{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2022,5,6]],"date-time":"2022-05-06T06:41:35Z","timestamp":1651819295923},"reference-count":27,"publisher":"IGI Global","issue":"3","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2018,7]]},"abstract":"<jats:p>Bridge information modeling (BrIM) has widely become an efficient tool in the bridge engineering and construction industry. It has been used in pre-fabrication, obtaining accurate quantity surveys, and creating accurate shop drawings. This article presents the utilization of bridge information modeling (BrIM) in determining the optimum construction methods of concrete bridges in bridge projects in Egypt using systematic procedures taking into account: bridge physical properties, construction cost, and site conditions. Bridge information modeling (BrIM) has proven to be an effective tool in determining the optimum construction methods of concrete bridges. The proposed BrIM approach is capable of obtaining feasible construction methods and associated construction costs based on bridge physical characteristics.<\/jats:p>","DOI":"10.4018\/ij3dim.2018070103","type":"journal-article","created":{"date-parts":[[2019,3,21]],"date-time":"2019-03-21T17:09:06Z","timestamp":1553188146000},"page":"39-53","source":"Crossref","is-referenced-by-count":0,"title":["Comparative Analysis of Bridges Construction Methods Using Bridge Information Modeling"],"prefix":"10.4018","volume":"7","author":[{"given":"Mohamed","family":"Marzouk","sequence":"first","affiliation":[{"name":"Cairo University, Giza, Egypt"}]},{"given":"Mohamed","family":"Hisham","sequence":"additional","affiliation":[{"name":"Cairo University, Giza, Egypt"}]}],"member":"2432","reference":[{"key":"IJ3DIM.2018070103-0","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(1991)117:3(393)"},{"key":"IJ3DIM.2018070103-1","doi-asserted-by":"crossref","unstructured":"Youssef, M. (2006). Intelligent selection of concrete bridge superstructure construction methods in Egypt [Doctoral thesis]. Loughborough University, UK.","DOI":"10.1061\/40794(179)164"},{"key":"IJ3DIM.2018070103-2","doi-asserted-by":"publisher","DOI":"10.3846\/13923730.2007.9636416"},{"key":"IJ3DIM.2018070103-3","doi-asserted-by":"publisher","DOI":"10.1177\/1420326X13498400"},{"key":"IJ3DIM.2018070103-4","doi-asserted-by":"crossref","unstructured":"Castronovo, F., Lee, S., Nikolic, D., & Messner, J. (2014). Visualization in 4D Construction Management Software: A Review of Standards and Guidelines. In 2014International Conference on Computing in Civil and Building Engineering.","DOI":"10.1061\/9780784413616.040"},{"key":"IJ3DIM.2018070103-5","article-title":"Visualization and automatic verification of a schedule-driven 4D model.","author":"J.Lin","year":"2015","journal-title":"5th International Conference on Construction Applications of Virtual Reality"},{"key":"IJ3DIM.2018070103-6","doi-asserted-by":"publisher","DOI":"10.1061\/41042(349)18"},{"key":"IJ3DIM.2018070103-7","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0887-3801(2001)15:4(329)"},{"key":"IJ3DIM.2018070103-8","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0887-3801(2009)23:6(363)"},{"key":"IJ3DIM.2018070103-9","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0887-3801(2005)19:4(356)"},{"key":"IJ3DIM.2018070103-10","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(2004)130:4(598)"},{"key":"IJ3DIM.2018070103-11","doi-asserted-by":"publisher","DOI":"10.1061\/40794(179)139"},{"key":"IJ3DIM.2018070103-12","doi-asserted-by":"publisher","DOI":"10.1111\/j.1467-8667.2009.00601.x"},{"key":"IJ3DIM.2018070103-13","unstructured":"The Associated General Contractors of America. (2006). The Contractors\u2019 Guide to BIM (1st ed.). Retrieved from http:\/\/www.agc.org\/"},{"key":"IJ3DIM.2018070103-14","year":"2007","journal-title":"United States National Building Information Modeling Standard. Version 1 \u2013 Part 1: Overview, Principles, and Mythologies"},{"key":"IJ3DIM.2018070103-15","doi-asserted-by":"publisher","DOI":"10.1061\/9780784413616.192"},{"key":"IJ3DIM.2018070103-16","first-page":"1979","article-title":"The idealization of an integrated BIM, lean, and green model (BLG)","author":"J. L. F.Solis","year":"2010","journal-title":"Handbook of Research on Building Information Modelling and Construction Informatics: Concepts and Technologies"},{"key":"IJ3DIM.2018070103-17","unstructured":"ASHRAE. (n.d.). An Introduction to Building Information Modeling (BIM): A Guide for ASHRAE Members. Retrieved from http:\/\/cms.ashrae.biz\/bim\/"},{"key":"IJ3DIM.2018070103-18","unstructured":"McCuen, M. (2008). Scheduling, Estimating, and BIM: a Profitable Combination. In Proceedings of 2008 AACE International Transactions."},{"key":"IJ3DIM.2018070103-19","article-title":"Bridge information modeling in sustainable bridge management.","author":"M.Marzouk","year":"2011","journal-title":"International Conference on Sustainable Design & Construction"},{"key":"IJ3DIM.2018070103-20","article-title":"Parametric 3D-centric design and construction of steel bridges.","author":"S. S.Chen","year":"2007","journal-title":"Proc., 2007 World Steel Bridge Symposium, National Steel Bridge Alliance"},{"key":"IJ3DIM.2018070103-21","doi-asserted-by":"publisher","DOI":"10.3846\/bjrbe.2013.23"},{"key":"IJ3DIM.2018070103-22","doi-asserted-by":"publisher","DOI":"10.19053\/01211129.v26.n46.2017.7314"},{"key":"IJ3DIM.2018070103-23","doi-asserted-by":"publisher","DOI":"10.1016\/j.proeng.2011.07.010"},{"key":"IJ3DIM.2018070103-24","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)ME.1943-5479.0000460"},{"key":"IJ3DIM.2018070103-25","doi-asserted-by":"publisher","DOI":"10.1061\/40794(179)164"},{"key":"IJ3DIM.2018070103-26","doi-asserted-by":"publisher","DOI":"10.1007\/s12205-014-0455-9"}],"container-title":["International Journal of 3-D Information Modeling"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/www.igi-global.com\/viewtitle.aspx?TitleId=225789","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,5,6]],"date-time":"2022-05-06T06:24:52Z","timestamp":1651818292000},"score":1,"resource":{"primary":{"URL":"http:\/\/services.igi-global.com\/resolvedoi\/resolve.aspx?doi=10.4018\/IJ3DIM.2018070103"}},"subtitle":[""],"short-title":[],"issued":{"date-parts":[[2018,7]]},"references-count":27,"journal-issue":{"issue":"3"},"URL":"https:\/\/doi.org\/10.4018\/ij3dim.2018070103","relation":{},"ISSN":["2156-1710","2156-1702"],"issn-type":[{"value":"2156-1710","type":"print"},{"value":"2156-1702","type":"electronic"}],"subject":[],"published":{"date-parts":[[2018,7]]}}}