{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,10,30]],"date-time":"2025-10-30T07:16:43Z","timestamp":1761808603129,"version":"build-2065373602"},"reference-count":54,"publisher":"MDPI AG","issue":"2","license":[{"start":{"date-parts":[[2023,6,16]],"date-time":"2023-06-16T00:00:00Z","timestamp":1686873600000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/creativecommons.org\/licenses\/by\/4.0\/"}],"funder":[{"DOI":"10.13039\/501100001871","name":"Funda\u00e7\u00e3o para a Ci\u00eancia e Tecnologia","doi-asserted-by":"publisher","award":["UIDB\/00319\/2020"],"award-info":[{"award-number":["UIDB\/00319\/2020"]}],"id":[{"id":"10.13039\/501100001871","id-type":"DOI","asserted-by":"publisher"}]}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Logistics"],"abstract":"<jats:p>Background: Nowadays, as a result of globalization, markets are more competitive, and customers are more demanding. To respond to these challenges, organizations must develop mechanisms for continuous improvement in order to eliminate waste and increase the efficiency and effectiveness of processes. Thus, the present study carried out at an industrial unit responsible for the customization of cork stoppers for wines had as its main objectives to identify and eliminate or at least reduce waste; improve production and internal logistics flows; balance workloads; improve productivity; reduce lead time; motivate employees and promote the spirit of continuous improvement. Methods: The action-research methodology was used, whereby several cycles of data recovery and analysis, identification and implementation of opportunities for improvement, assessment and standardization were carried out. Therefore, the Total Flow Management (TFM) model was implemented, and several methods and tools were used, such as Value Stream Mapping (VSM), work measurement and 5S\u2019s. Results: Several wastes and overloads were identified, and some actions were implemented, such as workload balancing, layout changes, implementation of visual management and supermarkets. That said, it was possible to reduce lead time by 4 days, improve productivity from 26.63 ML (a thousand cork stoppers)\/h to 35.75 ML\/h, and promote flexibility. In addition, employees were motivated, and a culture of continuous improvement was fostered. Conclusions: This project demonstrated that it is possible to implement improvement actions, with good results, without high investments, as well as motivating employees and taking advantage of their best capabilities. Additionally, it was demonstrated that the use of TFM can be very useful in continuous improvement, with evident improvements in production and internal logistics flows. So, this project demonstrated the practical implementation of TFM regarding basic reliability, production and internal logistics flow, and the simultaneous use of several methods and tools to implement continuous improvement. Thus, significant improvements were possible on the factory floor, as well as improving employee motivation their personal development and encouraging the focus on continuous improvement. Therefore, it responds to the gap identified in the literature.<\/jats:p>","DOI":"10.3390\/logistics7020034","type":"journal-article","created":{"date-parts":[[2023,6,16]],"date-time":"2023-06-16T02:02:20Z","timestamp":1686880940000},"page":"34","update-policy":"https:\/\/doi.org\/10.3390\/mdpi_crossmark_policy","source":"Crossref","is-referenced-by-count":4,"title":["Production and Internal Logistics Flow Improvements through the Application of Total Flow Management"],"prefix":"10.3390","volume":"7","author":[{"given":"Diana","family":"Filipe","sequence":"first","affiliation":[{"name":"Department of Economics, Management, Industrial Engineering and Tourism, Campus Universit\u00e1rio de Santiago, University of Aveiro, 3810-193 Aveiro, Portugal"}]},{"ORCID":"https:\/\/orcid.org\/0000-0003-4284-1628","authenticated-orcid":false,"given":"Carina","family":"Pimentel","sequence":"additional","affiliation":[{"name":"Algoritmi Research Unit, Production and Systems Department, School of Engineering, Campus de Azur\u00e9m, University of Minho, 4800-058 Guimar\u00e3es, Portugal"},{"name":"Research Unit on Governance, Competitiveness and Public Policies, Campus Universit\u00e1rio de Santiago, University of Aveiro, 3810-193 Aveiro, Portugal"}]}],"member":"1968","published-online":{"date-parts":[[2023,6,16]]},"reference":[{"key":"ref_1","doi-asserted-by":"crossref","first-page":"1869","DOI":"10.1007\/s00170-019-03990-x","article-title":"Extending Lean Frontiers: A Kaizen Case Study in an Italian MTO Manufacturing Company","volume":"104","author":"Rossini","year":"2019","journal-title":"Int. J. Adv. Manuf. Technol."},{"key":"ref_2","doi-asserted-by":"crossref","first-page":"831","DOI":"10.1108\/TQM-03-2019-0078","article-title":"The Applications of Kaizen Methods in Project Settings: Applied Study in Jordan","volume":"31","author":"Arabeyyat","year":"2019","journal-title":"TQM J."},{"key":"ref_3","first-page":"143","article-title":"Lean-Kaizen Implementation: A Roadmap for Identifying Continuous Improvement Opportunities in Indian Small and Medium Sized Enterprise","volume":"16","author":"Kumar","year":"2018","journal-title":"J. Eng. Des. Technol."},{"key":"ref_4","doi-asserted-by":"crossref","first-page":"162","DOI":"10.1108\/TQM-11-2018-0165","article-title":"An Application of Value Stream Mapping in Auto-Ancillary Industry: A Case Study","volume":"32","author":"Jasti","year":"2020","journal-title":"TQM J."},{"key":"ref_5","doi-asserted-by":"crossref","first-page":"255","DOI":"10.1108\/TQM-07-2017-0085","article-title":"Kaizen, a Continuous Improvement Practice in Organizations: A Comparative Study in Companies from Mexico and Ecuador","volume":"30","year":"2018","journal-title":"TQM J."},{"key":"ref_6","doi-asserted-by":"crossref","first-page":"1049","DOI":"10.1108\/IJLSS-06-2017-0068","article-title":"Impact of Lean Practices on Organizational Sustainability through Green Supply Chain Management\u2014An Empirical Investigation","volume":"11","author":"Singh","year":"2020","journal-title":"Int. J. Lean Six Sigma"},{"key":"ref_7","doi-asserted-by":"crossref","first-page":"45","DOI":"10.1108\/IJPPM-09-2016-0197","article-title":"Combining Lean Tools Application in Kaizen: A Field Study on the Printing Industry","volume":"67","author":"Chan","year":"2018","journal-title":"Int. J. Product. Perform. Manag."},{"key":"ref_8","doi-asserted-by":"crossref","first-page":"1343","DOI":"10.1108\/IJPPM-07-2018-0282","article-title":"Kaizen Event Approach: A Case Study in the Packaging Industry","volume":"68","author":"Vo","year":"2019","journal-title":"Int. J. Product. Perform. Manag."},{"key":"ref_9","doi-asserted-by":"crossref","first-page":"1184","DOI":"10.1108\/MD-08-2017-0748","article-title":"Lean Production System Development through Leadership Practices","volume":"57","author":"Toledo","year":"2019","journal-title":"Manag. Decis."},{"key":"ref_10","doi-asserted-by":"crossref","first-page":"29","DOI":"10.1007\/s40844-017-0067-4","article-title":"Revisiting the Existing Notion of Continuous Improvement (Kaizen): Literature Review and Field Research of Toyota from a Perspective of Innovation","volume":"14","author":"Iwao","year":"2017","journal-title":"Evol. Inst. Econ. Rev."},{"key":"ref_11","first-page":"182","article-title":"An Application for Reduction of the Non-Value Activities by Kaizen Costing Method in the Kentau Transformer Plant","volume":"8","author":"Kelesbayev","year":"2020","journal-title":"Entrep. Sustain. Issues"},{"key":"ref_12","doi-asserted-by":"crossref","first-page":"1925","DOI":"10.1108\/BPMJ-02-2020-0075","article-title":"A Lean Proposal: Development of Value Stream Mapping for L\u2019Oreal\u2019s Artwork Process","volume":"26","author":"Ghosh","year":"2020","journal-title":"Bus. Process Manag. J."},{"doi-asserted-by":"crossref","unstructured":"Helmold, M. (2020). Lean Management and Kaizen; Management for Professionals, Springer International Publishing.","key":"ref_13","DOI":"10.1007\/978-3-030-46981-8"},{"key":"ref_14","doi-asserted-by":"crossref","first-page":"542","DOI":"10.1108\/IJLSS-05-2017-0048","article-title":"Application of Continuous Improvement Techniques to Improve Organization Performance: A Case Study","volume":"10","author":"Khan","year":"2019","journal-title":"Int. J. Lean Six Sigma"},{"key":"ref_15","doi-asserted-by":"crossref","first-page":"349","DOI":"10.1108\/IJLSS-12-2014-0042","article-title":"Lean Initiative Practice for Supplier Developments in Philippines","volume":"6","author":"Kim","year":"2015","journal-title":"Int. J. Lean Six Sigma"},{"key":"ref_16","doi-asserted-by":"crossref","first-page":"233","DOI":"10.1016\/j.ijinfomgt.2006.12.001","article-title":"Lean Information Management: Understanding and Eliminating Waste","volume":"27","author":"Hicks","year":"2007","journal-title":"Int. J. Inf. Manag."},{"key":"ref_17","doi-asserted-by":"crossref","first-page":"718","DOI":"10.1016\/j.procir.2020.03.046","article-title":"Process Mapping in Industry\u2014The Self-Centred Phenomenon and How It Effects Continuous Improvements","volume":"93","author":"Johansson","year":"2020","journal-title":"Procedia CIRP"},{"key":"ref_18","doi-asserted-by":"crossref","first-page":"867","DOI":"10.1016\/j.procs.2018.10.113","article-title":"Implementation of Project Management and Lean Production Practices in a SME Portuguese Innovation Company","volume":"138","author":"Sousa","year":"2018","journal-title":"Procedia Comput. Sci."},{"unstructured":"Womack, J.P., and Jones, D.T. (2003). Lean Thinking: Banish Waste and Create Wealth in Your Corporation, Simon & Schuster. [1st ed.].","key":"ref_19"},{"key":"ref_20","doi-asserted-by":"crossref","first-page":"948","DOI":"10.1108\/IJPPM-08-2016-0154","article-title":"Evaluating Impact of 5S Implementation on Business Performance","volume":"66","author":"Randhawa","year":"2017","journal-title":"Int. J. Product. Perform. Manag."},{"doi-asserted-by":"crossref","unstructured":"Arromba, A.R., Teixeira, L., and Xambre, A.R. (2019, January 19\u201322). Information Flows Improvement in Production Planning Using Lean Concepts and BPMN an Exploratory Study in Industrial Context. Proceedings of the 2019 14th Iberian Conference on Information Systems and Technologies (CISTI), IEEE, Coimbra, Portugal.","key":"ref_21","DOI":"10.23919\/CISTI.2019.8760699"},{"key":"ref_22","doi-asserted-by":"crossref","first-page":"364","DOI":"10.1108\/JMTM-07-2015-0053","article-title":"5S Impact on Safety Climate of Manufacturing Workers","volume":"27","author":"Srinivasan","year":"2016","journal-title":"J. Manuf. Technol. Manag."},{"unstructured":"Coimbra, E.A. (2009). Total Flow Management: Achieving Excellence with Kaizen and Lean Supply Chains, Kaizen Institute. [1st ed.].","key":"ref_23"},{"unstructured":"Rother, M., and Shook, J. (1999). Learning to See: Value Stream Mapping to Add Value and Eliminate Muda (Lean Enterprise Institute), 1.2, Lean Enterprise Institute.","key":"ref_24"},{"key":"ref_25","doi-asserted-by":"crossref","first-page":"69","DOI":"10.1108\/IJPPM-10-2017-0248","article-title":"Inducing Brazilian Manufacturing SMEs Productivity with Lean Tools","volume":"68","author":"Dresch","year":"2019","journal-title":"Int. J. Product. Perform. Manag."},{"key":"ref_26","doi-asserted-by":"crossref","first-page":"1196","DOI":"10.1016\/j.promfg.2019.06.077","article-title":"Implementation of Lean Techniques for Sustainable Workflow Process in Indian Motor Manufacturing Unit","volume":"35","author":"Mahajan","year":"2019","journal-title":"Procedia Manuf."},{"unstructured":"Phd, R., and Linton, T. (2022). Flow: How the Best Supply Chains Thrive, Rotman-UTP Publishing. [1st ed.].","key":"ref_27"},{"doi-asserted-by":"crossref","unstructured":"Retamozo-Falcon, G., Silva, J., and Mauricio, D. (2019, January 12\u201314). Model for the Improvement of Processes Using Lean Techniques and BPM in SMEs. Proceedings of the 2019 IEEE 26th International Conference on Electronics, Electrical Engineering and Computing, INTERCON 2019, El Salvador, Peru.","key":"ref_28","DOI":"10.1109\/INTERCON.2019.8853806"},{"doi-asserted-by":"crossref","unstructured":"Berhe, H.H. (Int. J. Qual. Reliab. Manag., 2021). Application of Kaizen Philosophy for Enhancing Manufacturing Industries\u2019 Performance: Exploratory Study of Ethiopian Chemical Industries, Int. J. Qual. Reliab. Manag., ahead-of-print.","key":"ref_29","DOI":"10.1108\/IJQRM-09-2020-0328"},{"key":"ref_30","doi-asserted-by":"crossref","first-page":"850","DOI":"10.1108\/ECAM-10-2018-0455","article-title":"Research on Production Process Optimization of Precast Concrete Component Factory Based on Value Stream Mapping","volume":"27","author":"Wang","year":"2019","journal-title":"Eng. Constr. Archit. Manag."},{"key":"ref_31","doi-asserted-by":"crossref","first-page":"73","DOI":"10.1108\/IJLSS-08-2013-0047","article-title":"An Application of 5S Concept to Organize the Workplace at a Scientific Instruments Manufacturing Company","volume":"6","author":"Gupta","year":"2015","journal-title":"Int. J. Lean Six Sigma"},{"key":"ref_32","doi-asserted-by":"crossref","first-page":"419","DOI":"10.1108\/JQME-09-2013-0062","article-title":"The Use of 5-WHYs Technique to Eliminate OEE\u2019s Speed Loss in a Manufacturing Firm","volume":"21","author":"Benjamin","year":"2015","journal-title":"J. Qual. Maint. Eng."},{"key":"ref_33","doi-asserted-by":"crossref","first-page":"171","DOI":"10.1108\/IJLSS-06-2018-0060","article-title":"Application of Lean Manufacturing in Automotive Manufacturing Unit","volume":"11","author":"Singh","year":"2020","journal-title":"Int. J. Lean Six Sigma"},{"unstructured":"de Alves, D. (2020). Dimensionamento e Otimiza\u00e7\u00e3o de Um Fluxo Produtivo Na Ind\u00fastria Corticeira. [Mater\u2019s Thesis, Universidade de Aveiro]. Available online: http:\/\/hdl.handle.net\/10773\/28996.","key":"ref_34"},{"unstructured":"Amorim, S.O.F. (2019). Conce\u00e7\u00e3o e Implementa\u00e7\u00e3o de Fluxo de Material e Informa\u00e7\u00e3o Numa Nova \u00c1rea de Produ\u00e7\u00e3o de Uma Ind\u00fastria de Corti\u00e7a. [Mater\u2019s Thesis, Universidade de Aveiro]. Available online: http:\/\/hdl.handle.net\/10773\/27020.","key":"ref_35"},{"unstructured":"Canastro, D.F.O. (2019). Melhorias No Fluxo de Material de Uma Sec\u00e7\u00e3o de Produ\u00e7\u00e3o Com o Modelo TFM. [Mater\u2019s Thesis, Universidade de Aveiro]. Available online: http:\/\/hdl.handle.net\/10773\/27937.","key":"ref_36"},{"unstructured":"Coelho, A.I.M.B. (2017). Total Flow Management: Aplicabilidade a Uma Empresa Do Setor Metalomec\u00e2nico. [Mater\u2019s Thesis, Faculdade de Ci\u00eancias e Tecnologia da Universidade de Coimbra]. Available online: http:\/\/hdl.handle.net\/10316\/82868.","key":"ref_37"},{"unstructured":"de Almeida, S.R.S. (2016). Total Flow Management Aplicado a Uma Sec\u00e7\u00e3o de Produ\u00e7\u00e3o. [Mater\u2019s Thesis, Universidade de Aveiro]. Available online: http:\/\/hdl.handle.net\/10773\/22654.","key":"ref_38"},{"unstructured":"da Silva, T.A.P. (2016). Melhoria Do Sistema Produtivo de Escadotes Da FUTE\u2014F\u00e1brica de Utilidade de Tubos, SA. [Mater\u2019s Thesis, Instituto Superior de Engenharia do Porto]. Available online: http:\/\/hdl.handle.net\/10400.22\/8421.","key":"ref_39"},{"unstructured":"Marques, L.R.B. (2018). Redu\u00e7\u00e3o Do Invent\u00e1rio No Bordo de Linha: Sistema Puxado Para Vernizes Numa Ind\u00fastria de Embalagens. [Mater\u2019s Thesis, Universidade de Aveiro]. Available online: http:\/\/hdl.handle.net\/10773\/24578.","key":"ref_40"},{"key":"ref_41","doi-asserted-by":"crossref","first-page":"101288","DOI":"10.1016\/j.jocs.2020.101288","article-title":"An Ordered-Fuzzy-Numbers-Driven Approach to the Milk-Run Routing and Scheduling Problem","volume":"49","author":"Bocewicz","year":"2021","journal-title":"J. Comput. Sci."},{"unstructured":"Stevenson, W.J. (2018). Operations Management, McGraw-Hill Education. [13th ed.].","key":"ref_42"},{"key":"ref_43","doi-asserted-by":"crossref","first-page":"103089","DOI":"10.1016\/j.tre.2023.103089","article-title":"An Optimization-Based Methodology Equipped with Lean Tools to Strengthen Medical Supply Chain Resilience during a Pandemic: A Case Study from Turkey","volume":"173","author":"Yeni","year":"2023","journal-title":"Transp. Res. Part E Logist. Transp. Rev."},{"key":"ref_44","doi-asserted-by":"crossref","first-page":"6","DOI":"10.1108\/01443579510104466","article-title":"Action Research: A New Paradigm for Research in Production and Operations Management","volume":"15","author":"Westbrook","year":"1995","journal-title":"Int. J. Oper. Prod. Manag."},{"key":"ref_45","doi-asserted-by":"crossref","first-page":"220","DOI":"10.1108\/01443570210417515","article-title":"Action Research for Operations Management","volume":"22","author":"Coughlan","year":"2002","journal-title":"Int. J. Oper. Prod. Manag."},{"key":"ref_46","doi-asserted-by":"crossref","first-page":"131","DOI":"10.1108\/00400910310470993","article-title":"Action Research: An Approach to Student Work Based Learning","volume":"45","author":"Rowley","year":"2003","journal-title":"Educ. Train."},{"unstructured":"Karlsson, C. (2009). Research Methods for Operations Management, Routledge.","key":"ref_47"},{"unstructured":"Castro, S., and Teixeira, L. (2020). Bpmn and Lean Contributions for the Iso9001 Implementation: A Case Study within the Plastics Industry. Proc. Int. Conf. Ind. Eng. Oper. Manag., 1228\u20131237.","key":"ref_48"},{"unstructured":"Liker, J.K., and Meier, D. (2005). The Toyota Way Fieldbook: A Pratical Guide for Implementing Toyota\u2019s 4Ps, McGraw-Hill Education. [1st ed.].","key":"ref_49"},{"doi-asserted-by":"crossref","unstructured":"Bhasin, S. (2015). Lean Management beyond Manufacturing: A Holistic Approach, Springer. [1st ed.].","key":"ref_50","DOI":"10.1007\/978-3-319-17410-5"},{"key":"ref_51","doi-asserted-by":"crossref","first-page":"22","DOI":"10.1108\/AA-05-2014-035","article-title":"A Changeover Time Reduction through an Integration of Lean Practices: A Case Study from Pharmaceutical Sector","volume":"35","author":"Bevilacqua","year":"2015","journal-title":"Assem. Autom."},{"key":"ref_52","doi-asserted-by":"crossref","first-page":"678","DOI":"10.1016\/j.jmir.2020.08.014","article-title":"Improving Patient Flow in Diagnostic Imaging: A Case Report","volume":"51","author":"Jessome","year":"2020","journal-title":"J. Med. Imaging Radiat. Sci."},{"key":"ref_53","doi-asserted-by":"crossref","first-page":"604","DOI":"10.1108\/17410381111134464","article-title":"An Investigation of Toyota\u2019s Social-Technical Systems in Production Leveling","volume":"22","author":"Marksberry","year":"2011","journal-title":"J. Manuf. Technol. Manag."},{"key":"ref_54","doi-asserted-by":"crossref","first-page":"754","DOI":"10.1108\/IJPPM-06-2017-0149","article-title":"An Investigation into Manufacturing Performance Achievements Accrued by Indian Manufacturing Organization through Strategic 5S Practices","volume":"67","author":"Randhawa","year":"2018","journal-title":"Int. J. Product. Perform. Manag."}],"container-title":["Logistics"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/www.mdpi.com\/2305-6290\/7\/2\/34\/pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,10,10]],"date-time":"2025-10-10T19:56:13Z","timestamp":1760126173000},"score":1,"resource":{"primary":{"URL":"https:\/\/www.mdpi.com\/2305-6290\/7\/2\/34"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2023,6,16]]},"references-count":54,"journal-issue":{"issue":"2","published-online":{"date-parts":[[2023,6]]}},"alternative-id":["logistics7020034"],"URL":"https:\/\/doi.org\/10.3390\/logistics7020034","relation":{},"ISSN":["2305-6290"],"issn-type":[{"type":"electronic","value":"2305-6290"}],"subject":[],"published":{"date-parts":[[2023,6,16]]}}}