{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,6,10]],"date-time":"2026-06-10T15:11:14Z","timestamp":1781104274620,"version":"3.54.1"},"reference-count":61,"publisher":"IGI Global Scientific Publishing","issue":"2","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2017,4,1]]},"abstract":"<p>This article highlights the advantages of Lean Construction (\u2018Lean') and Building Information Modelling ('BIM') that have received much attention. Individually, each promises transformative and beneficial effects on the construction process, prompting researchers to consider the possibility of synergies between the two. An early example is the hypothetical \u2018Lean-BIM Interaction Matrix' of Rafael Sacks and his collaborators. In this, Lean principles are set against BIM functionality and synergies predicted. Early tests of the proposals were through retrospective case studies. Further promising results have been demonstrated in construction projects in the USA. This suggests that similar results might be possible elsewhere, prompting the present UK study. The methodological approach is case-study based on projects where the contractor purports to be using (i) Lean principles, (ii) BIM, and (iii) both. Evidence will be collected through a variety of means (including interviews, documents, and observation). The research is currently at a stage where data has been collected from the first few case-study projects.<\/p>","DOI":"10.4018\/ij3dim.2017040101","type":"journal-article","created":{"date-parts":[[2017,11,8]],"date-time":"2017-11-08T09:56:37Z","timestamp":1510134997000},"page":"1-13","source":"Crossref","is-referenced-by-count":1,"title":["An Investigation Into \u2018Lean-BIM' Synergies in the UK Construction Industry"],"prefix":"10.4018","volume":"6","author":[{"given":"David J","family":"Greenwood","sequence":"first","affiliation":[{"name":"Faculty of Engineering & Environment, Northumbria University, Newcastle, UK"}],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Lou Thai","family":"Jie","sequence":"additional","affiliation":[{"name":"Northumbria University, Newcastle, UK"}],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Kay","family":"Rogage","sequence":"additional","affiliation":[{"name":"School of Computing Information Sciences, Northumbria University, Newcastle, UK"}],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"2432","reference":[{"key":"IJ3DIM.2017040101-0","unstructured":"AIA. (2010). Integrated Project Delivery: Case Studies. Retrieved August 04, 2016, from http:\/\/www.aia.org\/akr\/Resources\/Documents\/AIAP038147"},{"key":"IJ3DIM.2017040101-1","doi-asserted-by":"publisher","DOI":"10.4324\/9780203345825"},{"issue":"1","key":"IJ3DIM.2017040101-2","first-page":"26","article-title":"Assessing the impacts of implementing lean construction.","volume":"23","author":"L. F.Alarc\u00f3n","year":"2011","journal-title":"Revista de Ingenier\u00eda de Construcci\u00f3n"},{"key":"IJ3DIM.2017040101-3","doi-asserted-by":"publisher","DOI":"10.1108\/14714170810888976"},{"key":"IJ3DIM.2017040101-4","unstructured":"Aouad, G., Cooper, R., Fu, C., Lee, A., Ponting, A., Tah, J., & Wu, S. (2005). nD modelling\u2013a driver or enabler for construction improvement. RICS Research paper series, 5(6), 1-41."},{"key":"IJ3DIM.2017040101-5","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2010.09.016"},{"key":"IJ3DIM.2017040101-6","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)LM.1943-5630.0000127"},{"key":"IJ3DIM.2017040101-7","unstructured":"Ballard, G., & Howell, G. (1997). Implementing lean construction: improving downstream performance. Lean construction, 111-125."},{"key":"IJ3DIM.2017040101-8","unstructured":"Ballard, G., & Howell, G. (1998) What kind of production is construction? Retrieved August 4, 2016, from http:\/\/leanconstruction.org.uk\/wp content\/uploads\/2012\/05\/BallardAndHowell.pdf"},{"key":"IJ3DIM.2017040101-9","unstructured":"Ballard, H. G. (2000). The last planner system of production control [Doctoral dissertation]. University of Birmingham."},{"key":"IJ3DIM.2017040101-10","doi-asserted-by":"publisher","DOI":"10.1108\/IJOPM-07-2013-0329"},{"key":"IJ3DIM.2017040101-11","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)EI.1943-5541.0000023"},{"issue":"15","key":"IJ3DIM.2017040101-12","first-page":"185","article-title":"The perceived value of building information modeling in the US building industry.","volume":"15","author":"B.Becerik-Gerber","year":"2010","journal-title":"Journal of Information Technology in Construction"},{"issue":"1","key":"IJ3DIM.2017040101-13","doi-asserted-by":"crossref","first-page":"46","DOI":"10.60164\/55h8g4h8c","article-title":"Lean Construction: Where are we and how to proceed.","volume":"1","author":"S.Bertelsen","year":"2004","journal-title":"Lean Construction Journal"},{"key":"IJ3DIM.2017040101-14","article-title":"Integration Framework of BIM with the Last Planner System.","author":"A.Bhatla","year":"2012","journal-title":"20th Conference of the International Group for Lean Construction"},{"key":"IJ3DIM.2017040101-15","first-page":"284","article-title":"Combining BIM and Lean Construction: Towards Enhanced Collaborative Working?","author":"K.Br\u00e5then","year":"2016","journal-title":"Proceedings of the CIB World Building Congress 2016"},{"key":"IJ3DIM.2017040101-16","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijproman.2012.12.001"},{"key":"IJ3DIM.2017040101-17","unstructured":"Cabinet Office. (2011). Government Construction Strategy. Retrieved August 4, 2016, from https:\/\/www.gov.uk\/government\/uploads\/system\/uploads\/attachment_data\/file\/61152\/Government-Construction-Strategy_0.pdf"},{"key":"IJ3DIM.2017040101-18","unstructured":"CLC. (2016) The Farmer Review of the UK Construction Labour Model. Construction Leadership Council. Retrieved September 04, 2017, from http:\/\/www.constructionleadershipcouncil.co.uk\/wp-content\/uploads\/2016\/10\/Farmer-Review.pdf"},{"key":"IJ3DIM.2017040101-19","unstructured":"Collaborative, I. P. D. (2016). Benefits of IPD. Retrieved August 4, 2016, from http:\/\/ipdfl.net\/why-us\/benefits-of-ipd\/"},{"key":"IJ3DIM.2017040101-20","first-page":"31","article-title":"Challenges and opportunities in implementing lean and BIM on an infrastructure project.","author":"B.Dave","year":"2013","journal-title":"21st Conference of the International Group for Lean Construction"},{"key":"IJ3DIM.2017040101-21","author":"B.Dave","year":"2013","journal-title":"Implementing Lean in construction: CIRIA Lean Guide C725 (Lean Construction and BIM)"},{"key":"IJ3DIM.2017040101-22","unstructured":"Dong, N. T., Khanzode, A., & Lindberg, H. (2013). Applying Lean Principles, BIM, and Quality Control to a Construction Supply Chain Management System. In Proceedings of the 30th CIB W78 International Conference (pp. 535-544)."},{"key":"IJ3DIM.2017040101-23","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2013.09.001"},{"key":"IJ3DIM.2017040101-24","author":"C. M.Eastman","year":"2011","journal-title":"BIM handbook: A guide to building information modeling for owners, managers, designers, engineers and contractors"},{"key":"IJ3DIM.2017040101-25","unstructured":"Gerber, D. J., Becerik-Gerber, B., & Kunz, A. (2010). Building information modeling and lean construction: technology, methodology and advances from practice. In Proc. of the 18th Int\u2019l Group for Lean Const. Haifa, Israel."},{"key":"IJ3DIM.2017040101-26","unstructured":"Gledson, B. J., & Greenwood, D. (2014). The implementation and use of 4D BIM and Virtual Construction. in: Raiden, A B and Aboagye-Nimo, E (Eds.), Procs 30th Annual ARCOM Conference, September 1-3, Portsmouth, UK (pp. 673-682)."},{"key":"IJ3DIM.2017040101-27","doi-asserted-by":"publisher","DOI":"10.1080\/014461999371637"},{"key":"IJ3DIM.2017040101-28","doi-asserted-by":"publisher","DOI":"10.1080\/09613210500285106"},{"key":"IJ3DIM.2017040101-29","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2010.09.002"},{"key":"IJ3DIM.2017040101-30","article-title":"Implementing lean construction: understanding and action.","author":"G.Howell","year":"1998","journal-title":"Proc. 6th Annual Conference of the International Group for Lean Construction"},{"key":"IJ3DIM.2017040101-31","article-title":"What is lean construction.","volume":"Vol. 7","author":"G. A.Howell","year":"1999","journal-title":"Proceedings IGLC,"},{"key":"IJ3DIM.2017040101-32","doi-asserted-by":"crossref","unstructured":"Isikdag, U., & Underwood, J. (2010). A synopsis of the handbook of research on building information modeling. In Proceedings of CIB 2010 World Building Congress, Salford, UK.","DOI":"10.4018\/978-1-60566-928-1"},{"issue":"1","key":"IJ3DIM.2017040101-33","doi-asserted-by":"crossref","first-page":"19","DOI":"10.60164\/87b3c5e5g","article-title":"Lean construction: Prospects for the German construction industry.","volume":"3","author":"E.Johansen","year":"2007","journal-title":"Lean Construction Journal"},{"key":"IJ3DIM.2017040101-34","unstructured":"Khanzode, A., Fischer, M., & Reed, D. (2005). Case study of the implementation of the lean project delivery system (LPDS) using virtual building technologies on a large healthcare project. In Proceedings of the 13th International Group for Lean Construction Conference."},{"key":"IJ3DIM.2017040101-35","doi-asserted-by":"publisher","DOI":"10.1108\/09699981211277531"},{"key":"IJ3DIM.2017040101-36","unstructured":"Kinnie, N., Hutchinson, S., & Purcell, J. (1996). The people management implications of leaner ways of working. Issues in People Management, (15), 6-63."},{"key":"IJ3DIM.2017040101-37","unstructured":"Koskela, L. (1992). Application of the New Production Philosophy to Construction (Technical Report #72)."},{"key":"IJ3DIM.2017040101-38","doi-asserted-by":"crossref","unstructured":"Koskela, L. (1997). Lean production in construction. Lean construction.","DOI":"10.4324\/9780203345825_Lean_manufacturing_of_construction_components"},{"key":"IJ3DIM.2017040101-39","unstructured":"Koskela, L., Howell, G., Ballard, G., & Tommelein, I. (2002). The foundations of lean construction. Design and construction: Building in value (pp. 211-226)."},{"key":"IJ3DIM.2017040101-40","author":"J. E.Liker","year":"2003","journal-title":"The Toyota way"},{"key":"IJ3DIM.2017040101-41","unstructured":"Manning, R., & Messner, J. (2008). Case studies in BIM implementation for programming of healthcare facilities. ITcon special Issue-Case studies of BIM use, 13, 246\u2013257."},{"key":"IJ3DIM.2017040101-42","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2013.826831"},{"key":"IJ3DIM.2017040101-43","author":"M.Murray","year":"2008","journal-title":"Construction Reports 1944-98"},{"key":"IJ3DIM.2017040101-44","unstructured":"National Building Specification NBS. (2017). What is Building Information Modelling (BIM)? Retrieved September 04, 2017 from https:\/\/www.thenbs.com\/knowledge\/what-is-building-information-modelling-bim"},{"key":"IJ3DIM.2017040101-45","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2012.12.004"},{"key":"IJ3DIM.2017040101-46","unstructured":"Roslyn, B. L. (2007) Project Delivery Systems: Trends and Methods, Retrieved August 4, 2016, from http:\/\/www.aia.org\/akr\/Resources\/Documents\/AIAP038147"},{"key":"IJ3DIM.2017040101-47","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CO.1943-7862.0000203"},{"key":"IJ3DIM.2017040101-48","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CO.1943-7862.0000102"},{"key":"IJ3DIM.2017040101-49","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0742-597X(2006)22:4(168)"},{"key":"IJ3DIM.2017040101-50","author":"J.Sands","year":"2015","journal-title":"The BIM Roadmap: a building owner\u2019s guide to implementing BIM. BRSRIA"},{"key":"IJ3DIM.2017040101-51","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2017.03.005"},{"issue":"1","key":"IJ3DIM.2017040101-52","first-page":"1","article-title":"Barriers to implementing lean construction in the UK construction industry.","volume":"6","author":"S.Sarhan","year":"2013","journal-title":"The Built & Human Environment Review"},{"key":"IJ3DIM.2017040101-53","author":"R. J.Schonberger","year":"1996","journal-title":"World Class Manufacturing: The Next Decade"},{"key":"IJ3DIM.2017040101-54","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2008.10.003"},{"key":"IJ3DIM.2017040101-55","first-page":"668","article-title":"BIM and lean construction change design management practices.","author":"M.Tauriainen","year":"2016","journal-title":"Creative Construction Conference 2016"},{"key":"IJ3DIM.2017040101-56","first-page":"28","article-title":"BIM and Lean in the Design-Production Interface of ETO Components in Complex Projects.","author":"P.Tillmann","year":"2015","journal-title":"Proceedings of the 23rd Annual Conference of the International Group for Lean Construction"},{"key":"IJ3DIM.2017040101-57","doi-asserted-by":"publisher","DOI":"10.1016\/0926-5805(92)90014-B"},{"key":"IJ3DIM.2017040101-58","article-title":"Effects of Lean Work Organization and Industrialization on Workflow and Productive Time in Housing Renovation Projects.","author":"R.Vrijhoef","year":"2016","journal-title":"Proceedings of the 24th Annual Conference of the International Group for Lean Construction"},{"key":"IJ3DIM.2017040101-59","unstructured":"Wolstenholme, A. (2010). Never Waste a Good Crisis. Retrieved August 4, 2016, from http:\/\/www.constructingexcellence.org.uk\/pdf\/Wolstenholme_Report_Oct_2009.pdf"},{"key":"IJ3DIM.2017040101-60","author":"J. P.Womack","year":"2003","journal-title":"Lean Thinking: Banish Waste and Create Wealth in Your Corporation"}],"container-title":["International Journal of 3-D Information Modeling"],"original-title":[],"language":"ng","link":[{"URL":"https:\/\/www.igi-global.com\/viewtitle.aspx?TitleId=192120","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,6,28]],"date-time":"2024-06-28T08:32:55Z","timestamp":1719563575000},"score":1,"resource":{"primary":{"URL":"https:\/\/services.igi-global.com\/resolvedoi\/resolve.aspx?doi=10.4018\/IJ3DIM.2017040101"}},"subtitle":[""],"short-title":[],"issued":{"date-parts":[[2017,4,1]]},"references-count":61,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2017,4]]}},"URL":"https:\/\/doi.org\/10.4018\/ij3dim.2017040101","relation":{},"ISSN":["2156-1710","2156-1702"],"issn-type":[{"value":"2156-1710","type":"print"},{"value":"2156-1702","type":"electronic"}],"subject":[],"published":{"date-parts":[[2017,4,1]]}}}