{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2024,7,28]],"date-time":"2024-07-28T20:30:40Z","timestamp":1722198640998},"reference-count":29,"publisher":"IGI Global","issue":"2","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2018,4,1]]},"abstract":"<p>With the development of China's economy, large-scale engineering and complex engineering are emerging. The Engineering Procurement Construction (EPC) project general contracting model is widely used in civil engineering, water conservancy, railway, water treatment, waste incineration plants and other large engineering area. The increasing complexity of construction technology and the risks are facing overwhelming and fragile supply chain. Based on the deep analysis of supply chain operation reference (SCOR) model, which is widely used in various fields of industry, this article puts forward the preliminary index system of supply chain risk of EPC project by analytic hierarchy process (AHP). The risk index system of waste incineration project including 5 first-level risk indicators and 27 second-level risk indicators has been established and determined. The multi-level grey model is used to evaluate the risk index, calculate the grey evaluation coefficient and the grey evaluation weight vector as well as the weight matrix, draw the specific risk evaluation value of the project, and sort the first level index. Finally, an EPC example of a waste incineration in Hubei Province is used to verify the feasibility and reliability of the method.<\/p>","DOI":"10.4018\/ijisscm.2018040104","type":"journal-article","created":{"date-parts":[[2018,2,19]],"date-time":"2018-02-19T17:17:49Z","timestamp":1519060669000},"page":"54-76","source":"Crossref","is-referenced-by-count":6,"title":["Risk Evaluation of EPC Supply Chain Based on SCOR and Multi-Level Grey Model"],"prefix":"10.4018","volume":"11","author":[{"given":"Cao","family":"Liang","sequence":"first","affiliation":[{"name":"Business School, Hohai University, Nanjing, China"}]},{"given":"Feng","family":"Jingchun","sequence":"additional","affiliation":[{"name":"Business School, Hohai University, Nanjing, China"}]},{"given":"Ren","family":"Yuan","sequence":"additional","affiliation":[{"name":"School of Electronics and Information, Shanghai Dianji University, Shanghai, China"}]}],"member":"2432","reference":[{"key":"IJISSCM.2018040104-0","doi-asserted-by":"publisher","DOI":"10.1504\/IJLEG.2008.023166"},{"key":"IJISSCM.2018040104-1","unstructured":"Bolstorff, P., & Rosenbaum, R. G. (2007). Supply chain excellence: A Handbook for Dramatic Improvement Using the SCOR Model. AMACOM."},{"key":"IJISSCM.2018040104-2","doi-asserted-by":"publisher","DOI":"10.4028\/www.scientific.net\/AMM.848.255"},{"key":"IJISSCM.2018040104-3","doi-asserted-by":"publisher","DOI":"10.1016\/j.jwb.2008.05.003"},{"key":"IJISSCM.2018040104-4","doi-asserted-by":"publisher","DOI":"10.1016\/j.matdes.2006.02.016"},{"key":"IJISSCM.2018040104-5","unstructured":"Circular on Adjusting and Perfecting the Policy of Comprehensive Utilization of Resources and Value-added Tax. (2017). Chinatax.gov.cn. Retrieved 2 July 2017, from http:\/\/www.chinatax.gov.cn\/n810341\/n810765\/n812156\/n812459\/c1185761\/content.html"},{"key":"IJISSCM.2018040104-6","doi-asserted-by":"publisher","DOI":"10.1108\/IJPPM-10-2012-0117"},{"key":"IJISSCM.2018040104-7","doi-asserted-by":"publisher","DOI":"10.1016\/j.jenvman.2014.05.001"},{"issue":"7","key":"IJISSCM.2018040104-8","first-page":"56","article-title":"Alliance contracting eliminates the risks of EPC contracts.","volume":"108","author":"J.Grynbaum","year":"2004","journal-title":"Power Engineering"},{"key":"IJISSCM.2018040104-9","doi-asserted-by":"publisher","DOI":"10.1108\/13598540410517557"},{"key":"IJISSCM.2018040104-10","first-page":"999","article-title":"Developing a new structure for determining time risk priority using risk breakdown matrix in EPC projects. In Proceedings of the","author":"H.Iranmanesh","year":"2007","journal-title":"2007 IEEE International Conference on"},{"key":"IJISSCM.2018040104-11","doi-asserted-by":"publisher","DOI":"10.1016\/j.wasman.2016.06.011"},{"key":"IJISSCM.2018040104-12","unstructured":"Liang, X. (2013). Analysis of International EPC Projects Using SCOR Model. Monete Carlito Simulation, and Relationship Management."},{"key":"IJISSCM.2018040104-13","unstructured":"Liu, Q. J., & Fan, Y. Y. (2012). Construction schedule control evaluation model based on FUZZY-AHP method. Journal of Engineering Management, 6, 015."},{"key":"IJISSCM.2018040104-14","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijpe.2015.08.008"},{"key":"IJISSCM.2018040104-15","doi-asserted-by":"publisher","DOI":"10.1016\/0377-2217(90)90057-I"},{"key":"IJISSCM.2018040104-16","unstructured":"Shailendrakumar, U. K. (2007). Global competitiveness: Role of supply chain management [Doctoral dissertation]. Indian Institute of Management Kozhikode."},{"key":"IJISSCM.2018040104-17","doi-asserted-by":"publisher","DOI":"10.1504\/IJISM.2017.083009"},{"issue":"1","key":"IJISSCM.2018040104-18","first-page":"27","article-title":"The challenge of execution in a Changing World. Vilakshan: The XIMB","volume":"11","author":"M. S.Srinivasan","year":"2014","journal-title":"Journal of Management"},{"key":"IJISSCM.2018040104-19","doi-asserted-by":"publisher","DOI":"10.1108\/09576059710815716"},{"key":"IJISSCM.2018040104-20","doi-asserted-by":"publisher","DOI":"10.1080\/07393148.2016.1228581"},{"key":"IJISSCM.2018040104-21","doi-asserted-by":"publisher","DOI":"10.1016\/S0965-9978(01)00035-7"},{"key":"IJISSCM.2018040104-22","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijpe.2005.12.006"},{"key":"IJISSCM.2018040104-23","author":"N. J.Themelis","year":"2014","journal-title":"2014 Energy and Economic Value of Municipal Solid Waste (Msw), Including Non-Recycled Plastics (Nrp) Currently Landfilled in the Fifty States"},{"key":"IJISSCM.2018040104-24","doi-asserted-by":"publisher","DOI":"10.1080\/09537287.2013.808836"},{"issue":"5","key":"IJISSCM.2018040104-25","first-page":"348","article-title":"Study on Purchasing Process Optimization of Overseas EPC Projects.","volume":"76","author":"C.Wang","year":"2011","journal-title":"Contemporary Logistics"},{"key":"IJISSCM.2018040104-26","unstructured":"Xiang, P., & Ren, H. (2005). Fuzzy Comprehensive Evaluation for Risk of Undertaking Contracted International Project. Mathematics in Practice and Theory, 6, 6-8."},{"key":"IJISSCM.2018040104-27","doi-asserted-by":"publisher","DOI":"10.1109\/CCDC.2011.5968184"},{"key":"IJISSCM.2018040104-28","doi-asserted-by":"publisher","DOI":"10.1016\/j.rser.2015.10.137"}],"container-title":["International Journal of Information Systems and Supply Chain Management"],"original-title":[],"language":"ng","link":[{"URL":"https:\/\/www.igi-global.com\/viewtitle.aspx?TitleId=201189","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,5,6]],"date-time":"2022-05-06T21:52:57Z","timestamp":1651873977000},"score":1,"resource":{"primary":{"URL":"https:\/\/services.igi-global.com\/resolvedoi\/resolve.aspx?doi=10.4018\/IJISSCM.2018040104"}},"subtitle":["A Case Study of China's Waste Incineration Plant Project"],"short-title":[],"issued":{"date-parts":[[2018,4,1]]},"references-count":29,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2018,4]]}},"URL":"https:\/\/doi.org\/10.4018\/ijisscm.2018040104","relation":{},"ISSN":["1935-5726","1935-5734"],"issn-type":[{"value":"1935-5726","type":"print"},{"value":"1935-5734","type":"electronic"}],"subject":[],"published":{"date-parts":[[2018,4,1]]}}}