{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,8,31]],"date-time":"2024-08-31T06:29:54Z","timestamp":1725085794548},"reference-count":6,"publisher":"IGI Global","issue":"1","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2013,1,1]]},"abstract":"<p>The authors are collaborating with a manufacturer of custom built steel frame modular units which are then transported for rapid erection onsite (volumetric building system). As part of its strategy to develop modular housing, Enemetric, is taking the opportunity to develop intelligent buildings, integrating a wide range of sensors and control systems for optimising energy efficiency and directly monitoring structural health. Enemetric have recently been embracing Building Information Modeling (BIM) to improve workflow, in particular cost estimation and to simplify computer aided manufacture (CAM). By leveraging the existing data generated during the design phases, and projecting it to all other aspects of construction management, less errors are made and productivity is significantly increased. Enemetric may work on several buildings at once, and scheduling and priorities become especially important for effective workflow, and implementing Enterprise Resource Planning (ERP). The parametric nature of BIM is also very useful for improving building management, whereby real-time data collection can be logically associated with individual components of the BIM stored in a local Building Management System performing structural health monitoring and environmental monitoring and control. BIM reuse can be further employed in building simulation tools, to apply simulation assisted control strategies, in order to reduce energy consumption, and increase occupant comfort.<\/p>","DOI":"10.4018\/ij3dim.2013010103","type":"journal-article","created":{"date-parts":[[2013,6,20]],"date-time":"2013-06-20T16:04:55Z","timestamp":1371744295000},"page":"17-28","source":"Crossref","is-referenced-by-count":3,"title":["BIM Integrated Workflow Management and Monitoring System for Modular Buildings"],"prefix":"10.4018","volume":"2","author":[{"given":"Amar","family":"Seeam","sequence":"first","affiliation":[{"name":"School of Engineering, The University of Edinburgh, Edinburgh, Scotland, UK & Enemetric Ltd., Lanarkshire, Scotland, UK"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Tianxin","family":"Zheng","sequence":"additional","affiliation":[{"name":"School of Engineering, The University of Edinburgh, Edinburgh, Scotland, UK & Enemetric Ltd., Lanarkshire, Scotland, UK"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Yong","family":"Lu","sequence":"additional","affiliation":[{"name":"School of Engineering, The University of Edinburgh, Edinburgh, Scotland, UK"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Asif","family":"Usmani","sequence":"additional","affiliation":[{"name":"School of Engineering, The University of Edinburgh, Edinburgh, Scotland, UK"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"David","family":"Laurenson","sequence":"additional","affiliation":[{"name":"School of Engineering, The University of Edinburgh, Edinburgh, Scotland, UK"}],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"2432","reference":[{"key":"ij3dim.2013010103-0","doi-asserted-by":"crossref","unstructured":"Alahmad, M., Nader, W., Neal, J., Shi, J., Berryman, C., Cho, Y., et al. (2011) Real time power monitoring & integration with BIM. In Proceedings of the 36th Annual Conference on IEEE Industrial Electronics Society (IECON 2010) (pp. 2454-2458).","DOI":"10.1109\/IECON.2010.5675385"},{"key":"ij3dim.2013010103-1","unstructured":"Dong, B., Lam, K. P., Huang, Y. C., & Dobbs, G. M. (2007). A comparative study of the IFC and gbXML informational infrastructures for data exchange in computational design support environments. In Proceedings of Building Simulation 2007."},{"key":"ij3dim.2013010103-2","unstructured":"Ghauri, S., Hand, J., Johnstone, C., Kim, J. M., Kokogiannakis, G., Tuohy, P., et al. (2009). Adoption of dynamic simulation for an energy performance rating tool for Korean residential buildings: EDEM-Samsung. In Proceedings of Building Simulation 2009."},{"key":"ij3dim.2013010103-3","doi-asserted-by":"crossref","unstructured":"Hwang, S., & Liu, L. Y. (2010). BIM for integration of automated real-time project control systems. In Proceedings of the 2010 Construction Research Congress.","DOI":"10.1061\/41109(373)51"},{"key":"ij3dim.2013010103-4","unstructured":"Laine, T., Hanninen, R., & Karola, A. (2007). Benefits of BIM in the thermal performance management. In Proceedings of Building Simulation 2007."},{"key":"ij3dim.2013010103-5","doi-asserted-by":"publisher","DOI":"10.4203\/ccp.91.94"}],"container-title":["International Journal of 3-D Information Modeling"],"original-title":[],"language":"ng","link":[{"URL":"https:\/\/www.igi-global.com\/viewtitle.aspx?TitleId=77814","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,6,2]],"date-time":"2022-06-02T02:55:13Z","timestamp":1654138513000},"score":1,"resource":{"primary":{"URL":"https:\/\/services.igi-global.com\/resolvedoi\/resolve.aspx?doi=10.4018\/ij3dim.2013010103"}},"subtitle":[""],"short-title":[],"issued":{"date-parts":[[2013,1,1]]},"references-count":6,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2013,1]]}},"URL":"https:\/\/doi.org\/10.4018\/ij3dim.2013010103","relation":{},"ISSN":["2156-1710","2156-1702"],"issn-type":[{"value":"2156-1710","type":"print"},{"value":"2156-1702","type":"electronic"}],"subject":[],"published":{"date-parts":[[2013,1,1]]}}}