{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,1,5]],"date-time":"2026-01-05T22:17:16Z","timestamp":1767651436452},"reference-count":28,"publisher":"IGI Global","issue":"3","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2017,7,1]]},"abstract":"<p>The current research has two main objectives: 1) Integration of the system analyst's products together with the project manager's work, via handshaking of software tools used for these tasks (Software modeling tools, Project management tools, as well as Word and Excel files). 2) Simulation of the entire project's problem space subject to organization's policy and constraints in order to achieve best project planning in the given situation. For this purpose, a rule-based system, developed in this study, utilizes a simulation of entire project's problem-space, which is a Cartesian product composed of all system elements (as defined in the software modeling tool), and organization's policy, preferences and constraints, via a specific user interface (see Figure 1). Then the project manager can choose, by simple filtering, the appropriate planning, and the Gantt-chart and all plans' details are automatically exported to the Project Management tool.<\/p>","DOI":"10.4018\/ijitpm.2017070102","type":"journal-article","created":{"date-parts":[[2017,5,23]],"date-time":"2017-05-23T14:11:29Z","timestamp":1495548689000},"page":"22-39","source":"Crossref","is-referenced-by-count":2,"title":["Software Project Planning Through Simulation of Entire Project's Problem-Space"],"prefix":"10.4018","volume":"8","author":[{"given":"Moshe","family":"Dayani","sequence":"first","affiliation":[{"name":"Bar-Ilan University, Graduate School of Business Administration, Ramat Gan, Israel"}]},{"given":"Roy","family":"Gelbard","sequence":"additional","affiliation":[{"name":"Bar-Ilan University, Graduate School of Business Administration, Ramat Gan, Israel"}]}],"member":"2432","reference":[{"key":"IJITPM.2017070102-0","doi-asserted-by":"publisher","DOI":"10.1145\/903893.903944"},{"key":"IJITPM.2017070102-1","doi-asserted-by":"publisher","DOI":"10.1145\/602421.602423"},{"key":"IJITPM.2017070102-2","doi-asserted-by":"publisher","DOI":"10.1016\/j.datak.2005.07.007"},{"key":"IJITPM.2017070102-3","doi-asserted-by":"publisher","DOI":"10.1016\/j.procs.2015.08.465"},{"key":"IJITPM.2017070102-4","first-page":"495","article-title":"Application of modified shortest path algorithm for project duration assessment. Proceedings of the","author":"D.Dobrilovic","year":"2011","journal-title":"6th IEEE International Symposium"},{"key":"IJITPM.2017070102-5","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-642-56209-9"},{"key":"IJITPM.2017070102-6","author":"M.Fowler","year":"1997","journal-title":"UML Distilled: Applying the Standard Object Modeling Language"},{"key":"IJITPM.2017070102-7","doi-asserted-by":"crossref","unstructured":"Gelbard, R., Kantor, J., & Edelist, L. (2008). Integrating Software Engineering and Costing Aspects within Project Management Tools. In, Cartelli A. & Palma M. (Eds.), Encyclopedia of Information and Communication Technologies (pp. 443-456).","DOI":"10.4018\/978-1-59904-845-1.ch059"},{"key":"IJITPM.2017070102-8","doi-asserted-by":"publisher","DOI":"10.1016\/S0263-7863(01)00044-8"},{"key":"IJITPM.2017070102-9","doi-asserted-by":"publisher","DOI":"10.1109\/MS.2009.151"},{"key":"IJITPM.2017070102-10","unstructured":"Gr\u00e8ze, L., Pellerin, R., Leclaire, P., & Perrier, N. (2012). A heuristic method for resource-constrained project scheduling with activity overlapping. Proceedings of CIRRELT \u201812 (p. 75).\u200f"},{"key":"IJITPM.2017070102-11","unstructured":"Hang, L. (2011). The application research on process planning model of product development based on D-CPM Method. Proceedings of theInternational Conference on Management Science and Industrial Engineering (MSIE) (pp. 460-463)."},{"key":"IJITPM.2017070102-12","doi-asserted-by":"publisher","DOI":"10.1109\/COMPSAC.2009.198"},{"key":"IJITPM.2017070102-13","doi-asserted-by":"publisher","DOI":"10.1109\/TEFSE.2009.5069576"},{"issue":"1","key":"IJITPM.2017070102-14","doi-asserted-by":"crossref","first-page":"75","DOI":"10.2307\/25148625","article-title":"Design science in information systems research.","volume":"28","author":"A. R.Hevner","year":"2004","journal-title":"Management Information Systems Quarterly"},{"key":"IJITPM.2017070102-15","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2007.06.024"},{"issue":"4","key":"IJITPM.2017070102-16","doi-asserted-by":"crossref","first-page":"725","DOI":"10.2307\/25148869","article-title":"Design science in the information systems discipline: An introduction to the special issue on design science research.","volume":"32","author":"S. T.March","year":"2008","journal-title":"Management Information Systems Quarterly"},{"key":"IJITPM.2017070102-17","unstructured":"Microsoft. (n. d.). Resource leveling. Retrieved from http:\/\/office.microsoft.com\/en-us\/project-help\/about-resource-leveling-HP001041939.aspx"},{"key":"IJITPM.2017070102-18","doi-asserted-by":"publisher","DOI":"10.4018\/IJITPM.2015100101"},{"key":"IJITPM.2017070102-19","doi-asserted-by":"publisher","DOI":"10.4018\/IJITPM.2016010101"},{"key":"IJITPM.2017070102-20","doi-asserted-by":"crossref","unstructured":"Rose, K. H. (2013), A Guide to the Project Management Body of Knowledge (PMBOK Guide 5th Ed.), Project Management Journal, 44(3), e1.\u200f","DOI":"10.1002\/pmj.21345"},{"key":"IJITPM.2017070102-21","doi-asserted-by":"publisher","DOI":"10.4018\/978-1-60566-026-4.ch252"},{"key":"IJITPM.2017070102-22","author":"I.Sommerville","year":"2011","journal-title":"Software Engineering"},{"key":"IJITPM.2017070102-23","doi-asserted-by":"publisher","DOI":"10.2298\/YJOR0902281S"},{"key":"IJITPM.2017070102-24","doi-asserted-by":"publisher","DOI":"10.1007\/978-3-642-40438-2_3"},{"key":"IJITPM.2017070102-25","author":"T.Weilkiens","year":"2011","journal-title":"Systems engineering with SysML\/UML: modeling, analysis, design"},{"key":"IJITPM.2017070102-26","doi-asserted-by":"publisher","DOI":"10.1016\/S0377-2217(02)00769-5"},{"key":"IJITPM.2017070102-27","doi-asserted-by":"publisher","DOI":"10.1111\/j.1540-5915.1975.tb01041.x"}],"container-title":["International Journal of Information Technology Project Management"],"original-title":[],"language":"ng","link":[{"URL":"https:\/\/www.igi-global.com\/viewtitle.aspx?TitleId=182318","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,5,6]],"date-time":"2022-05-06T20:49:05Z","timestamp":1651870145000},"score":1,"resource":{"primary":{"URL":"https:\/\/services.igi-global.com\/resolvedoi\/resolve.aspx?doi=10.4018\/IJITPM.2017070102"}},"subtitle":[""],"short-title":[],"issued":{"date-parts":[[2017,7,1]]},"references-count":28,"journal-issue":{"issue":"3","published-print":{"date-parts":[[2017,7]]}},"URL":"https:\/\/doi.org\/10.4018\/ijitpm.2017070102","relation":{},"ISSN":["1938-0232","1938-0240"],"issn-type":[{"value":"1938-0232","type":"print"},{"value":"1938-0240","type":"electronic"}],"subject":[],"published":{"date-parts":[[2017,7,1]]}}}