{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,4,14]],"date-time":"2026-04-14T03:52:59Z","timestamp":1776138779875,"version":"3.50.1"},"reference-count":59,"publisher":"Vilnius Gediminas Technical University","issue":"8","funder":[{"name":"J. G\u00f3mez-Cerezo Foundation"},{"name":"Spanish Ministry of Infrastructure","award":["2004-36"],"award-info":[{"award-number":["2004-36"]}]}],"content-domain":{"domain":["journals.vgtu.lt"],"crossmark-restriction":true},"short-container-title":[],"abstract":"<jats:p>Building life cycle is a process which covers not only the construction phase but also the feasibility, the design and the operation phases. Identifying the owner\u2019s needs in all phases of this process is of paramount importance for achieving satisfactory results for the building project. Additionally, the owner\u2019s needs should be fulfilled by the work scope of every stakeholder involved in the project. Nevertheless, these needs are not always adequately considered in building projects. Thus, the purpose of the research reported in this paper has been to develop a model that allows for the identification of the owner\u2019s needs in all phases of the building life cycle. The article presents a six level classification system for the information required in the project and a two-dimensional model that maps the life cycle and the logical actions to be undertaken in each phase. The model has been corroborated and improved by applying the Delphi technique to a panel of ten experts in two rounds. The practical use of the model is through the systematic application of a series of questionnaires built upon the information classification system for determining the owner\u2019s needs. The paper details the operation phase of the model as an illustrative example and a case study on a residential building project of twelve apartments in Spain.<\/jats:p>","DOI":"10.3846\/13923730.2015.1027257","type":"journal-article","created":{"date-parts":[[2015,11,24]],"date-time":"2015-11-24T04:10:49Z","timestamp":1448338249000},"page":"1046-1060","update-policy":"https:\/\/doi.org\/10.3846\/jcem_policy","source":"Crossref","is-referenced-by-count":17,"title":["A MODEL FOR IDENTIFYING OWNER\u2019S NEEDS IN THE BUILDING LIFE CYCLE"],"prefix":"10.3846","volume":"21","author":[{"given":"Ali","family":"Alshubbak","sequence":"first","affiliation":[{"name":"Universitat Polit\u00e8cnica de Val\u00e8ncia"}]},{"given":"Eugenio","family":"Pellicer","sequence":"additional","affiliation":[{"name":"Universitat Polit\u00e8cnica de Val\u00e8ncia"}]},{"given":"Joaqu\u00edn","family":"Catal\u00e1","sequence":"additional","affiliation":[{"name":"Universitat Polit\u00e8cnica de Val\u00e8ncia"}]},{"given":"Jos\u00e9 M. C.","family":"Teixeira","sequence":"additional","affiliation":[{"name":"Universidade do Minho"}]}],"member":"2209","published-online":{"date-parts":[[2015,11,23]]},"reference":[{"key":"CIT0001","doi-asserted-by":"publisher","DOI":"10.1108\/02656710310453791"},{"key":"CIT0002","volume-title":"Modelo de Identificaci\u00f3n de las Necesi- dades del Promotor en el Proceso Proyecto-Construcci\u00f3n: INPRO: PhD Thesis.","author":"Alshubbak A.","year":"2010"},{"key":"CIT0003","author":"Archibald R. D.","year":"2004","journal-title":"State of the art of project management."},{"key":"CIT0005","doi-asserted-by":"publisher","DOI":"10.2307\/3151295"},{"issue":"2","key":"CIT0006","first-page":"32","volume":"2","author":"Bj\u00f6rk B. C.","year":"1997","journal-title":"Elec- tronic Journal of Information Technology in Construction (ITcon"},{"key":"CIT0007","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0742-597X(2002)18:3(120)"},{"key":"CIT0008","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CO.1943-7862.0000292"},{"key":"CIT0009","doi-asserted-by":"crossref","unstructured":"Chudley, R.; Greeno, R. 2010.Building construction handbook.8thed. Oxford: Elsevier. 728 p.","DOI":"10.4324\/9780080963389"},{"key":"CIT0010","first-page":"360","volume-title":"Code of practice for project management for con- struction and development.","author":"CIOB","year":"2002","edition":"3"},{"key":"CIT0011","unstructured":"Cleland, I. 1999.Project management: Strategic design and im- plementation.New York: McGraw-Hill. 523 p."},{"key":"CIT0012","unstructured":"Cohen, L.; Manion, L.; Morrison, K. 2011.Research methods in education.London: Routledge. 784 p."},{"key":"CIT0013","doi-asserted-by":"publisher","DOI":"10.1080\/096132100418519"},{"key":"CIT0014","volume-title":"Masterformat\u2122 2004 edition numbers and titles.","author":"CSI","year":"2004"},{"key":"CIT0015","first-page":"648","author":"Eastman C.","year":"2008","journal-title":"BIM handbook: a guide to Building Information Modeling for owners, managers, designers, engineers, and contractors."},{"key":"CIT0018","doi-asserted-by":"publisher","DOI":"10.1016\/S0048-7333(00)00114-1"},{"key":"CIT0019","doi-asserted-by":"publisher","DOI":"10.1080\/01446199400000038"},{"key":"CIT0020","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CO.1943-7862.0000137"},{"key":"CIT0021","doi-asserted-by":"publisher","DOI":"10.1108\/eb021095"},{"key":"CIT0022","unstructured":"Hoyle, D. 2009.ISO 9000 quality systems handbook.6thed. Oxford: Elsevier. 824 p."},{"key":"CIT0023","doi-asserted-by":"publisher","DOI":"10.1007\/s10669-013-9440-y"},{"key":"CIT0024","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)1076-0431(1999)5:1(8)"},{"key":"CIT0025","doi-asserted-by":"publisher","DOI":"10.1108\/14637150010325462"},{"issue":"1","key":"CIT0026","first-page":"15","volume":"7","author":"Kamara J.","year":"2000","journal-title":"Engineering Con- struction and Architectural Management"},{"key":"CIT0027","doi-asserted-by":"publisher","DOI":"10.1680\/ccricp.31036"},{"key":"CIT0028","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(1997)123:4(419)"},{"key":"CIT0029","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(2000)126:2(158)"},{"key":"CIT0030","doi-asserted-by":"publisher","DOI":"10.1108\/02632770710742200"},{"key":"CIT0031","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2005.09.009"},{"issue":"6","key":"CIT0032","first-page":"81","volume":"43","author":"Levitt T.","year":"1965","journal-title":"Harvard Business Review"},{"key":"CIT0033","doi-asserted-by":"publisher","DOI":"10.1046\/j.1365-232X.2002.00268.x"},{"key":"CIT0034","doi-asserted-by":"publisher","DOI":"10.1590\/S1678-86212011000200003"},{"key":"CIT0035","unstructured":"Linstone, H. A.; Turoff, M. 1975.The Delphi method: Tech- niques and applications.London: Addison-Wesley. 620 p."},{"key":"CIT0064","unstructured":"Martino, J. 1972.Technological forecasting for decision making.New York: Elsevier. 462 p."},{"key":"CIT0036","doi-asserted-by":"publisher","DOI":"10.1680\/mop.16934"},{"key":"CIT0037","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijproman.2005.03.001"},{"key":"CIT0038","doi-asserted-by":"publisher","DOI":"10.1016\/j.im.2003.11.002"},{"key":"CIT0039","author":"OmniClass Committee","year":"2000","journal-title":"OmniClass"},{"issue":"4","key":"CIT0040","doi-asserted-by":"crossref","first-page":"233","DOI":"10.3846\/1648715X.2006.9637555","volume":"10","author":"Pellicer E.","year":"2006","journal-title":"International Journal of Strategic Property Management"},{"key":"CIT0041","unstructured":"Pellicer, E.; Yepes, V.; Teixeira, J. M.; Moura, H.; Catal\u00e1, J. 2014.Construction management.atOxford: Willey-Black- well. 330 p."},{"key":"CIT0042","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(2004)130:4(482)"},{"key":"CIT0044","unstructured":"RIBA. 1997.Uniclass: Unified classification for the construc- tion industry.London: Royal Institute of British Architects, London. 216 p."},{"key":"CIT0045","doi-asserted-by":"publisher","DOI":"10.1016\/S0169-2070(99)00018-7"},{"key":"CIT0046","doi-asserted-by":"publisher","DOI":"10.1080\/0144619042000201411"},{"issue":"1","key":"CIT0047","first-page":"22","volume":"10","author":"Smith J.","year":"2004","journal-title":"Journal of Management in Engineering"},{"key":"CIT0048","doi-asserted-by":"publisher","DOI":"10.1046\/j.1365-232X.2002.00278.x"},{"key":"CIT0049","author":"Sourani A.","year":"2014","journal-title":"International Journal of Construction Education and Research. Published online."},{"key":"CIT0050","doi-asserted-by":"publisher","DOI":"10.5539\/mas.v3n5p167"},{"key":"CIT0051","doi-asserted-by":"crossref","unstructured":"Teicholz, P. 2013.BIM for facility managers.Hoboken (NJ): Wiley. 352 p.","DOI":"10.1002\/9781119572633"},{"key":"CIT0052","doi-asserted-by":"publisher","DOI":"10.2307\/257550"},{"key":"CIT0053","unstructured":"Winch, G. M. 2002.Managing construction projects: an infor- mation processing approach.Oxford: Blackwell. 544 p."},{"key":"CIT0054","doi-asserted-by":"publisher","DOI":"10.1080\/09613210301995"},{"key":"CIT0055","doi-asserted-by":"publisher","DOI":"10.1080\/09613210500491472"},{"key":"CIT0056","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CO.1943-7862.0000879"},{"key":"CIT0057","doi-asserted-by":"publisher","DOI":"10.3846\/13923730.2012.657340"},{"key":"CIT0058","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)ME.1943-5479.0000285"},{"key":"CIT0059","doi-asserted-by":"publisher","DOI":"10.1108\/02632771311307098"},{"key":"CIT0060","doi-asserted-by":"publisher","DOI":"10.1108\/02632771011083694"},{"key":"CIT0062","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)ME.1943-5479.0000011"},{"key":"CIT0063","doi-asserted-by":"publisher","DOI":"10.1080\/13921525.2001.10531776"}],"container-title":["Journal of Civil Engineering and Management"],"original-title":[],"link":[{"URL":"https:\/\/journals.vilniustech.lt\/index.php\/JCEM\/article\/view\/2611\/2125","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,4,22]],"date-time":"2022-04-22T13:13:27Z","timestamp":1650633207000},"score":1,"resource":{"primary":{"URL":"https:\/\/journals.vilniustech.lt\/index.php\/JCEM\/article\/view\/2611"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2015,11,23]]},"references-count":59,"journal-issue":{"issue":"8","published-online":{"date-parts":[[2015,11,23]]}},"URL":"https:\/\/doi.org\/10.3846\/13923730.2015.1027257","relation":{},"ISSN":["1392-3730","1822-3605"],"issn-type":[{"value":"1392-3730","type":"print"},{"value":"1822-3605","type":"electronic"}],"subject":[],"published":{"date-parts":[[2015,11,23]]},"assertion":[{"value":"Vilnius Gediminas Technical University","name":"this_article_is_maintained_by","label":"This article is maintained by"},{"value":"Research Article","name":"content_type","label":"Content Type"},{"value":"Yes","name":"crosschecked","label":"CrossChecked"},{"value":"Yes","order":0,"name":"peer_reviewed","label":"Peer Reviewed","group":{"name":"peer_review","label":"Peer Review"}},{"value":"Double blind","order":1,"name":"review_process","label":"Review Process","group":{"name":"peer_review","label":"Peer Review"}},{"value":"2014-06-30","order":0,"name":"received","label":"Received","group":{"name":"publication_history","label":"Publication History"}},{"value":"2014-10-21","order":1,"name":"accepted","label":"Accepted","group":{"name":"publication_history","label":"Publication History"}},{"value":"2015-11-23","order":2,"name":"published","label":"Published","group":{"name":"publication_history","label":"Publication History"}},{"value":"@ 2015 Vilnius Gediminas Technical University Press","order":0,"name":"copyright","label":"Copyright","group":{"name":"copyright_and_licensing","label":"Copyright and Licensing"}}]}}