{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2022,6,1]],"date-time":"2022-06-01T20:40:49Z","timestamp":1654116049247},"reference-count":20,"publisher":"IGI Global","issue":"4","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2016,10,1]]},"abstract":"<p>The UK government set up a BIM Task Group in 2011 to provide guidance and support to the industry. This paper reports on BIM Capability audits that were undertaken on two contractor-based organisations to assess their level of readiness to implement BIM level 2 and to highlight training and upskilling needs. The audits were undertaken using a detailed set of 80 questions covering technology, workflows, processes and business strategies. Follow up interviews were undertaken to clarify any ambiguities in the responses received. A vertical cross section of each organisation was audited in order to provide a fully representative sample of the companies as the implementation of BIM will have an impact on the whole business model of the firms. The organisations had differing aspirations and timescales for the implementation of BIM and to some extent this was demonstrated by the outcome of the audits. The results were found to be consistent with the findings of another major similar HS2 upskilling study which the authors were also involved in.<\/p>","DOI":"10.4018\/ij3dim.2016100102","type":"journal-article","created":{"date-parts":[[2017,6,19]],"date-time":"2017-06-19T20:07:06Z","timestamp":1497902826000},"page":"12-24","source":"Crossref","is-referenced-by-count":2,"title":["BIM Capability Audit of Contracting-Based Organisations"],"prefix":"10.4018","volume":"5","author":[{"given":"Graham","family":"Hayne","sequence":"first","affiliation":[{"name":"Glasgow Caledonian University, School of Engineering and Built Environment, Glasgow, United Kingdom"}]},{"given":"Bimal","family":"Kumar","sequence":"additional","affiliation":[{"name":"Glasgow Caledonian University, School of Engineering and Built Environment, Glasgow, United Kingdom"}]}],"member":"2432","reference":[{"key":"IJ3DIM.2016100102-0","unstructured":"BIM Task Group. (2013a). FAQ 16. Retrieved 1 March 2016 from http:\/\/www.bimtaskgroup.org\/bim-faqs\/"},{"key":"IJ3DIM.2016100102-1","unstructured":"BIM Task Group. (2013b). Government Soft Landings. Retrieved from http:\/\/www.bimtaskgroup.org\/gsl-policy-2\/"},{"key":"IJ3DIM.2016100102-2","year":"2013","journal-title":"PAS 1192-2 Specification for information management for the capital\/delivery phase of construction projects using building information modelling"},{"key":"IJ3DIM.2016100102-3","year":"2014","journal-title":"PAS 1192-3 Specification for information management for the operational phase of assets using building information modelling"},{"key":"IJ3DIM.2016100102-4","year":"2014 b","journal-title":"BS1192-4:2014 Collaborative Production of Architectural, Engineering and Construction Information Part 4 \u2013 Client information requirements (COBie)"},{"key":"IJ3DIM.2016100102-5","year":"2015"},{"key":"IJ3DIM.2016100102-6","unstructured":"Cabinet Office. (2011), Government Construction Strategy. Retrieved from https:\/\/www.gov.uk\/government\/uploads\/system\/uploads\/attachment_data\/file\/61152\/Government-Construction-Strategy_0.pdf"},{"key":"IJ3DIM.2016100102-7","year":"2013","journal-title":"Building Information Model (BIM) Protocol"},{"key":"IJ3DIM.2016100102-8","author":"R.Crotty","year":"2012","journal-title":"The Impact of Building Information Modelling"},{"key":"IJ3DIM.2016100102-9","doi-asserted-by":"publisher","DOI":"10.1108\/20401461111119422"},{"key":"IJ3DIM.2016100102-10","author":"C.Eastman","year":"2011","journal-title":"BIM Handbook"},{"key":"IJ3DIM.2016100102-11","author":"J.Egan","year":"1998","journal-title":"Rethinking Construction"},{"key":"IJ3DIM.2016100102-12","unstructured":"HS2. (2014). HS2 Supply Chain BIM Upskilling Study. Retrieved from http:\/\/assets.hs2.org.uk\/sites\/default\/files\/HS2%20Supply%20Chain%20BIM%20Upskilling%20Study%2013-06-14.pdf"},{"key":"IJ3DIM.2016100102-13","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-642-21762-3_114"},{"key":"IJ3DIM.2016100102-14","author":"B.Kumar","year":"2015","journal-title":"A Practical Guide to Implementation of BIM in Construction Projects"},{"key":"IJ3DIM.2016100102-15","author":"M.Latham","year":"1994","journal-title":"Constructing the Team"},{"key":"IJ3DIM.2016100102-16","year":"2015","journal-title":"National BIM Report 2015"},{"key":"IJ3DIM.2016100102-17","year":"2016","journal-title":"National BIM Report 2016"},{"key":"IJ3DIM.2016100102-18","unstructured":"Office of National Statistics (ONS). (2009). Construction Statistics Annual."},{"key":"IJ3DIM.2016100102-19","author":"D.Simchi-Levi","year":"2003","journal-title":"Designing and Managing the Supply Chain Concepts, Strategies and Case Studies"}],"container-title":["International Journal of 3-D Information Modeling"],"original-title":[],"language":"ng","link":[{"URL":"https:\/\/www.igi-global.com\/viewtitle.aspx?TitleId=183670","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,6,1]],"date-time":"2022-06-01T20:06:40Z","timestamp":1654114000000},"score":1,"resource":{"primary":{"URL":"https:\/\/services.igi-global.com\/resolvedoi\/resolve.aspx?doi=10.4018\/IJ3DIM.2016100102"}},"subtitle":[""],"short-title":[],"issued":{"date-parts":[[2016,10,1]]},"references-count":20,"journal-issue":{"issue":"4","published-print":{"date-parts":[[2016,10]]}},"URL":"https:\/\/doi.org\/10.4018\/ij3dim.2016100102","relation":{},"ISSN":["2156-1710","2156-1702"],"issn-type":[{"value":"2156-1710","type":"print"},{"value":"2156-1702","type":"electronic"}],"subject":[],"published":{"date-parts":[[2016,10,1]]}}}