{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,6,25]],"date-time":"2024-06-25T00:08:48Z","timestamp":1719274128718},"reference-count":23,"publisher":"IGI Global","issue":"4","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2016,10,1]]},"abstract":"<p>The UK's construction industry is witnessing an annual increase in costs due to a lack of communication between the different organizational operators on the construction site that often leads to construction defects. Meanwhile, a cost-reduction strategy plan using BIM has become a fundamental requirement for the government, aiming to keep costs under control. To facilitate BIM adoption in the industry, the BIM strategy was introduced in four phases, with each stage entailing a number of criteria. The industry has seen a global reaction to the Level 2 BIM program and a significant cost saving of 840M in 2013\/14 in Europe. However, the industry is unable to match the level 3 BIM, where a collaborative model file server is required as a common sharable platform to achieve efficient communication. This study contributes toward formulating a communication framework in the UK industry to understand communication issues and manage defects. A survey was targeted at construction industry practitioners and academics, with a total number of 328 participants.<\/p>","DOI":"10.4018\/ij3dim.2016100104","type":"journal-article","created":{"date-parts":[[2017,6,19]],"date-time":"2017-06-19T20:07:06Z","timestamp":1497902826000},"page":"39-53","source":"Crossref","is-referenced-by-count":0,"title":["Construction Site Communication Study Using the RAM Management System for BIM Adaptation"],"prefix":"10.4018","volume":"5","author":[{"given":"Raid Yahia","family":"Shrahily","sequence":"first","affiliation":[{"name":"Nottingham Trent University, Nottingham, United Kingdom"}]},{"given":"Benachir","family":"Medjdoub","sequence":"additional","affiliation":[{"name":"Nottingham Trent University, Nottingham, United Kingdom"}]},{"given":"Hynda Aoun","family":"Klalib","sequence":"additional","affiliation":[{"name":"Nottingham Trent University, Nottingham, United Kingdom"}]},{"given":"Moulay Larbi","family":"Chalal","sequence":"additional","affiliation":[{"name":"Nottingham Trent University, Nottingham, United Kingdom"}]}],"member":"2432","reference":[{"key":"IJ3DIM.2016100104-0","article-title":"Applying the Work Breakdown Structure to the Project Management Lifecycle. In","author":"S. A.Brotherton","year":"2008)","journal-title":"PMI Global Congress Proceedings"},{"key":"IJ3DIM.2016100104-1","unstructured":"Carstens, D.S., Richardson, G.L. & Smith, R.B. (2013). Project Management Tools and Techniques - A Practical Guide."},{"key":"IJ3DIM.2016100104-2","unstructured":"Charalambous, G., Thorpe, T., Demian, P., Yeomans, S. G., Doughty, N., & Peters, C. (2013). Collaborative BIM in the cloud and the communication tools to support it. In Proceedings of the 30th CIB W78 International Conference."},{"key":"IJ3DIM.2016100104-3","unstructured":"CITB. (2014). Skills and Training in the Construction Industry 2014."},{"key":"IJ3DIM.2016100104-4","author":"I. G.Cpm","year":"2006","journal-title":"Project Management Guideline"},{"key":"IJ3DIM.2016100104-5","author":"T. R.Devi","year":"2012","journal-title":"Work Breakdown Structure of the Project"},{"key":"IJ3DIM.2016100104-6","author":"U. S. D.Energy","year":"2003","journal-title":"Work breakdown structure. Project Management Practices"},{"key":"IJ3DIM.2016100104-7","unstructured":"Ernest, L. (2004). BRE guidance on construction site communication construction documentation Drawing s."},{"key":"IJ3DIM.2016100104-8","author":"B.Giel","year":"2010","journal-title":"Return on investment analysis of building information modeling in construction"},{"key":"IJ3DIM.2016100104-9","doi-asserted-by":"crossref","unstructured":"Golany, B. & Avraham, S. (2001). Introduction: Division of Between the Project Work Breakdown Structure and Types of Work Breakdown Structure.","DOI":"10.1002\/9780470172339.ch47"},{"key":"IJ3DIM.2016100104-10","unstructured":"Golany, B., & Shtub, A. (2001). Work Breakdown Structure. In Handbook of Industrial Engineering: Technology and Operations Management."},{"key":"IJ3DIM.2016100104-11","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2010.09.002"},{"key":"IJ3DIM.2016100104-12","unstructured":"Hoezen, M.E.L., Reymen, I.M.M.J. & Dewulf, G.P.M.R. (2006). The problem of communication in construction."},{"key":"IJ3DIM.2016100104-13","unstructured":"Hooper-Greenhill, E. (1999). Communication in Theory and Practice. In The Educational Role of the Museum."},{"key":"IJ3DIM.2016100104-14","unstructured":"Howard, R. & Penttil\u00e4, H. (2006). Describing the Changes in Architectural Information Free-Form Architectural Expression."},{"key":"IJ3DIM.2016100104-15","unstructured":"Kanabar, V. (2013). Organizational structure Job Descriptions."},{"key":"IJ3DIM.2016100104-16","unstructured":"Khalil, M. & Abdul, B.I.N. (2006). Construction planning and scheduling."},{"key":"IJ3DIM.2016100104-17","author":"D.McNell","year":"2008","journal-title":"Building Information Modeling"},{"key":"IJ3DIM.2016100104-18","unstructured":"Modelling, B.I. & Plan, S. (2015). Digital Built Britain Level 3 Building Information Modelling - Strategic Plan."},{"key":"IJ3DIM.2016100104-19","unstructured":"Nevison, J. & John, M. (2013). aWP_RespAssignmentMatrix."},{"key":"IJ3DIM.2016100104-20","doi-asserted-by":"crossref","unstructured":"Steel, J., Drogemuller, R. & Toth, B. (2009). Model Interoperability in Building Information Modelling.","DOI":"10.1007\/s10270-010-0178-4"},{"key":"IJ3DIM.2016100104-21","article-title":"A Framework for Integrating Change Management with Building Information Modeling.","author":"D. R.Tobergte","year":"2013","journal-title":"Journal of Chemical Information and Modeling"},{"key":"IJ3DIM.2016100104-22","article-title":"Using Augmented Reality to Plan Virtual Construction Worksite.","author":"X.Wang","year":"2006","journal-title":"Advanced Robotics"}],"container-title":["International Journal of 3-D Information Modeling"],"original-title":[],"language":"ng","link":[{"URL":"https:\/\/www.igi-global.com\/viewtitle.aspx?TitleId=183672","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,6,24]],"date-time":"2024-06-24T21:17:19Z","timestamp":1719263839000},"score":1,"resource":{"primary":{"URL":"https:\/\/services.igi-global.com\/resolvedoi\/resolve.aspx?doi=10.4018\/IJ3DIM.2016100104"}},"subtitle":[""],"short-title":[],"issued":{"date-parts":[[2016,10,1]]},"references-count":23,"journal-issue":{"issue":"4","published-print":{"date-parts":[[2016,10]]}},"URL":"https:\/\/doi.org\/10.4018\/ij3dim.2016100104","relation":{},"ISSN":["2156-1710","2156-1702"],"issn-type":[{"value":"2156-1710","type":"print"},{"value":"2156-1702","type":"electronic"}],"subject":[],"published":{"date-parts":[[2016,10,1]]}}}