{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,5,13]],"date-time":"2026-05-13T17:02:40Z","timestamp":1778691760291,"version":"3.51.4"},"reference-count":66,"publisher":"MDPI AG","issue":"10","license":[{"start":{"date-parts":[[2025,5,14]],"date-time":"2025-05-14T00:00:00Z","timestamp":1747180800000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by\/4.0\/"}],"funder":[{"name":"national funds through the Funda\u00e7\u00e3o para a Ci\u00eancia e Tecnologia","award":["UIDB\/04625\/2020"],"award-info":[{"award-number":["UIDB\/04625\/2020"]}]}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Buildings"],"abstract":"<jats:p>Adopting building information modeling (BIM) within the architecture, engineering, and construction (AEC) industry presents an opportunity to tackle persistent challenges, such as chronic productivity deficits and emerging imperatives like sustainability. However, BIM implementation (BIMI) across European Union (EU) countries diverges due to different contexts and the complexity of BIM. This study aims to identify the main barriers to BIMI and recommend effective mitigation measures in Portugal, a late-adopting EU country. Initially, 28 BIMI barriers were identified through a literature review. Experts in a Delphi survey then selected 15 critical barriers. An interpretive structural modeling (ISM) model was developed with input from a focus group to clarify the hierarchical relationships among barriers, and an impact matrix cross-reference multiplication applied to a classification (MICMAC) analysis was performed to evaluate the barriers\u2019 driving and dependence powers. The resulting main barriers to BIMI include a lack of evaluation mechanisms, ignorance of BIM benefits, a shortage of skilled professionals, limited experience and cooperation, resistance to change, and inadequate top management support. Finally, experts in a second focus group developed mitigation measures to address the main barriers while ensuring the measures affect the entire barrier system. These findings will assist researchers, policymakers, and practitioners in late-adopter EU countries in addressing these barriers effectively.<\/jats:p>","DOI":"10.3390\/buildings15101651","type":"journal-article","created":{"date-parts":[[2025,5,14]],"date-time":"2025-05-14T08:44:58Z","timestamp":1747212298000},"page":"1651","update-policy":"https:\/\/doi.org\/10.3390\/mdpi_crossmark_policy","source":"Crossref","is-referenced-by-count":9,"title":["Barriers to Building Information Modeling (BIM) Implementation in Late-Adopting EU Countries: The Case of Portugal"],"prefix":"10.3390","volume":"15","author":[{"ORCID":"https:\/\/orcid.org\/0009-0008-0699-4006","authenticated-orcid":false,"given":"Miguel Pereira","family":"Louren\u00e7o","sequence":"first","affiliation":[{"name":"Instituto Superior T\u00e9cnico, Universidade de Lisboa, Av. Rovisco Pais, 1049-001 Lisbon, Portugal"}]},{"ORCID":"https:\/\/orcid.org\/0000-0003-1207-5854","authenticated-orcid":false,"given":"Am\u00edlcar","family":"Arantes","sequence":"additional","affiliation":[{"name":"CERIS, Instituto Superior T\u00e9cnico, Universidade de Lisboa, Av. Rovisco Pais, 1049-001 Lisbon, Portugal"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-5123-4451","authenticated-orcid":false,"given":"Ant\u00f3nio Aguiar","family":"Costa","sequence":"additional","affiliation":[{"name":"CERIS, Instituto Superior T\u00e9cnico, Universidade de Lisboa, Av. Rovisco Pais, 1049-001 Lisbon, Portugal"}]}],"member":"1968","published-online":{"date-parts":[[2025,5,14]]},"reference":[{"key":"ref_1","unstructured":"EU BIM Task Group (2017). Handbook for the Introduction of Building Information Modelling by the European Public Sector\u2014Strategic Action for Construction Sector Performance: Driving Value, Innovation and Growth, EU BIM Task Group."},{"key":"ref_2","unstructured":"IMPIC (2021). Relat\u00f3rio Do Setor Da Constru\u00e7\u00e3o Em 2021\u20141o Semestre, IMPIC."},{"key":"ref_3","unstructured":"Euroestat Construction Sector (2018). Gross Value Added of the Construction Sector in the EU, Euroestat Construction Sector."},{"key":"ref_4","doi-asserted-by":"crossref","first-page":"60","DOI":"10.1016\/j.jobe.2018.06.017","article-title":"Barriers to the Integration of BIM and Sustainability Practices in Construction Projects: A Delphi Survey of International Experts","volume":"20","author":"Olawumi","year":"2018","journal-title":"J. Build. Eng."},{"key":"ref_5","doi-asserted-by":"crossref","first-page":"368","DOI":"10.1061\/(ASCE)ME.1943-5479.0000368","article-title":"Construction Innovation: Fifth Generation Perspective","volume":"31","author":"Loosemore","year":"2015","journal-title":"J. Manag. Eng."},{"key":"ref_6","doi-asserted-by":"crossref","first-page":"3289","DOI":"10.1108\/ECAM-09-2019-0508","article-title":"Understanding the Risk Factors of BIM Technology Implementation in the Construction Industry: An Interpretive Structural Modeling (ISM) Approach","volume":"27","author":"Sun","year":"2020","journal-title":"Eng. Constr. Archit. Manag."},{"key":"ref_7","doi-asserted-by":"crossref","first-page":"554","DOI":"10.1108\/ECAM-04-2018-0158","article-title":"Barriers to BIM Implementation Strategies in China","volume":"26","author":"Zhou","year":"2019","journal-title":"Eng. Constr. Archit. Manag."},{"key":"ref_8","doi-asserted-by":"crossref","first-page":"182","DOI":"10.1080\/09613210010027701","article-title":"Public Policy and Construction Innovation","volume":"29","author":"Seaden","year":"2001","journal-title":"Build. Res. Inf."},{"key":"ref_9","doi-asserted-by":"crossref","first-page":"764","DOI":"10.3846\/20294913.2015.1087071","article-title":"A Literature Review of the Factors Limiting the Application of BIM in the Construction Industry","volume":"23","author":"Sun","year":"2017","journal-title":"Technol. Econ. Dev. Econ."},{"key":"ref_10","unstructured":"Jones, S.A., Young, N.W., and Bernstein, H.M. (2008). Building Information Modeling (BIM): Transforming Design and Construction to Achieve Greater Industry Productivity, McGraw-Hill Construction."},{"key":"ref_11","doi-asserted-by":"crossref","unstructured":"Onososen, A., and Musonda, I. (2022). Barriers to BIM-Based Life Cycle Sustainability Assessment for Buildings: An Interpretive Structural Modelling Approach. Buildings, 12.","DOI":"10.3390\/buildings12030324"},{"key":"ref_12","doi-asserted-by":"crossref","first-page":"2331","DOI":"10.1007\/s11831-020-09457-7","article-title":"What Is at the Root of Construction 4.0: A Systematic Review of the Recent Research Effort","volume":"28","author":"Boton","year":"2021","journal-title":"Arch. Comput. Methods Eng."},{"key":"ref_13","first-page":"13","article-title":"Building Information Modelling Adoption in the European Union: An Overview","volume":"25","author":"Charef","year":"2019","journal-title":"J. Build. Eng."},{"key":"ref_14","doi-asserted-by":"crossref","first-page":"6686761","DOI":"10.1155\/2021\/6686761","article-title":"Implementation of Building Information Modeling (BIM) Using Hybrid Z-DEMATEL-ISM Approach","volume":"2021","author":"Rezahoseini","year":"2021","journal-title":"Adv. Civ. Eng."},{"key":"ref_15","doi-asserted-by":"crossref","unstructured":"Mitera-Kie\u0142basa, E., and Zima, K. (2024). BIM Policy Trends in Europe: Insights from a Multi-Stage Analysis. Appl. Sci., 14.","DOI":"10.3390\/app14114363"},{"key":"ref_16","doi-asserted-by":"crossref","first-page":"2931","DOI":"10.1108\/ECAM-01-2020-0042","article-title":"Investigating the Barriers to Building Information Modeling (BIM) Implementation within the Nigerian Construction Industry","volume":"27","author":"Olanrewaju","year":"2020","journal-title":"Eng. Constr. Archit. Manag."},{"key":"ref_17","doi-asserted-by":"crossref","first-page":"286","DOI":"10.1016\/j.autcon.2017.04.005","article-title":"Macro BIM Adoption: Comparative Market Analysis","volume":"81","author":"Kassem","year":"2017","journal-title":"Autom. Constr."},{"key":"ref_18","doi-asserted-by":"crossref","first-page":"988","DOI":"10.1016\/j.autcon.2010.09.002","article-title":"Understanding and Facilitating BIM Adoption in the AEC Industry","volume":"19","author":"Gu","year":"2010","journal-title":"Autom. Constr."},{"key":"ref_19","first-page":"1","article-title":"BIM and 4D Planning: A Holistic Study of the Barriers and Drivers to Widespread Adoption","volume":"2","author":"Kassem","year":"2012","journal-title":"J. Constr. Eng. Proj. Manag."},{"key":"ref_20","first-page":"24","article-title":"Barriers of Implementing BIM in Construction Industry from the Designers\u2019 Perspective: A Hong Kong Experience","volume":"4","author":"Chan","year":"2014","journal-title":"J. Syst. Manag. Sci."},{"key":"ref_21","doi-asserted-by":"crossref","first-page":"91","DOI":"10.1108\/ECAM-05-2014-0067","article-title":"Adoption of Building Information Modelling Technology (BIM)","volume":"22","author":"Rogers","year":"2015","journal-title":"Eng. Constr. Archit. Manag."},{"key":"ref_22","doi-asserted-by":"crossref","first-page":"71","DOI":"10.5130\/AJCEB.v16i3.5159","article-title":"BIM Adoption within Australian Small and Medium-Sized Enterprises (SMEs): An Innovation Diffusion Model","volume":"16","author":"Hosseini","year":"2016","journal-title":"Constr. Econ. Build."},{"key":"ref_23","doi-asserted-by":"crossref","first-page":"3","DOI":"10.1186\/s40327-017-0040-7","article-title":"Barriers and Facilitators for BIM Use among Swedish Medium-Sized Contractors\u2014\u201cWe Wait until Someone Tells Us to Use It\u201d","volume":"5","author":"Isaksson","year":"2017","journal-title":"Vis. Eng."},{"key":"ref_24","doi-asserted-by":"crossref","first-page":"1398","DOI":"10.1108\/ECAM-05-2017-0091","article-title":"Bridging the Digital Divide Gap in BIM Technology Adoption","volume":"25","author":"Ayinla","year":"2018","journal-title":"Eng. Constr. Archit. Manag."},{"key":"ref_25","first-page":"1077","article-title":"Awareness and Challenges of Building Information Modelling (BIM) Implementation in the Yemen Construction Industry","volume":"17","author":"Gamil","year":"2019","journal-title":"J. Eng. Des. Technol."},{"key":"ref_26","doi-asserted-by":"crossref","unstructured":"Ma, G., Jia, J., Ding, J., Shang, S., and Jiang, S. (2019). Interpretive Structural Model Based Factor Analysis of BIM Adoption in Chinese Construction Organizations. Sustainability, 11.","DOI":"10.3390\/su11071982"},{"key":"ref_27","doi-asserted-by":"crossref","first-page":"100764","DOI":"10.1016\/j.jobe.2019.100764","article-title":"Perceived Benefits of and Barriers to Building Information Modelling (BIM) Implementation in Construction: The Case of Hong Kong","volume":"25","author":"Chan","year":"2019","journal-title":"J. Build. Eng."},{"key":"ref_28","first-page":"1842961","article-title":"An Empirical Analysis of Barriers to Building Information Modelling (BIM) Implementation in Construction Projects: Evidence from the Chinese Context","volume":"2020","author":"Ma","year":"2020","journal-title":"Int. J. Constr. Manag."},{"key":"ref_29","doi-asserted-by":"crossref","first-page":"261","DOI":"10.1108\/CI-09-2019-0087","article-title":"Profound Barriers to Building Information Modelling (BIM) Adoption in Construction Small and Medium-Sized Enterprises (SMEs): An Interpretive Structural Modelling Approach","volume":"20","author":"Saka","year":"2020","journal-title":"Constr. Innov."},{"key":"ref_30","doi-asserted-by":"crossref","unstructured":"Farooq, U., Ur Rehman, S.K., Javed, M.F., Jameel, M., Aslam, F., and Alyousef, R. (2020). Investigating BIM Implementation Barriers and Issues in Pakistan Using ISM Approach. Appl. Sci., 10.","DOI":"10.3390\/app10207250"},{"key":"ref_31","doi-asserted-by":"crossref","unstructured":"Manzoor, B., Othman, I., Gardezi, S.S.S., Altan, H., and Abdalla, S.B. (2021). Bim-Based Research Framework for Sustainable Building Projects: A Strategy for Mitigating Bim Implementation Barriers. Appl. Sci., 11.","DOI":"10.3390\/app11125397"},{"key":"ref_32","doi-asserted-by":"crossref","first-page":"236","DOI":"10.1007\/s42524-019-0088-2","article-title":"Understanding Barriers to BIM Implementation: Their Impact across Organizational Levels in Relation to BIM Maturity","volume":"8","author":"Siebelink","year":"2021","journal-title":"Front. Eng. Manag."},{"key":"ref_33","doi-asserted-by":"crossref","first-page":"108556","DOI":"10.1016\/j.buildenv.2021.108556","article-title":"Modelling the Relationship between Building Information Modelling (BIM) Implementation Barriers, Usage and Awareness on Building Project Lifecycle","volume":"207","author":"Olanrewaju","year":"2022","journal-title":"Build. Environ."},{"key":"ref_34","doi-asserted-by":"crossref","first-page":"103736","DOI":"10.1016\/j.jobe.2021.103736","article-title":"Barriers to the Implementation of Building Information Modelling (BIM) for Facility Management","volume":"46","author":"Durdyev","year":"2022","journal-title":"J. Build. Eng."},{"key":"ref_35","doi-asserted-by":"crossref","first-page":"2635","DOI":"10.1108\/ECAM-02-2021-0165","article-title":"A Multivariate Regression Approach toward Prioritizing BIM Adoption Barriers in the Ethiopian Construction Industry","volume":"29","author":"Alemayehu","year":"2022","journal-title":"Eng. Constr. Archit. Manag."},{"key":"ref_36","doi-asserted-by":"crossref","first-page":"511","DOI":"10.1108\/JFM-10-2021-0132","article-title":"Case Study on Barriers to Building Information Modelling Implementation in Malaysia","volume":"21","author":"Munianday","year":"2023","journal-title":"J. Facil. Manag."},{"key":"ref_37","doi-asserted-by":"crossref","first-page":"325","DOI":"10.4236\/ojce.2017.73022","article-title":"Barriers to the Adoption of Building Information Modeling in the Jordanian Building Industry","volume":"7","author":"Matarneh","year":"2017","journal-title":"Open J. Civ. Eng."},{"key":"ref_38","unstructured":"Hosseini, M.R., Azari, E., Tivendale, L., and Chileshe, N. (2015, January 24). Barriers to Adoption of Building Information Modeling (BIM) in Iran: Preliminary Results. Proceedings of the International Conference on Engineering Project And Production Management (EPPM), Queensland, Australia."},{"key":"ref_39","doi-asserted-by":"crossref","first-page":"134","DOI":"10.1108\/ECAM-06-2014-0087","article-title":"Drivers for Adopting Reverse Logistics in the Construction Industry: A Qualitative Study","volume":"23","author":"Chileshe","year":"2016","journal-title":"Eng. Constr. Archit. Manag."},{"key":"ref_40","doi-asserted-by":"crossref","first-page":"05018009","DOI":"10.1061\/(ASCE)ME.1943-5479.0000644","article-title":"Loosely Coupled Systems of Innovation: Aligning BIM Adoption with Implementation in Dutch Construction","volume":"34","author":"Papadonikolaki","year":"2018","journal-title":"J. Manag. Eng."},{"key":"ref_41","doi-asserted-by":"crossref","first-page":"949","DOI":"10.1016\/j.jclepro.2019.02.141","article-title":"Barriers to Building Information Modeling (BIM) Implementation in China\u2019s Prefabricated Construction: An Interpretive Structural Modeling (ISM) Approach","volume":"219","author":"Tan","year":"2019","journal-title":"J. Clean. Prod."},{"key":"ref_42","first-page":"1354514","article-title":"Investigating the Causes of Delay in Grain Bin Construction Projects: The Case of China","volume":"19","author":"Chen","year":"2019","journal-title":"Int. J. Constr. Manag."},{"key":"ref_43","doi-asserted-by":"crossref","first-page":"107","DOI":"10.1007\/s11577-017-0454-1","article-title":"How to Construct a Mixed Methods Research Design","volume":"69","author":"Schoonenboom","year":"2017","journal-title":"Kolner Z. Soz. Sozpsychol."},{"key":"ref_44","doi-asserted-by":"crossref","first-page":"108","DOI":"10.1061\/(ASCE)CO.1943-7862.0000026","article-title":"Mixed Method Research: Fundamental Issues of Design, Validity, and Reliability in Construction Research","volume":"136","author":"Abowitz","year":"2010","journal-title":"J. Constr. Eng. Manag."},{"key":"ref_45","doi-asserted-by":"crossref","first-page":"74","DOI":"10.1109\/TSMC.1974.5408523","article-title":"Developing Subsystem Matrices in Structural Modeling","volume":"SMC-4","author":"Warfield","year":"1974","journal-title":"IEEE Trans. Syst. Man Cybern."},{"key":"ref_46","doi-asserted-by":"crossref","unstructured":"(2012). Sushil Interpreting the Interpretive Structural Model. Glob. J. Flex. Syst. Manag., 13, 87\u2013106.","DOI":"10.1007\/s40171-012-0008-3"},{"key":"ref_47","unstructured":"Duperrin, J.-C., and Godet, M. (1973). M\u00e9thode de Hi\u00e9rarchisation Des \u00c9l\u00e9ments d\u2019un Syst\u00e8me: Essai de Prospective Du Syst\u00e8me de l\u2019\u00e9nergie Nucl\u00e9aire Dans Son Contexte Soci\u00e9tal, CEA."},{"key":"ref_48","doi-asserted-by":"crossref","first-page":"2878","DOI":"10.1108\/ECAM-02-2021-0112","article-title":"Barriers to Adoption of Reverse Logistics: A Case of Construction, Real Estate, Infrastructure and Project (CRIP) Sectors","volume":"29","author":"Ambekar","year":"2021","journal-title":"Eng. Constr. Archit. Manag."},{"key":"ref_49","doi-asserted-by":"crossref","first-page":"133","DOI":"10.1111\/j.1541-0064.1990.tb01258.x","article-title":"The Policy Delphi: Purpose, Structure, and Application","volume":"34","author":"Needham","year":"1990","journal-title":"Can. Geogr.\/Le G\u00e9ographe Can."},{"key":"ref_50","doi-asserted-by":"crossref","first-page":"129","DOI":"10.1146\/annurev.soc.22.1.129","article-title":"Focus Groups","volume":"22","author":"Morgan","year":"1996","journal-title":"Annu. Rev. Sociol."},{"key":"ref_51","doi-asserted-by":"crossref","first-page":"299","DOI":"10.1136\/bmj.311.7000.299","article-title":"Qualitative Research: Introducing Focus Groups","volume":"311","author":"Kitzinger","year":"1995","journal-title":"Bmj"},{"key":"ref_52","doi-asserted-by":"crossref","unstructured":"Alghuried, A. (2023). Measuring the Benefits and Barriers of the Implementation of BIM in Sustainable Practice in the Construction Industry of Saudi Arabia. Sustainability, 15.","DOI":"10.3390\/su151914323"},{"key":"ref_53","doi-asserted-by":"crossref","first-page":"20","DOI":"10.1108\/IJMPB-09-2018-0178","article-title":"Causes of Delays on Construction Projects: A Comprehensive List","volume":"13","author":"Durdyev","year":"2019","journal-title":"Int. J. Manag. Proj. Bus."},{"key":"ref_54","doi-asserted-by":"crossref","unstructured":"Saliu, L.O., Monko, R., Zulu, S., and Maro, G. (2024). Barriers to the Integration of Building Information Modeling (BIM) in Modular Construction in Sub-Saharan Africa. Buildings, 14.","DOI":"10.3390\/buildings14082448"},{"key":"ref_55","doi-asserted-by":"crossref","unstructured":"Waqar, A., Qureshi, A.H., and Alaloul, W.S. (2023). Barriers to Building Information Modeling (BIM) Deployment in Small Construction Projects: Malaysian Construction Industry. Sustainability, 15.","DOI":"10.3390\/su15032477"},{"key":"ref_56","doi-asserted-by":"crossref","first-page":"459","DOI":"10.1061\/(ASCE)CO.1943-7862.0000109","article-title":"Organizational Divisions in BIM-Enabled Commercial Construction","volume":"136","author":"Dossick","year":"2010","journal-title":"J. Constr. Eng. Manag."},{"key":"ref_57","doi-asserted-by":"crossref","unstructured":"Pimentel, M., Arantes, A., and Cruz, C.O. (2022). Barriers to the Adoption of Reverse Logistics in the Construction Industry: A Combined ISM and MICMAC Approach. Sustainability, 14.","DOI":"10.3390\/su142315786"},{"key":"ref_58","doi-asserted-by":"crossref","unstructured":"Ribeiro, A.M., Arantes, A., and Cruz, C.O. (2022). Barriers to the Adoption of Modular Construction in Portugal: An Interpretive Structural Modelling Approach. Buildings, 12.","DOI":"10.3390\/buildings12101509"},{"key":"ref_59","doi-asserted-by":"crossref","first-page":"14","DOI":"10.1155\/2013\/983721","article-title":"BIM: Enabling Sustainability and Asset Management through Knowledge Management","volume":"2013","author":"Kivits","year":"2013","journal-title":"Sci. World J."},{"key":"ref_60","first-page":"78","article-title":"Building Information Modeling (BIM) in Iran: An Exploratory Study","volume":"6","author":"Hosseini","year":"2016","journal-title":"J. Eng. Proj. Prod. Manag."},{"key":"ref_61","doi-asserted-by":"crossref","first-page":"100907","DOI":"10.1016\/j.jobe.2019.100907","article-title":"Facilitating Building Information Modelling (BIM) Using Integrated Project Delivery (IPD): A UK Perspective","volume":"26","author":"Piroozfar","year":"2019","journal-title":"J. Build. Eng."},{"key":"ref_62","doi-asserted-by":"crossref","unstructured":"Mohammadi, M., Rashidi, M., Mousavi, V., Yu, Y., and Samali, B. (2022). Application of TLS Method in Digitization of Bridge Infrastructures: A Path to BrIM Development. Remote Sens., 14.","DOI":"10.3390\/rs14051148"},{"key":"ref_63","doi-asserted-by":"crossref","first-page":"103881","DOI":"10.1016\/j.compind.2023.103881","article-title":"Integration of TLS-Derived Bridge Information Modeling (BrIM) with a Decision Support System (DSS) for Digital Twinning and Asset Management of Bridge Infrastructures","volume":"147","author":"Mohammadi","year":"2023","journal-title":"Comput. Ind."},{"key":"ref_64","doi-asserted-by":"crossref","first-page":"100056","DOI":"10.1016\/j.dibe.2021.100056","article-title":"HBIM Platform & Smart Sensing as a Tool for Monitoring and Visualizing Energy Performance of Heritage Buildings","volume":"8","author":"Nagy","year":"2021","journal-title":"Dev. Built Environ."},{"key":"ref_65","doi-asserted-by":"crossref","first-page":"259","DOI":"10.1080\/15583058.2023.2277324","article-title":"Model Updating of Cultural Heritage Buildings Through Swarm Intelligence Algorithms","volume":"19","author":"Gara","year":"2023","journal-title":"Int. J. Archit. Herit."},{"key":"ref_66","doi-asserted-by":"crossref","unstructured":"Saka, A.B., Chan, D.M., and Siu, F.M.F. (2020). Drivers of Sustainable Adoption of Building Information Modelling (BIM) in the Nigerian Construction Small and Medium-Sized Enterprises (SMEs). Sustainability, 12.","DOI":"10.3390\/su12093710"}],"container-title":["Buildings"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/www.mdpi.com\/2075-5309\/15\/10\/1651\/pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,10,9]],"date-time":"2025-10-09T17:32:36Z","timestamp":1760031156000},"score":1,"resource":{"primary":{"URL":"https:\/\/www.mdpi.com\/2075-5309\/15\/10\/1651"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2025,5,14]]},"references-count":66,"journal-issue":{"issue":"10","published-online":{"date-parts":[[2025,5]]}},"alternative-id":["buildings15101651"],"URL":"https:\/\/doi.org\/10.3390\/buildings15101651","relation":{},"ISSN":["2075-5309"],"issn-type":[{"value":"2075-5309","type":"electronic"}],"subject":[],"published":{"date-parts":[[2025,5,14]]}}}