{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,6,10]],"date-time":"2026-06-10T16:23:40Z","timestamp":1781108620410,"version":"3.54.1"},"reference-count":44,"publisher":"IGI Global Scientific Publishing","issue":"4","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2017,10]]},"abstract":"<jats:p>Over the last few years, a plethora of public works have taken place, focusing towards urban renewal, in the greater Thessaloniki district. Municipality of Thessaloniki, provided data for twelve public projects of urban renewal. Mathematical models have been proposed for cost and time prediction based on regression analysis. Furthermore, the Fast Artificial Neural Network (FANN Tool) was applied, to predict the duration and the final cost of the project, using volume of earthwork, as input variable. Both approaches could facilitate project stakeholders, to forecast the projects' final delivery date and cost and provide early warnings for any deviation from the initial budget. The results indicate that neural networks perform better than regression analysis' models, in the case of urban renewal projects.<\/jats:p>","DOI":"10.4018\/ijissc.2017100103","type":"journal-article","created":{"date-parts":[[2017,7,24]],"date-time":"2017-07-24T09:55:07Z","timestamp":1500890107000},"page":"37-52","source":"Crossref","is-referenced-by-count":4,"title":["Neural Networks and Statistical Analysis for Time and Cost Prediction Models of Urban Redevelopment Projects"],"prefix":"10.4018","volume":"8","author":[{"given":"Maria","family":"Gkovedarou","sequence":"first","affiliation":[{"name":"School of Civil Engineering, Aristotle University of Thessaloniki, Thessaloniki,Greece"}],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Georgios N.","family":"Aretoulis","sequence":"additional","affiliation":[{"name":"School of Civil Engineering, Aristotle University of Thessaloniki, Thessaloniki,Greece"}],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"2432","reference":[{"key":"IJISSC.2017100103-0","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CO.1943-7862.0000437"},{"key":"IJISSC.2017100103-1","unstructured":"Antoniou, E. A., Aretoulis, G. N., & Kalfakakou, G. P. (2011). Content and applications of artificial intelligence for cost management in civil engineering projects. Proceedings of the sixth International Conference on Construction in the 21st Century, Construction Challenges in the New Decade, Kuala Lumpur, Malaysia."},{"key":"IJISSC.2017100103-2","doi-asserted-by":"publisher","DOI":"10.1504\/IJMDM.2013.056883"},{"issue":"7","key":"IJISSC.2017100103-3","first-page":"716","article-title":"Analytical formulation for early cost estimation and material consumption of road overpass bridges. Research Journal of Applied Sciences","volume":"12","author":"F.Antoniou","year":"2016","journal-title":"Engineering and Technology"},{"key":"IJISSC.2017100103-4","doi-asserted-by":"publisher","DOI":"10.1504\/IJMDM.2016.077761"},{"key":"IJISSC.2017100103-5","doi-asserted-by":"publisher","DOI":"10.1080\/13923730.2003.10531302"},{"issue":"3","key":"IJISSC.2017100103-6","first-page":"423","article-title":"A prototype system for the prediction of final cost in construction projects.","volume":"6","author":"G. N.Aretoulis","year":"2006","journal-title":"International Journal of Operational Research, Special Issue"},{"key":"IJISSC.2017100103-7","doi-asserted-by":"publisher","DOI":"10.4018\/IJITPM.2015070101"},{"issue":"2","key":"IJISSC.2017100103-8","first-page":"209","article-title":"Construction material supplier selection under multiple criteria.","volume":"10","author":"G. N.Aretoulis","year":"2009","journal-title":"International Journal of Operational Research"},{"key":"IJISSC.2017100103-9","unstructured":"Aretoulis, G. N., Papadakis, G. C., & Angelides, D. C. (2007). Material focused control during a construction project. Proceedings of the Fourth International Conference on Construction in the 21st Century, Accelerating Innovation in Engineering, Management and Technology, Gold Coast, Australia."},{"key":"IJISSC.2017100103-10","unstructured":"Attal, A. (2010). Development of neural network models for prediction of highway construction cost and project duration. Unpublished graduate thesis, Russ College of Engineering and Technology of Ohio University, US."},{"key":"IJISSC.2017100103-11","unstructured":"Aziz, A. M. A. (2007). Performance analysis and forecasting for WSDOT highway projects. Washington State Transportation Commission."},{"key":"IJISSC.2017100103-12","doi-asserted-by":"publisher","DOI":"10.4018\/jitpm.2013070105"},{"key":"IJISSC.2017100103-13","doi-asserted-by":"publisher","DOI":"10.4018\/jissc.2013070105"},{"key":"IJISSC.2017100103-14","doi-asserted-by":"publisher","DOI":"10.1080\/01446190600953805"},{"key":"IJISSC.2017100103-15","unstructured":"Eyers, K. (2001). Belief network analysis of direct cost risk in building construction [M.S. Thesis]. Department of Civil Engineering, University of Toronto, Canada."},{"key":"IJISSC.2017100103-16","author":"A.Field","year":"2009","journal-title":"Discovering statistics using SPSS"},{"key":"IJISSC.2017100103-17","doi-asserted-by":"publisher","DOI":"10.4018\/ijitpm.2014010101"},{"key":"IJISSC.2017100103-18","doi-asserted-by":"publisher","DOI":"10.1504\/IJPOM.2013.053151"},{"key":"IJISSC.2017100103-19","doi-asserted-by":"publisher","DOI":"10.4018\/ijitpm.2014010108"},{"key":"IJISSC.2017100103-20","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0742-597X(2007)23:4(193)"},{"issue":"29","key":"IJISSC.2017100103-21","first-page":"78","article-title":"Planning-stage estimation of highway project duration on the basis of anticipated project cost, project type, and contract type.","volume":"1","author":"M.Irfan","year":"2010","journal-title":"International Journal of Project Management"},{"key":"IJISSC.2017100103-22","doi-asserted-by":"publisher","DOI":"10.4018\/jitpm.2011040104"},{"key":"IJISSC.2017100103-23","doi-asserted-by":"publisher","DOI":"10.1080\/15578770701715052"},{"key":"IJISSC.2017100103-24","doi-asserted-by":"publisher","DOI":"10.1108\/09699981111145844"},{"key":"IJISSC.2017100103-25","doi-asserted-by":"publisher","DOI":"10.1504\/IJPOM.2013.053156"},{"key":"IJISSC.2017100103-26","doi-asserted-by":"publisher","DOI":"10.4018\/IJITPM.2015100102"},{"key":"IJISSC.2017100103-27","doi-asserted-by":"publisher","DOI":"10.1504\/IJPOM.2013.053154"},{"key":"IJISSC.2017100103-28","article-title":"Benefits of value engineering criteria studies","author":"D. N.Mitten","year":"1997","journal-title":"Proceedings of the 1997 41st Annual Meeting of AACE International"},{"key":"IJISSC.2017100103-29","doi-asserted-by":"publisher","DOI":"10.4018\/jitpm.2013070104"},{"key":"IJISSC.2017100103-30","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2004.11.001"},{"key":"IJISSC.2017100103-31","doi-asserted-by":"publisher","DOI":"10.1108\/09699980911002566"},{"key":"IJISSC.2017100103-32","doi-asserted-by":"publisher","DOI":"10.4018\/ijissc.2014070104"},{"key":"IJISSC.2017100103-33","doi-asserted-by":"publisher","DOI":"10.1201\/9780203912232"},{"key":"IJISSC.2017100103-34","doi-asserted-by":"publisher","DOI":"10.4018\/IJITPM.2016010101"},{"key":"IJISSC.2017100103-35","doi-asserted-by":"publisher","DOI":"10.1504\/IJPOM.2013.053153"},{"key":"IJISSC.2017100103-36","doi-asserted-by":"publisher","DOI":"10.4018\/jitpm.2011040105"},{"key":"IJISSC.2017100103-37","doi-asserted-by":"publisher","DOI":"10.4018\/ijitpm.2014100103"},{"key":"IJISSC.2017100103-38","doi-asserted-by":"publisher","DOI":"10.1016\/S0360-1323(03)00067-2"},{"key":"IJISSC.2017100103-39","doi-asserted-by":"publisher","DOI":"10.4018\/IJITPM.2015070102"},{"issue":"1","key":"IJISSC.2017100103-40","first-page":"51","article-title":"Forecasting the trends of financial ratios of Greek construction companies.","volume":"5","author":"A. P.Tsaousoglou","year":"2013","journal-title":"International Journal of Data Analysis and Information Systems"},{"key":"IJISSC.2017100103-41","doi-asserted-by":"publisher","DOI":"10.4018\/ijitpm.2014010102"},{"key":"IJISSC.2017100103-42","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)CO.1943-7862.0000112"},{"key":"IJISSC.2017100103-43","unstructured":"Williams, R. (2008). The development of mathematical models for preliminary prediction of highway construction duration. Unpublished doctoral dissertation, Virginia Polytechnic Institute and State University, Blacksburg, Virginia, USA."}],"container-title":["International Journal of Information Systems and Social Change"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/www.igi-global.com\/viewtitle.aspx?TitleId=186979","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,5,5]],"date-time":"2022-05-05T19:55:11Z","timestamp":1651780511000},"score":1,"resource":{"primary":{"URL":"http:\/\/services.igi-global.com\/resolvedoi\/resolve.aspx?doi=10.4018\/IJISSC.2017100103"}},"subtitle":[""],"short-title":[],"issued":{"date-parts":[[2017,10]]},"references-count":44,"journal-issue":{"issue":"4"},"URL":"https:\/\/doi.org\/10.4018\/ijissc.2017100103","relation":{},"ISSN":["1941-868X","1941-8698"],"issn-type":[{"value":"1941-868X","type":"print"},{"value":"1941-8698","type":"electronic"}],"subject":[],"published":{"date-parts":[[2017,10]]}}}