{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,3,16]],"date-time":"2026-03-16T23:38:41Z","timestamp":1773704321464,"version":"3.50.1"},"reference-count":66,"publisher":"MDPI AG","issue":"1","license":[{"start":{"date-parts":[[2022,12,30]],"date-time":"2022-12-30T00:00:00Z","timestamp":1672358400000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by\/4.0\/"}],"funder":[{"DOI":"10.13039\/501100007434","name":"Ag\u00eancia Nacional de Inova\u00e7\u00e3o","doi-asserted-by":"publisher","award":["NORTE-01-0247-FEDER-047054"],"award-info":[{"award-number":["NORTE-01-0247-FEDER-047054"]}],"id":[{"id":"10.13039\/501100007434","id-type":"DOI","asserted-by":"publisher"}]}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Encyclopedia"],"abstract":"<jats:p>Interest in sustainable construction has been increasing due to recent events. The limitations of natural resources and the scale of global impacts, specifically as a result of the effects of global climate change, have consequences for the construction sector. These changes are giving rise to a need to reassess the way we face the built environment and rethink new solutions for construction systems or methods that contribute to mitigating negative consequences, among which we highlight the prefabrication method. This new scenario, characterised by the need to meet the decarbonisation goals set for 2050, as well as the effects of the spread of the pandemic crisis, emphasizes the importance of understanding the impacts that may occur in the construction industry, which are essentially understood as increases in sustainability, productivity, quality and, consequently, as reductions in deadlines, costs, and dependence on labour. Therefore, this entry seeks to study on the existing literature on prefabrication, seeking to gather relevant information on the new advances, challenges, and opportunities of this construction method whose approach has been mostly focused on partial or specific aspects for case studies, both highlighting the potential and identifying the gaps and opportunities of prefabrication in this new context. The prefabrication method brings benefits compared to the conventional method, and may be an alternative, as it has more positive global impacts on the environment, the economy, and society, and consequently on the sustainable development of construction, despite some limitations that have been reported and that should be looked into in the future.<\/jats:p>","DOI":"10.3390\/encyclopedia3010003","type":"journal-article","created":{"date-parts":[[2023,1,2]],"date-time":"2023-01-02T04:56:27Z","timestamp":1672635387000},"page":"28-45","update-policy":"https:\/\/doi.org\/10.3390\/mdpi_crossmark_policy","source":"Crossref","is-referenced-by-count":48,"title":["Impacts of Prefabrication in the Building Construction Industry"],"prefix":"10.3390","volume":"3","author":[{"ORCID":"https:\/\/orcid.org\/0000-0002-5300-3278","authenticated-orcid":false,"given":"Patr\u00edcia Fernandes","family":"Rocha","sequence":"first","affiliation":[{"name":"Houselab, 4465-097 Matosinhos, Portugal"}]},{"given":"Nuno Oliveira","family":"Ferreira","sequence":"additional","affiliation":[{"name":"Houselab, 4465-097 Matosinhos, Portugal"}]},{"given":"Fernando","family":"Pimenta","sequence":"additional","affiliation":[{"name":"Houselab, 4465-097 Matosinhos, Portugal"}]},{"ORCID":"https:\/\/orcid.org\/0000-0001-8752-7056","authenticated-orcid":false,"given":"Nelson Bento","family":"Pereira","sequence":"additional","affiliation":[{"name":"CiCon, 4465-097 Matosinhos, Portugal"}]}],"member":"1968","published-online":{"date-parts":[[2022,12,30]]},"reference":[{"key":"ref_1","doi-asserted-by":"crossref","first-page":"103551","DOI":"10.1016\/j.scs.2021.103551","article-title":"A Dynamic Simulation Study on the Sustainability of Prefabricated Buildings","volume":"77","author":"Liu","year":"2021","journal-title":"Sustain. Cities Soc."},{"key":"ref_2","unstructured":"United Nations Environment Programme (2020). 2020 Global Status Report for Buildings and Construction: Towards a Zero-emission, Efficient and Resilient Buildings and Construction Sector, United Nations Environment Programme."},{"key":"ref_3","unstructured":"United Nations Environment Programme (2021). 2021 Global Status Report for Buildings and Construction: Towards a Zero-emission, Efficient and Resilient Buildings and Construction Sector, United Nations Environment Programme."},{"key":"ref_4","doi-asserted-by":"crossref","first-page":"4620","DOI":"10.1002\/cepa.523","article-title":"21.15: Resource efficiency in the building sector: Application to steel buildings","volume":"1","author":"Dimova","year":"2017","journal-title":"ce\/Papers"},{"key":"ref_5","doi-asserted-by":"crossref","first-page":"102705","DOI":"10.1016\/j.jobe.2021.102705","article-title":"Prefabricated versus conventional construction: Comparing life-cycle impacts of alternative structural materials","volume":"41","author":"Tavares","year":"2021","journal-title":"J. Build. Eng."},{"key":"ref_6","doi-asserted-by":"crossref","first-page":"665","DOI":"10.1016\/j.autcon.2010.02.011","article-title":"Decision support for construction method selection in concrete buildings: Prefabrication adoption and optimization","volume":"19","author":"Chen","year":"2010","journal-title":"Autom. Constr."},{"key":"ref_7","doi-asserted-by":"crossref","first-page":"1171","DOI":"10.1016\/j.rser.2016.05.031","article-title":"Life cycle performance of modular buildings: A critical review","volume":"62","author":"Kamali","year":"2016","journal-title":"Renew. Sustain. Energy Rev."},{"key":"ref_8","doi-asserted-by":"crossref","first-page":"100979","DOI":"10.1016\/j.jobe.2019.100979","article-title":"Assessing the productivity of prefabricated and in-situ construction systems using hybrid multi-criteria decision making method","volume":"27","author":"Shahpari","year":"2020","journal-title":"J. Build. Eng."},{"key":"ref_9","doi-asserted-by":"crossref","first-page":"649","DOI":"10.1016\/j.jclepro.2017.10.171","article-title":"Barriers to promoting prefabricated construction in China: A cost\u2013benefit analysis","volume":"172","author":"Hong","year":"2018","journal-title":"J. Clean. Prod."},{"key":"ref_10","unstructured":"McKinsey Global Institute (2017). Reinventing Construction: A Route to Higher Productivity. Reinventing Construction: A Route to Higher Productivity, McKinsey & Company."},{"key":"ref_11","doi-asserted-by":"crossref","first-page":"8876102","DOI":"10.1155\/2020\/8876102","article-title":"Cause Analysis of Hindering On-Site Lean Construction for Prefabricated Buildings and Corresponding Organizational Capability Evaluation","volume":"2020","author":"Yuan","year":"2020","journal-title":"Adv. Civ. Eng."},{"key":"ref_12","doi-asserted-by":"crossref","first-page":"1264","DOI":"10.1016\/j.jclepro.2019.04.150","article-title":"Building information modelling-based framework to contrast conventional and modular construction methods through selected sustainability factors","volume":"228","author":"Hammad","year":"2019","journal-title":"J. Clean. Prod."},{"key":"ref_13","doi-asserted-by":"crossref","first-page":"59","DOI":"10.1016\/j.autcon.2017.01.006","article-title":"Prefabricated construction enabled by the Internet-of-Things","volume":"76","author":"Zhong","year":"2017","journal-title":"Autom. Constr."},{"key":"ref_14","doi-asserted-by":"crossref","unstructured":"Richard, R.-B. (2003, January 24). Industrialized Building Systems: Reproduction before Automation and Robotics. Proceedings of the 20th International Symposium on Automation and Robotics in Construction ISARC 2003\u2014The Future Site, Eindhoven, The Netherlands.","DOI":"10.22260\/ISARC2003\/0056"},{"key":"ref_15","doi-asserted-by":"crossref","first-page":"123","DOI":"10.1016\/j.proeng.2014.10.536","article-title":"Development of a BIM-based Automated Construction System","volume":"85","author":"Ding","year":"2014","journal-title":"Procedia Eng."},{"key":"ref_16","doi-asserted-by":"crossref","first-page":"429","DOI":"10.1016\/j.apenergy.2016.03.058","article-title":"Comparative life cycle energy and cost analysis of post-disaster temporary housings","volume":"171","author":"Atmaca","year":"2016","journal-title":"Appl. Energy"},{"key":"ref_17","unstructured":"Lawson, R.M., and Ogden, R.G. (2010, January 10\u201313). Sustainability and process benefits of modular construction. Proceedings of the 18th CIB World Building Congress, Salford, UK."},{"key":"ref_18","doi-asserted-by":"crossref","first-page":"05020014","DOI":"10.1061\/(ASCE)CO.1943-7862.0001924","article-title":"Development Trend and Segmentation of the US Green Building Market: Corporate Perspective on Green Contractors and Design Firms","volume":"146","author":"Han","year":"2020","journal-title":"J. Constr. Eng. Manag."},{"key":"ref_19","unstructured":"Company, M. (2019). Modular Construction: From Projects to Products, McKinsey & Company."},{"key":"ref_20","doi-asserted-by":"crossref","first-page":"883","DOI":"10.1016\/j.engstruct.2019.01.061","article-title":"New advancements, challenges and opportunities of multi-storey modular buildings\u2014A state-of-the-art review","volume":"183","author":"Ferdous","year":"2019","journal-title":"Eng. Struct."},{"key":"ref_21","doi-asserted-by":"crossref","first-page":"553","DOI":"10.1016\/j.habitatint.2011.03.005","article-title":"Environmental impacts of prefabricated school buildings in Catalonia","volume":"35","author":"Pons","year":"2011","journal-title":"Habitat Int."},{"key":"ref_22","doi-asserted-by":"crossref","first-page":"243","DOI":"10.1111\/j.1530-9290.2011.00424.x","article-title":"Construction Matters: Comparing Environmental Impacts of Building Modular and Conventional Homes in the United States","volume":"16","author":"Quale","year":"2012","journal-title":"J. Ind. Ecol."},{"key":"ref_23","doi-asserted-by":"crossref","first-page":"109479","DOI":"10.1016\/j.enbuild.2019.109479","article-title":"Conventional versus modular construction methods: A comparative cradle-to-gate LCA for residential buildings","volume":"204","author":"Kamali","year":"2019","journal-title":"Energy Build."},{"key":"ref_24","doi-asserted-by":"crossref","unstructured":"Xue, H., Zhang, S., Su, Y., and Wu, Z. (2017). Factors Affecting the Capital Cost of Prefabrication\u2014A Case Study of China. Sustainability, 9.","DOI":"10.3390\/su9091512"},{"key":"ref_25","doi-asserted-by":"crossref","first-page":"101474","DOI":"10.1016\/j.jobe.2020.101474","article-title":"An approach for sustainable, cost-effective and optimised material design for the prefabricated non-structural components of residential buildings","volume":"32","author":"Wasim","year":"2020","journal-title":"J. Build. Eng."},{"key":"ref_26","unstructured":"Cameron, P.J.K., and Carlo, N.G.D. (2022, September 28). Piecing Together Modular: Understanding the Benefits and Limitations of Modular Construction Methods for Multifamily Development. Available online: https:\/\/core.ac.uk\/download\/pdf\/4406618.pdf."},{"key":"ref_27","first-page":"908809","article-title":"Three dimensions of sustainability and floating architecture","volume":"5","author":"Moon","year":"2014","journal-title":"Int. J. Sustain. Build. Technol. Urban Dev."},{"key":"ref_28","doi-asserted-by":"crossref","first-page":"104504","DOI":"10.1016\/j.jobe.2022.104504","article-title":"Life cycle assessment of a prefabricated house for seven locations in different climates","volume":"53","author":"Tavares","year":"2022","journal-title":"J. Build. Eng."},{"key":"ref_29","doi-asserted-by":"crossref","first-page":"104776","DOI":"10.1016\/j.jobe.2022.104776","article-title":"Environmental life cycle evaluation of prefabricated residential construction in China","volume":"57","author":"Tian","year":"2022","journal-title":"J. Build. Eng."},{"key":"ref_30","doi-asserted-by":"crossref","first-page":"3866","DOI":"10.1016\/j.matpr.2022.07.171","article-title":"Life cycle assessment of construction materials and its environmental impacts for sustainable development","volume":"65","author":"Desai","year":"2022","journal-title":"Mater. Today Proc."},{"key":"ref_31","doi-asserted-by":"crossref","first-page":"3021","DOI":"10.1007\/s11277-018-5323-3","article-title":"Cloud Model-Based Safety Performance Evaluation of Prefabricated Building Project in China","volume":"102","author":"Liu","year":"2018","journal-title":"Wirel. Pers. Commun."},{"key":"ref_32","doi-asserted-by":"crossref","first-page":"101715","DOI":"10.1016\/j.scs.2019.101715","article-title":"A selection model based on SWOT analysis for determining a suitable strategy of prefabrication implementation in rural areas","volume":"50","author":"Zhou","year":"2019","journal-title":"Sustain. Cities Soc."},{"key":"ref_33","doi-asserted-by":"crossref","first-page":"3592","DOI":"10.1016\/j.jclepro.2016.10.108","article-title":"Development of performance criteria for sustainability evaluation of modular versus conventional construction methods","volume":"142","author":"Mohammad","year":"2017","journal-title":"J. Clean. Prod."},{"key":"ref_34","doi-asserted-by":"crossref","first-page":"108382","DOI":"10.1016\/j.buildenv.2021.108382","article-title":"What is the potential for prefabricated buildings to decrease costs and contribute to meeting EU environmental targets?","volume":"206","author":"Tavares","year":"2021","journal-title":"Build. Environ."},{"key":"ref_35","doi-asserted-by":"crossref","first-page":"148","DOI":"10.1061\/(ASCE)AE.1943-5568.0000057","article-title":"Application of Modular Construction in High-Rise Buildings","volume":"18","author":"Lawson","year":"2012","journal-title":"J. Archit. Eng."},{"key":"ref_36","doi-asserted-by":"crossref","first-page":"676","DOI":"10.1016\/j.jclepro.2017.12.101","article-title":"A system dynamics-based environmental benefit assessment model of construction waste reduction management at the design and construction stages","volume":"176","author":"Ding","year":"2018","journal-title":"J. Clean. Prod."},{"key":"ref_37","unstructured":"European Construction Sector Observatory (2019). Housing Affordability and Sustainability in the EU, European Construction Sector Observatory. Analytical Report."},{"key":"ref_38","doi-asserted-by":"crossref","first-page":"1044","DOI":"10.1016\/j.jclepro.2018.12.028","article-title":"Embodied energy and greenhouse gas emissions analysis of a prefabricated modular house: The \u201cMoby\u201d case study","volume":"212","author":"Tavares","year":"2019","journal-title":"J. Clean. Prod."},{"key":"ref_39","doi-asserted-by":"crossref","first-page":"165","DOI":"10.1016\/j.enbuild.2013.07.033","article-title":"Comparative study of greenhouse gas emissions between off-site prefabrication and conventional construction methods: Two case studies of residential projects","volume":"66","author":"Mao","year":"2013","journal-title":"Energy Build."},{"key":"ref_40","doi-asserted-by":"crossref","first-page":"711","DOI":"10.1007\/s00107-017-1236-1","article-title":"Life cycle assessment of product- and construction stage of prefabricated timber houses: A sector representative approach for Germany according to EN 15804, EN 15978 and EN 16485","volume":"76","author":"Achenbach","year":"2017","journal-title":"Eur. J. Wood Wood Prod."},{"key":"ref_41","doi-asserted-by":"crossref","first-page":"2198","DOI":"10.1016\/j.jclepro.2015.10.030","article-title":"Life-cycle energy analysis of prefabricated building components: An input\u2013output-based hybrid model","volume":"112","author":"Hong","year":"2016","journal-title":"J. Clean. Prod."},{"key":"ref_42","doi-asserted-by":"crossref","unstructured":"Navaratnam, S., Ngo, T., Gunawardena, T., and Henderson, D. (2019). Performance Review of Prefabricated Building Systems and Future Research in Australia. Buildings, 9.","DOI":"10.3390\/buildings9020038"},{"key":"ref_43","doi-asserted-by":"crossref","first-page":"106716","DOI":"10.1016\/j.resconrec.2022.106716","article-title":"Life cycle assessment of post-demolition autoclaved aerated concrete (AAC) recycling options","volume":"188","author":"Volk","year":"2023","journal-title":"Resour. Conserv. Recycl."},{"key":"ref_44","doi-asserted-by":"crossref","unstructured":"Onat, N.C., Kucukvar, M., Halog, A., and Cloutier, S. (2017). Systems Thinking for Life Cycle Sustainability Assessment: A Review of Recent Developments, Applications, and Future Perspectives. Sustainability, 9.","DOI":"10.3390\/su9050706"},{"key":"ref_45","doi-asserted-by":"crossref","unstructured":"Colangelo, F., Forcina, A., Farina, I., and Petrillo, A. (2018). Life Cycle Assessment (LCA) of Different Kinds of Concrete Containing Waste for Sustainable Construction. Buildings, 8.","DOI":"10.3390\/buildings8050070"},{"key":"ref_46","doi-asserted-by":"crossref","first-page":"158","DOI":"10.1016\/j.buildenv.2019.01.034","article-title":"Integrating building information modeling and life cycle assessment in the early and detailed building design stages","volume":"153","author":"Rezaei","year":"2019","journal-title":"Build. Environ."},{"key":"ref_47","doi-asserted-by":"crossref","unstructured":"Wu, Z., Luo, L., Li, H., Wang, Y., Bi, G., and Antwi-Afari, M.F. (2021). An analysis on promoting prefabrication implementation in construction industry towards sustainability. Int. J. Environ. Res. Public Health, 18.","DOI":"10.3390\/ijerph182111493"},{"key":"ref_48","doi-asserted-by":"crossref","first-page":"101821","DOI":"10.1016\/j.asej.2022.101821","article-title":"Interaction mechanism of BIM application barriers in prefabricated construction and driving strategies from stakeholders\u2019 perspectives","volume":"14","author":"Xu","year":"2023","journal-title":"Ain Shams Eng. J."},{"key":"ref_49","doi-asserted-by":"crossref","first-page":"485","DOI":"10.3846\/jcem.2021.15600","article-title":"A holistic literature review of building information modeling for prefabricated construction","volume":"27","author":"Zhang","year":"2021","journal-title":"J. Civ. Eng. Manag."},{"key":"ref_50","doi-asserted-by":"crossref","first-page":"137870","DOI":"10.1016\/j.scitotenv.2020.137870","article-title":"Carbon emission reduction in prefabrication construction during materialization stage: A BIM-based life-cycle assessment approach","volume":"723","author":"Hao","year":"2020","journal-title":"Sci. Total Environ."},{"key":"ref_51","doi-asserted-by":"crossref","first-page":"14","DOI":"10.1080\/2093761X.2015.1006708","article-title":"Life cycle environmental performance of material specification: A BIM-enhanced comparative assessment","volume":"6","author":"Ajayi","year":"2015","journal-title":"Int. J. Sustain. Build. Technol. Urban Dev."},{"key":"ref_52","doi-asserted-by":"crossref","first-page":"133894","DOI":"10.1016\/j.jclepro.2022.133894","article-title":"BIM-integrated LCA to automate embodied carbon assessment of prefabricated buildings","volume":"374","author":"Xu","year":"2022","journal-title":"J. Clean. Prod."},{"key":"ref_53","doi-asserted-by":"crossref","unstructured":"Yuan, Z., Zhou, J., Qiao, Y., Zhang, Y., Liu, D., and Zhu, H. (2020). BIM-VE-Based Optimization of Green Building Envelope from the Perspective of both Energy Saving and Life Cycle Cost. Sustainability, 12.","DOI":"10.3390\/su12197862"},{"key":"ref_54","doi-asserted-by":"crossref","first-page":"37","DOI":"10.1016\/j.autcon.2017.04.002","article-title":"A scientometric review of global BIM research: Analysis and visualization","volume":"80","author":"Zhao","year":"2017","journal-title":"Autom. Constr."},{"key":"ref_55","doi-asserted-by":"crossref","first-page":"100436","DOI":"10.1016\/j.clet.2022.100436","article-title":"The current use of industrialized construction techniques in France: Benefits, limits and future expectations","volume":"7","author":"Attouri","year":"2022","journal-title":"Clean. Eng. Technol."},{"key":"ref_56","doi-asserted-by":"crossref","unstructured":"Chauhan, K., Peltokorpi, A., Lavikka, R., and Sepp\u00e4nen, O. (Constr. Innov., 2022). To prefabricate or not? A method for evaluating the impact of prefabrication in building construction, Constr. Innov., ahead of print.","DOI":"10.1108\/CI-11-2021-0205"},{"key":"ref_57","doi-asserted-by":"crossref","first-page":"118390","DOI":"10.1016\/j.jclepro.2019.118390","article-title":"Evaluating different stakeholder impacts on the occurrence of quality defects in offsite construction projects: A Bayesian-network-based model","volume":"241","author":"Yu","year":"2019","journal-title":"J. Clean. Prod."},{"key":"ref_58","doi-asserted-by":"crossref","first-page":"177","DOI":"10.1016\/j.enpol.2018.11.029","article-title":"Making incentive policies more effective: An agent-based model for energy-efficiency retrofit in China","volume":"126","author":"Liang","year":"2019","journal-title":"Energy Policy"},{"key":"ref_59","doi-asserted-by":"crossref","first-page":"59","DOI":"10.1108\/OHI-03-2014-B0007","article-title":"Time-Efficient Post-Disaster Housing Reconstruction with Prefabricated Modular Structures","volume":"39","author":"Gunawardena","year":"2014","journal-title":"Open House Int."},{"key":"ref_60","doi-asserted-by":"crossref","first-page":"240","DOI":"10.1016\/j.habitatint.2014.04.001","article-title":"Critical review of the research on the management of prefabricated construction","volume":"43","author":"Li","year":"2014","journal-title":"Habitat Int."},{"key":"ref_61","doi-asserted-by":"crossref","first-page":"1","DOI":"10.1016\/j.autcon.2018.07.027","article-title":"Optimization modeling of multi-skilled resources in prefabrication: Theorizing cost analysis of process integration in off-site construction","volume":"95","author":"Arashpour","year":"2018","journal-title":"Autom. Constr."},{"key":"ref_62","doi-asserted-by":"crossref","first-page":"05021002","DOI":"10.1061\/(ASCE)ME.1943-5479.0000907","article-title":"Empirical Study of Identifying Logistical Problems in Prefabricated Interior Wall Panel Construction","volume":"37","author":"Lee","year":"2021","journal-title":"J. Manag. Eng."},{"key":"ref_63","doi-asserted-by":"crossref","first-page":"366","DOI":"10.1016\/j.jclepro.2018.02.308","article-title":"A model for simulating schedule risks in prefabrication housing production: A case study of six-day cycle assembly activities in Hong Kong","volume":"185","author":"Li","year":"2018","journal-title":"J. Clean. Prod."},{"key":"ref_64","doi-asserted-by":"crossref","first-page":"117791","DOI":"10.1016\/j.jclepro.2019.117791","article-title":"Systematic embodied carbon assessment and reduction of prefabricated high-rise public residential buildings in Hong Kong","volume":"238","author":"Teng","year":"2019","journal-title":"J. Clean. Prod."},{"key":"ref_65","doi-asserted-by":"crossref","first-page":"5928235","DOI":"10.1155\/2018\/5928235","article-title":"Complexity Analysis of Prefabrication Contractors\u2019 Dynamic Price Competition in Mega Projects with Different Competition Strategies","volume":"2018","author":"Zhu","year":"2018","journal-title":"Complexity"},{"key":"ref_66","doi-asserted-by":"crossref","first-page":"10","DOI":"10.1080\/17457300.2015.1047865","article-title":"Safety concerns related to modular\/prefabricated building construction","volume":"24","author":"Fard","year":"2017","journal-title":"Int. J. Inj. Control. Saf. Promot."}],"container-title":["Encyclopedia"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/www.mdpi.com\/2673-8392\/3\/1\/3\/pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,10,11]],"date-time":"2025-10-11T01:48:42Z","timestamp":1760147322000},"score":1,"resource":{"primary":{"URL":"https:\/\/www.mdpi.com\/2673-8392\/3\/1\/3"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2022,12,30]]},"references-count":66,"journal-issue":{"issue":"1","published-online":{"date-parts":[[2023,3]]}},"alternative-id":["encyclopedia3010003"],"URL":"https:\/\/doi.org\/10.3390\/encyclopedia3010003","relation":{},"ISSN":["2673-8392"],"issn-type":[{"value":"2673-8392","type":"electronic"}],"subject":[],"published":{"date-parts":[[2022,12,30]]}}}