci."},{"key":"ref_56","unstructured":"Mullaly, M.E., and Thomas, J. (2010). Proceedings of the PMI\u00ae Research Conference: Defining the Future of Project Management, Project Management Institute."},{"key":"ref_57","unstructured":"Prado, D. (2022, November 02). A Import\u00e2ncia Da Evolu\u00e7\u00e3o Da Maturidade Em Gerenciamento de Projetos. Available online: https:\/\/docplayer.com.br\/8022793-A-importancia-da-evolucao-da-maturidade-em-gerenciamento-de-projetos.html."},{"key":"ref_58","unstructured":"Prado, D., Archibald, R., and Oliveira, W. (2022, November 02). O Valor Da Evolu\u00e7\u00e3o Da Maturidade Em Gerenciamento de Projetos. Available online: https:\/\/docplayer.com.br\/13560039-O-valor-da-evolucao-da-maturidade-em-gerenciamento-de-projetos.html."},{"key":"ref_59","doi-asserted-by":"crossref","first-page":"793","DOI":"10.1108\/IJMPB-08-2019-0207","article-title":"An exploratory analysis of the project management and corporate sustainability capabilities for organizational success","volume":"13","author":"Yazici","year":"2020","journal-title":"Int. J. Manag. Proj. Bus."},{"key":"ref_60","doi-asserted-by":"crossref","first-page":"4","DOI":"10.1177\/875697280203300402","article-title":"Project Management Maturity Models: The Silver Bullets of Competitive Advantage?","volume":"33","author":"Jugdev","year":"2002","journal-title":"Proj. Manag. J."},{"key":"ref_61","unstructured":"Labuschagne, L., Marnewick, C., and Jakovljevic, M. (2022, November 02). IT Project Management Maturity: A South African Perspective. PMSA Conf. 2008 From Strateg. to Real. Available online: https:\/\/remotevoicetechnologies.com\/publications\/Publications_2000_to_2010\/24_PMSA_2008_Labuschagne_Marnewick_Jakovljevic.pdf."},{"key":"ref_62","doi-asserted-by":"crossref","first-page":"62","DOI":"10.1177\/875697280603700307","article-title":"Longitudinal Analysis of Project Management Maturity","volume":"37","author":"Mullaly","year":"2006","journal-title":"Proj. Manag. J."},{"key":"ref_63","unstructured":"Nieto-Rodriguez, A., and Evrard, D. (2004). Boosting Business Performance through Programme and Project Management, PricewaterhouseCoopers."},{"key":"ref_64","doi-asserted-by":"crossref","unstructured":"Khoshgoftar, M., and Osman, O. (2009, January 8\u201311). Comparison of maturity models. Proceedings of the 2009 2nd IEEE International Conference on Computer Science and Information Technology, Beijing, China.","DOI":"10.1109\/ICCSIT.2009.5234402"},{"key":"ref_65","unstructured":"Prado, D. (2022, November 02). Fundamentos Do Modelo Prado-MMGP. Available online: https:\/\/docplayer.com.br\/2934179-Fundamentos-do-modelo-prado-mmgp.html."},{"key":"ref_66","unstructured":"Quality Management 2017 (Standard No. ISO NP ISO 10006:2017). Available online: https:\/\/www.iso.org\/standard\/70376.html."},{"key":"ref_67","doi-asserted-by":"crossref","first-page":"522","DOI":"10.1016\/S2212-5671(15)01264-2","article-title":"Improving Project Management Performance through Capability Maturity Measurement","volume":"30","author":"Miklosik","year":"2015","journal-title":"Procedia Econ. Financ."},{"key":"ref_68","unstructured":"Proen\u00e7a, D., and Borbinha, J. Maturity Models for Information Systems\u2014A State of the Art. Proceedings of the Procedia Computer Science, Available online: https:\/\/core.ac.uk\/download\/pdf\/82202525.pdf."},{"key":"ref_69","unstructured":"Carvalho, M., Laurindo, F., Pess\u00f4a, M., and Laurindo, B. (2005). Equival\u00eancia e Completeza: An\u00e1lise de Dois Modelos de Maturidade Em Gest\u00e3o de Projetos. Rev. Adm.-RAUSP, Available online: https:\/\/www.redalyc.org\/pdf\/2234\/223417392007.pdf."},{"key":"ref_70","unstructured":"Pinto, J. (2013). 100 Organizational Improvements Using OPM3\u00ae. PMI\u00ae, Available online: https:\/\/www.pmi.org\/learning\/library\/organizational-improvements-using-opm-5898."},{"key":"ref_71","doi-asserted-by":"crossref","first-page":"638","DOI":"10.1016\/j.ijproman.2014.07.002","article-title":"Identification of Variables That Impact Project Success in Brazilian Companies","volume":"33","author":"Berssaneti","year":"2015","journal-title":"Int. J. Proj. Manag."},{"key":"ref_72","doi-asserted-by":"crossref","unstructured":"Hillson, D. (2003). Assessing Organisational Project Management Capability. J. Facil. Manag.","DOI":"10.1108\/14725960410808276"},{"key":"ref_73","unstructured":"Frame, J. (1999). Project Management Competence: Building Key Skills for Individuals, Teams, and Organizations, Jossey-Bass."},{"key":"ref_74","unstructured":"Dire\u00e7\u00e3o-Geral do Ordenamento do Territ\u00f3rio e Desenvolvimento Ubano (2004). Vocabulario Do Ordenamento Do Territ\u00f3rio, Cole\u00e7\u00e3o In."},{"key":"ref_75","doi-asserted-by":"crossref","unstructured":"Collyer, S., and Warren, C. (2009). Project Management Approaches for Dynamic Environments. Int. J. Proj. Manag., Available online: https:\/\/www.researchgate.net\/publication\/222404311_Project_Management_Approaches_for_Dynamic_Environments.","DOI":"10.1016\/j.ijproman.2008.04.004"},{"key":"ref_76","doi-asserted-by":"crossref","unstructured":"Munns, A., and Bjeirmi, B. (1996). The Role of Project Management in Achieving Project Success. Int. J. Proj. Manag., Available online: https:\/\/notendur.hi.is\/vio1\/The_role_of_project_management_in_achieving_project_success.pdf.","DOI":"10.1016\/0263-7863(95)00057-7"},{"key":"ref_77","unstructured":"Kerzner, H. (2016). Gest\u00e3o de Projetos: As Melhores Pr\u00e1ticas, Bookman. [3rd ed.]."},{"key":"ref_78","doi-asserted-by":"crossref","unstructured":"Yazici, H.J. (2010). Role of Project Maturity and Organizational Culture on Project Success. 2010 PMI Res. Educ. Conf., 1\u201314.","DOI":"10.1002\/pmj.20121"},{"key":"ref_79","doi-asserted-by":"crossref","first-page":"457","DOI":"10.1016\/S0263-7863(02)00088-1","article-title":"Project Maturity in Organisations","volume":"21","author":"Andersen","year":"2003","journal-title":"Int. J. Proj. Manag."},{"key":"ref_80","unstructured":"Carvalho, M., Laurindo, F., and Pess\u00f4a, M. (2000). Information Technology Project Management to Achieve Efficiency in Brazilian Companies. RAUSP, Available online: https:\/\/www.semanticscholar.org\/paper\/Information-technology-project-management-to-in-Carvalho-Laurindo\/c26c91d868e18b2368e9c5b63b55ff8c6b821fe6."},{"key":"ref_81","unstructured":"Crosby, P. (1979). Quality Is Free: The Art of Making Quality Certain, McGraw-Hill."},{"key":"ref_82","unstructured":"Humphrey, W.S. (1989). Managing the Software Process. J. Inf. Technol., Available online: https:\/\/www.witpress.com\/Secure\/elibrary\/papers\/SQM94\/SQM94016FU.pdf."},{"key":"ref_83","unstructured":"OPM3\u00ae\u2014Third Edition (2013). Organizational Project Management Maturity Model, Project Management Institute. [3rd ed.]. Available online: https:\/\/faculty.kfupm.edu.sa\/MGM\/bubshait\/project%20management\/PDF\/opm3KF.pdf."},{"key":"ref_84","unstructured":"Pinto, J., and Williams, N. (2013, January 16). Country Project Management Maturity Capability. Proceedings of the PMI\u00ae Global Congress 2013\u2014EMEA, Istanbul, Turkey."},{"key":"ref_85","unstructured":"SEI-Software Engineering Institute (2006). Capability Maturity Model\u00ae for Development Version 1.2 (CMMI-DEV v1.2), SEI."}],"container-title":["Buildings"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/www.mdpi.com\/2075-5309\/13\/2\/557\/pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,10,10]],"date-time":"2025-10-10T18:39:42Z","timestamp":1760121582000},"score":1,"resource":{"primary":{"URL":"https:\/\/www.mdpi.com\/2075-5309\/13\/2\/557"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2023,2,17]]},"references-count":85,"journal-issue":{"issue":"2","published-online":{"date-parts":[[2023,2]]}},"alternative-id":["buildings13020557"],"URL":"https:\/\/doi.org\/10.3390\/buildings13020557","relation":{},"ISSN":["2075-5309"],"issn-type":[{"value":"2075-5309","type":"electronic"}],"subject":[],"published":{"date-parts":[[2023,2,17]]}}}