{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,10,15]],"date-time":"2025-10-15T00:38:47Z","timestamp":1760488727793,"version":"3.41.0"},"reference-count":52,"publisher":"IGI Global","issue":"3","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2016,7,1]]},"abstract":"<p>This paper presents a case study of BIM implementation for Design for Manufacture and Assembly (DfMA). The project is a Knowledge Transfer Partnership (KTP) between the University of Salford and Links FF&amp;E, a design, manufacture and fit-out SME based in the UK. The project aims to implement BIM as a catalyst for a Lean transformation, streamlining process and operations. Initially, organisational process are reviewed, which is followed by implementing appropriate technologies to enable subsequent people and process transformation. The 30 month project is organized in 6 key stages. This paper presents findings from the first four stages that have been completed to date of 1. Establishing best practice knowledge in BIM; 2. Conducting a review and analysis of the organisation's current situation, 3. Developing a BIM-based collaborative strategy, and the fourth, which is currently progressing, 4. Pilot implementation of BIM collaborative strategy for DfMA. The remaining stages will conduct a project evaluation, before finally implementing an Enterprise Resource Planning (ERP) system.<\/p>","DOI":"10.4018\/ij3dim.2016070103","type":"journal-article","created":{"date-parts":[[2017,2,7]],"date-time":"2017-02-07T16:56:21Z","timestamp":1486486581000},"page":"31-46","source":"Crossref","is-referenced-by-count":12,"title":["Implementing BIM to Streamline a Design, Manufacture, and Fitting Workflow"],"prefix":"10.4018","volume":"5","author":[{"given":"Marina","family":"Machado","sequence":"first","affiliation":[{"name":"University of Salford, Salford, UK"}]},{"ORCID":"https:\/\/orcid.org\/0000-0002-3193-1620","authenticated-orcid":true,"given":"Jason","family":"Underwood","sequence":"additional","affiliation":[{"name":"School of the Built Environment, University of Salford, Salford, UK"}]},{"given":"Andrew","family":"Fleming","sequence":"additional","affiliation":[{"name":"University of Salford, Salford, UK"}]}],"member":"2432","reference":[{"key":"IJ3DIM.2016070103-0","doi-asserted-by":"publisher","DOI":"10.1108\/01443570710756974"},{"journal-title":"BIM implementation for an architectural practice","year":"2009","author":"Y.Arayici","key":"IJ3DIM.2016070103-1"},{"key":"IJ3DIM.2016070103-2","unstructured":"Arbulu, R., & Zabelle, T. (2006). Implementing Lean in construction: How to succeed. Paper presented at the Intl. Group for Lean Construction, Santiago, Chile."},{"key":"IJ3DIM.2016070103-3","unstructured":"Ariaratnam, S. T., & Rojas, E. M. (2009). Assessing the Environmental Impacts of Lean Supply System: A Case Study of Rebar Supply in High-Rise Condominium Construction Projects. Proceedings of theConstruction Research Congress 2009 (pp. 1009-1018). Reston, VA: American Society of Civil Engineers."},{"key":"IJ3DIM.2016070103-4","unstructured":"Ballard, G., Kim, Y. W., Jang, J. W., & Liu, M. (2007). Road Map for Lean Implementation at the Project Level. Construction Industry Institute, Bureau of Engineering Research, The University of Texas at Austin."},{"key":"IJ3DIM.2016070103-5","unstructured":"Bicheno, J., & Holweg, M. (Eds.), (2009). The Lean toolbox: the essential guide to Lean transformation (4th ed.). Buckingham: PICSIE."},{"key":"IJ3DIM.2016070103-6","unstructured":"Bildsten, L., & Guan, W. (2011). The Study of a Kitchen Assembly Process in Industrial Housing. Paper presented at theNordic Conference of Construction Economics and Organization, Copenhagen, Denmark."},{"key":"IJ3DIM.2016070103-7","doi-asserted-by":"crossref","unstructured":"Boothroyd, G., Dewhurst, P., & Knight, W. A. (2002). Product design for manufacture and assembly (2nd ed., rev. and expanded. ed.). New York: Marcel Dekker.","DOI":"10.1201\/9780824741587"},{"year":"2011","key":"IJ3DIM.2016070103-8"},{"key":"IJ3DIM.2016070103-9","doi-asserted-by":"publisher","DOI":"10.1177\/0266242694123005"},{"key":"IJ3DIM.2016070103-10","unstructured":"Construction, M. H. (2014). The Business Value of BIM for Construction in Major Global markets. Retrieved from https:\/\/synchroltd.com\/newsletters\/Business%20Value%20Of%20BIM%20In%20Global%20Markets%202014.pdf"},{"journal-title":"Application of lean manufacturing principles to construction","year":"2004","author":"J. E.Diekmann","key":"IJ3DIM.2016070103-11"},{"key":"IJ3DIM.2016070103-12","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0887-3801(2010)24:1(25)"},{"key":"IJ3DIM.2016070103-13","unstructured":"Eastman, C., Teicholz, P., Sacks, R., & Liston, K. (2011). BIM handbook: a guide to building information modeling for owners, managers designers, engineers, and contractors. Hoboken, New Jersey: John Wiley & Sons Inc."},{"journal-title":"Rethinking construction: the report of the Construction Task Force to the Deputy Prime Minister, John Prescott, on the scope for improving the quality and efficiency of UK construction","year":"1998","author":"J. L. S.Egan","key":"IJ3DIM.2016070103-14"},{"key":"IJ3DIM.2016070103-15","doi-asserted-by":"crossref","unstructured":"Fereday, S., & Potter, M. (2013). From lonely BIM to Design for Manufacture and Assembly (DfMA): a learning curve for one SME. The Structural Engineer, 91(11).","DOI":"10.56330\/BWMF4451"},{"key":"IJ3DIM.2016070103-16","unstructured":"French, W. L. (1999). Organization development: behavioral science interventions for organization improvement (C. H. Bell, Ed.) (6th ed.). Upper Saddle River, N.J.: Prentice Hall."},{"key":"IJ3DIM.2016070103-17","doi-asserted-by":"publisher","DOI":"10.1080\/014461996373304"},{"key":"IJ3DIM.2016070103-18","doi-asserted-by":"publisher","DOI":"10.1080\/09613210302000"},{"journal-title":"Business process change: a manager&#039;s guide to improving, redesigning, and automating processes. San Francisco, Calif.; London","year":"2003","author":"P.Harmon","key":"IJ3DIM.2016070103-19"},{"key":"IJ3DIM.2016070103-20","doi-asserted-by":"crossref","unstructured":"Harty, J. (2015). Getting to Grips with BIM A Guide for Small and Medium-Sized Architecture, Engineering and Construction Firms. In G. Paterson (Ed.), Getting to grips with BIM [electronic resource]. Taylor and Francis.","DOI":"10.4324\/9781315730721"},{"key":"IJ3DIM.2016070103-21","doi-asserted-by":"publisher","DOI":"10.1016\/S0166-4972(97)00102-8"},{"key":"IJ3DIM.2016070103-22","doi-asserted-by":"crossref","unstructured":"Indulska, M., Green, P., Recker, J., & Rosemann, M. (2009). Business process modeling: Perceived benefits. Paper presented at theInternational Conference on Conceptual Modeling.","DOI":"10.1007\/978-3-642-04840-1_34"},{"key":"IJ3DIM.2016070103-23","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2012.12.005"},{"journal-title":"Refabricating architecture","year":"2003","author":"S.Kieran","key":"IJ3DIM.2016070103-24"},{"key":"IJ3DIM.2016070103-25","doi-asserted-by":"crossref","unstructured":"Kolarevic, B. (2005). Architecture in the digital age: design and manufacturing. London: Taylor & Francis.","DOI":"10.4324\/9780203634561"},{"key":"IJ3DIM.2016070103-26","doi-asserted-by":"publisher","DOI":"10.4018\/978-1-59140-104-9.ch004"},{"key":"IJ3DIM.2016070103-27","doi-asserted-by":"publisher","DOI":"10.1016\/S0360-8352(01)00045-6"},{"key":"IJ3DIM.2016070103-28","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2005.09.009"},{"journal-title":"The Toyota way: 14 management principles from the world\u2019s greatest manufacturer","year":"2004","author":"J. K.Liker","key":"IJ3DIM.2016070103-29"},{"key":"IJ3DIM.2016070103-30","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2013.09.007"},{"key":"IJ3DIM.2016070103-31","doi-asserted-by":"publisher","DOI":"10.1177\/0266242609360610"},{"key":"IJ3DIM.2016070103-32","doi-asserted-by":"publisher","DOI":"10.1017\/S003181910003967X"},{"key":"IJ3DIM.2016070103-33","unstructured":"NBS. (2014). NBS National BIM Report 2014."},{"key":"IJ3DIM.2016070103-34","unstructured":"NBS. (2015). NBS National BIM Report 2015."},{"key":"IJ3DIM.2016070103-35","unstructured":"NBS. (2016). National BIM Report 2016."},{"key":"IJ3DIM.2016070103-36","unstructured":"O'Rourke, L. (2013). The future of DfMA is the future of construction [Press release]. Retrieved from https:\/\/www.laingorourke.com\/~\/media\/LOR\/Files\/LOR%20Engineering%20Excellence%20Journal%202013.pdf"},{"key":"IJ3DIM.2016070103-37","unstructured":"Paterson, G., Machado, M., Platts, T., & Underwood, J. (2016). Digitising UK Construction: Closing The Gap Between UK Government Aspirations And Industry's Ability To Deliver."},{"key":"IJ3DIM.2016070103-38","doi-asserted-by":"publisher","DOI":"10.1108\/CI-01-2014-0013"},{"journal-title":"Design for assembly: principles and practice. London","year":"1994","author":"A. H.Redford","key":"IJ3DIM.2016070103-39"},{"key":"IJ3DIM.2016070103-40","unstructured":"Sacks, R., Dave, B., Koskela, L. J., & Owen, R. L. (2009). Analysis framework for the interaction between lean construction and building information modelling."},{"key":"IJ3DIM.2016070103-41","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CO.1943-7862.0000203"},{"key":"IJ3DIM.2016070103-42","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2010.02.010"},{"key":"IJ3DIM.2016070103-43","doi-asserted-by":"crossref","unstructured":"Sanchez, A. e., Hampson, K. e., & Vaux, S. e. (2016). Delivering value with BIM: a whole-of-life approach.","DOI":"10.4324\/9781315652474"},{"key":"IJ3DIM.2016070103-44","unstructured":"Schodek, D. L. (2005). Digital design and manufacturing: CAD\/CAM applications in architecture and design. Chichester: John Wiley."},{"journal-title":"The placing and management of building contracts: report of the Central Council for Works and Buildings","year":"1944","author":"S. E.Simon","key":"IJ3DIM.2016070103-45"},{"key":"IJ3DIM.2016070103-46","doi-asserted-by":"publisher","DOI":"10.1002\/9780470432846"},{"key":"IJ3DIM.2016070103-47","unstructured":"Statistics, O. N. (2015). Construction Statistics - No. 16, 2015 Edition. Newport, UK. Retrieved from http:\/\/www.ons.gov.uk\/ons\/rel\/construction\/construction-statistics\/no--15--2014-edition\/index.html"},{"key":"IJ3DIM.2016070103-48","doi-asserted-by":"publisher","DOI":"10.1108\/14714171211215921"},{"key":"IJ3DIM.2016070103-49","unstructured":"White, S. (2016). Business population estimates for the UK and Regions 2015. Sheffield, UK: Crown. Retrieved from https:\/\/www.gov.uk\/government\/uploads\/system\/uploads\/attachment_data\/file\/467443\/bpe_2015_statistical_release.pdf"},{"key":"IJ3DIM.2016070103-50","unstructured":"Wolstenholme, A., Austin, S. A., Bairstow, M., Blumenthal, A., Lorimer, J., McGuckin, S., & Davies, R. (2009). Never waste a good crisis: a review of progress since Rethinking Construction and thoughts for our future. Retrieved from https:\/\/dspace.lboro.ac.uk\/2134\/6040"},{"key":"IJ3DIM.2016070103-51","unstructured":"Womack, J. (1996). Lean thinking. USA: USA: Simon &amp; Schuster."}],"container-title":["International Journal of 3-D Information Modeling"],"original-title":[],"language":"ng","link":[{"URL":"https:\/\/www.igi-global.com\/viewtitle.aspx?TitleId=177239","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,6,15]],"date-time":"2025-06-15T02:53:51Z","timestamp":1749956031000},"score":1,"resource":{"primary":{"URL":"https:\/\/services.igi-global.com\/resolvedoi\/resolve.aspx?doi=10.4018\/IJ3DIM.2016070103"}},"subtitle":["A Case Study on A Fit-Out SME in the UK"],"short-title":[],"issued":{"date-parts":[[2016,7,1]]},"references-count":52,"journal-issue":{"issue":"3","published-print":{"date-parts":[[2016,7]]}},"URL":"https:\/\/doi.org\/10.4018\/ij3dim.2016070103","relation":{},"ISSN":["2156-1710","2156-1702"],"issn-type":[{"type":"print","value":"2156-1710"},{"type":"electronic","value":"2156-1702"}],"subject":[],"published":{"date-parts":[[2016,7,1]]}}}