{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,6,8]],"date-time":"2024-06-08T04:36:58Z","timestamp":1717821418531},"reference-count":47,"publisher":"IGI Global","issue":"3","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2013,7,1]]},"abstract":"<p>Facility Management (FM) is well known for its interdisciplinary knowledge and along with the growing number of green buildings and low-carbon buildings, the FM system become increasingly complex. Many practitioners consider Building Information Modeling (BIM) as the most important technology to bring about improvements. The purpose of this paper is to develop a BIM-enabled FM system which integrates FM, BIM and building management system to improve information sharing and monitoring, FM system control, and equipment management. A case study is implemented to validate the feasibility of the BIM-enabled FM system. Four functionalities are demonstrated in detail: Equipment Information Monitoring (EIM), Dynamic Data Display and Warning (D3W), Energy-Saving Analysis (ESA), and Intelligent Fire Escape Route (IFER). The results show that BIM-enabled FM system facilitates the FM more accurate, timely, safe and efficient.<\/p>","DOI":"10.4018\/ij3dim.2013070102","type":"journal-article","created":{"date-parts":[[2014,1,20]],"date-time":"2014-01-20T16:57:40Z","timestamp":1390237060000},"page":"16-33","source":"Crossref","is-referenced-by-count":6,"title":["The Application of BIM-Enabled Facility Management System in Complex Building"],"prefix":"10.4018","volume":"2","author":[{"given":"Jun","family":"Wang","sequence":"first","affiliation":[{"name":"School of Construction Management and Real Estate, Chongqing University, Chongqing, China & Australasian Joint Research Centre for Building Information Modeling, School of Built Environment, Curtin University, Perth, WA, Australia"}]},{"given":"Shirong","family":"Li","sequence":"additional","affiliation":[{"name":"School of Construction Management and Real Estate, Chongqing University, Chongqing, China"}]},{"given":"Xiangyu","family":"Wang","sequence":"additional","affiliation":[{"name":"Australasian Joint Research Centre for Building Information Modeling, School of Built Environment, Curtin University, Perth, WA, Australia"}]},{"given":"Chao","family":"Mao","sequence":"additional","affiliation":[{"name":"School of Construction Management and Real Estate, Chongqing University, Chongqing, China"}]},{"given":"Jun","family":"Guo","sequence":"additional","affiliation":[{"name":"China Construction Design International (CCDI) Company, Shanghai, China"}]}],"member":"2432","reference":[{"key":"ij3dim.2013070102-0","unstructured":"Akcamete, A., Akinci, B., & Garrett, J. (2010). Potential utilization of building information models for planning maintenance activities. In Proc., Proceddings of the International Conference on Computing in Civil and Building Engineering."},{"key":"ij3dim.2013070102-1","doi-asserted-by":"crossref","unstructured":"Arayici, Y., Onyenobi, T., & Egbu, C. (2012). Building information modelling (BIM) for facilities management (FM): The MediaCity case study approach. International Journal of 3D Information Modelling, 1(1), 55-73.","DOI":"10.4018\/ij3dim.2012010104"},{"key":"ij3dim.2013070102-2","doi-asserted-by":"publisher","DOI":"10.1186\/2213-7459-1-3"},{"key":"ij3dim.2013070102-3","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CO.1943-7862.0000433"},{"key":"ij3dim.2013070102-4","doi-asserted-by":"publisher","DOI":"10.1108\/14725960610673742"},{"key":"ij3dim.2013070102-5","doi-asserted-by":"publisher","DOI":"10.1186\/2213-7459-1-5"},{"key":"ij3dim.2013070102-6","doi-asserted-by":"crossref","unstructured":"Cheng Shuang Sun, Q. C. (2012). BIM-based real-time monitoring of the equipment maintenance of property. Applied Mechanics and Materials, 226-228(Vibration, Structural Engineering and Measurement II), 2217-2221.","DOI":"10.4028\/www.scientific.net\/AMM.226-228.2217"},{"key":"ij3dim.2013070102-7","doi-asserted-by":"publisher","DOI":"10.1080\/15578771.2011.647249"},{"key":"ij3dim.2013070102-8","author":"D.Cotts","year":"2009","journal-title":"The facility management handbook"},{"key":"ij3dim.2013070102-9","doi-asserted-by":"publisher","DOI":"10.1108\/17410400710757123"},{"key":"ij3dim.2013070102-10","doi-asserted-by":"publisher","DOI":"10.1186\/2213-7459-1-1"},{"key":"ij3dim.2013070102-11","unstructured":"Eastman, C., Teicholz, P., Sacks, R., & Liston, K. (2011). BIM handbook: A guide to building information modeling for owners, managers, designers, engineers and contractors. Wiley. com."},{"key":"ij3dim.2013070102-12","doi-asserted-by":"publisher","DOI":"10.1016\/j.aei.2006.09.004"},{"key":"ij3dim.2013070102-13","doi-asserted-by":"crossref","unstructured":"Golparvar-Fard, M., & Ham, Y. (2013). Automated diagnostics and visualization of potential energy performance problems in existing buildings using EPAR-energy performance augmented reality-models. Journal of Computing in Civil Engineering, 0.","DOI":"10.1061\/(ASCE)CP.1943-5487.0000311"},{"issue":"10","key":"ij3dim.2013070102-14","first-page":"1355","article-title":"Exploring the benefits of augmented reality documentation for maintenance and repair. Visualization and Computer Graphics","volume":"17","author":"S.Henderson","year":"2011","journal-title":"IEEE Transactions on"},{"key":"ij3dim.2013070102-15","doi-asserted-by":"crossref","unstructured":"Hou, L., & Wang, X. (2011). Experimental framework for evaluating cognitive workload of using AR system for general assembly task. In Proceedings of the 28th International Symposium on Automation and Robotics in Construction.","DOI":"10.22260\/ISARC2011\/0117"},{"key":"ij3dim.2013070102-16","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CP.1943-5487.0000184"},{"key":"ij3dim.2013070102-17","doi-asserted-by":"crossref","unstructured":"Hou, L., Wang, X., & Truijens, M. (2013). Using augmented reality to facilitate piping assembly: An experiment-based evaluation. Journal of Computing in Civil Engineering, 0.","DOI":"10.1061\/(ASCE)CP.1943-5487.0000184"},{"key":"ij3dim.2013070102-18","unstructured":"IFMA. (n.d.). Retrieved from http:\/\/www.ifma.org"},{"key":"ij3dim.2013070102-19","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2012.09.002"},{"key":"ij3dim.2013070102-20","doi-asserted-by":"publisher","DOI":"10.1108\/14725960810908163"},{"key":"ij3dim.2013070102-21","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2010.11.004"},{"key":"ij3dim.2013070102-22","doi-asserted-by":"publisher","DOI":"10.1108\/02632770510578539"},{"key":"ij3dim.2013070102-23","doi-asserted-by":"publisher","DOI":"10.1108\/02632770510588637"},{"key":"ij3dim.2013070102-24","doi-asserted-by":"crossref","unstructured":"Liu, R., & Issa, R. R. A. (2012). Automatically updating maintenance information from a BIM database. Computing in Civil Engineering, 373-380.","DOI":"10.1061\/9780784412343.0047"},{"key":"ij3dim.2013070102-25","doi-asserted-by":"publisher","DOI":"10.1108\/02632770910980727"},{"key":"ij3dim.2013070102-26","doi-asserted-by":"publisher","DOI":"10.1108\/02632771111157141"},{"key":"ij3dim.2013070102-27","doi-asserted-by":"publisher","DOI":"10.1186\/2213-7459-1-7"},{"key":"ij3dim.2013070102-28","unstructured":"Motamedi, A, H. A. (2009). Lifecycle management of facilities components using radio frequency identification and building information model. ITcon, 14(Special Issue \u201cNext Generation Construction IT: Technology Foresight, Future Studies, Roadmapping, and Scenario Planning\u201d), 238-262."},{"key":"ij3dim.2013070102-29","doi-asserted-by":"publisher","DOI":"10.1108\/02632770510578485"},{"key":"ij3dim.2013070102-30","doi-asserted-by":"publisher","DOI":"10.1108\/14725960810908136"},{"key":"ij3dim.2013070102-31","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CP.1943-5487.0000067"},{"key":"ij3dim.2013070102-32","doi-asserted-by":"publisher","DOI":"10.1108\/02632770510627534"},{"key":"ij3dim.2013070102-33","unstructured":"Russell, D., Cho, Y., & Cylwik, E. (n.d.). Learning opportunities and career implications of experience with building information modeling\/virtual design and construction. Practice Periodical on Structural Design and Construction, 0."},{"key":"ij3dim.2013070102-34","doi-asserted-by":"publisher","DOI":"10.1108\/02632770710822599"},{"key":"ij3dim.2013070102-35","doi-asserted-by":"publisher","DOI":"10.1016\/j.aei.2009.09.001"},{"key":"ij3dim.2013070102-36","doi-asserted-by":"publisher","DOI":"10.1186\/2213-7459-1-4"},{"key":"ij3dim.2013070102-37","unstructured":"Taneja, S., Akcamete, A., Akinci, B., Garrett, J., Soibelman, L., & East, E. W. (2010). Analysis of three indoor localization technologies to support facility management field activities. In Proceedings of the International Conference on Computing in Civil and Building Engineering, Nottingham, UK."},{"key":"ij3dim.2013070102-38","doi-asserted-by":"crossref","unstructured":"Teicholz, P. (2013). BIM for facility managers. Wiley. com.","DOI":"10.1002\/9781119572633"},{"key":"ij3dim.2013070102-39","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0887-3801(2006)20:6(437)"},{"key":"ij3dim.2013070102-40","doi-asserted-by":"publisher","DOI":"10.1186\/2213-7459-1-8"},{"key":"ij3dim.2013070102-41","doi-asserted-by":"publisher","DOI":"10.1155\/2013\/189105"},{"key":"ij3dim.2013070102-42","doi-asserted-by":"crossref","first-page":"237","DOI":"10.1061\/9780784412343.0030","article-title":"BIM-enabled building commissioning and handover.","volume":"2012","author":"W.Wu","year":"2012","journal-title":"Computing in Civil Engineering"},{"key":"ij3dim.2013070102-43","doi-asserted-by":"crossref","unstructured":"Yongbo Shao, S. H., Luo, Y., Xing, J., & Liu, Z. (2012). Research on the application of BIM in the operation stage of green building. Applied Mechanics and Materials, 174-177(Advanced Building Materials and Sustainable Architecture): 2111-2114.","DOI":"10.4028\/www.scientific.net\/AMM.174-177.2111"},{"key":"ij3dim.2013070102-44","author":"N.Young","year":"2009","journal-title":"The business value of BIM-getting building information modeling to the bottom line"},{"key":"ij3dim.2013070102-45","doi-asserted-by":"publisher","DOI":"10.1016\/S0926-5805(99)00002-3"},{"key":"ij3dim.2013070102-46","doi-asserted-by":"publisher","DOI":"10.1186\/2213-7459-1-10"}],"container-title":["International Journal of 3-D Information Modeling"],"original-title":[],"language":"ng","link":[{"URL":"https:\/\/www.igi-global.com\/viewtitle.aspx?TitleId=99615","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,6,1]],"date-time":"2022-06-01T22:00:17Z","timestamp":1654120817000},"score":1,"resource":{"primary":{"URL":"https:\/\/services.igi-global.com\/resolvedoi\/resolve.aspx?doi=10.4018\/ij3dim.2013070102"}},"subtitle":[""],"short-title":[],"issued":{"date-parts":[[2013,7,1]]},"references-count":47,"journal-issue":{"issue":"3","published-print":{"date-parts":[[2013,7]]}},"URL":"https:\/\/doi.org\/10.4018\/ij3dim.2013070102","relation":{},"ISSN":["2156-1710","2156-1702"],"issn-type":[{"value":"2156-1710","type":"print"},{"value":"2156-1702","type":"electronic"}],"subject":[],"published":{"date-parts":[[2013,7,1]]}}}