{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,11,19]],"date-time":"2025-11-19T19:25:41Z","timestamp":1763580341812,"version":"3.41.0"},"reference-count":51,"publisher":"IGI Global","issue":"3","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2017,7,1]]},"abstract":"<p>Although buffer sizing is one of the most investigated subjects in Critical Chain Project Management (CCPM), almost all the focus has been on its implications for single-project environments. Among the entire invented buffer sizing methods, the cut and paste method (C&amp;PM) is the most accepted by practitioners and long-established CCPM software packages. This study concentrates on the use of C&amp;PM in CCPM portfolios with different resource capacities with the aim of examining the performance of this method and identifying the most appropriate sizes of project and feeding buffers. This aim is pursued through considering ten different levels of resource capacity, conducting Monte Carlo simulations of randomly generated project data and comparing the results with deterministic duration values of the same portfolios with 30%, 40% and 50% buffer sizes. As a significant contribution, this study recommends what buffer sizes should be allotted in CCPM portfolios with different resource capacities.<\/p>","DOI":"10.4018\/ijitpm.2017070103","type":"journal-article","created":{"date-parts":[[2017,5,23]],"date-time":"2017-05-23T14:11:29Z","timestamp":1495548689000},"page":"40-51","source":"Crossref","is-referenced-by-count":4,"title":["Buffer Sizing in CCPM Portfolios with Different Resource Capacities"],"prefix":"10.4018","volume":"8","author":[{"given":"Mahdi","family":"Ghaffari","sequence":"first","affiliation":[{"name":"University of Manchester, Manchester, United Kingdom"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Margaret W.","family":"Emsley","sequence":"additional","affiliation":[{"name":"University of Manchester, Manchester, United Kingdom"}],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"2432","reference":[{"key":"IJITPM.2017070103-0","doi-asserted-by":"publisher","DOI":"10.4018\/ijitpm.2014070104"},{"key":"IJITPM.2017070103-1","doi-asserted-by":"crossref","unstructured":"Ashtiani, B., Jalali, G. R., Aryanezhad, M. B., & Makuti, A. (2007, December 2-4). A new approach for buffer sizing in critical chain scheduling. Proceedings of the 2007 IEEE International Conference on Industrial Engineering and Engineering Management (pp. 1037-1041).","DOI":"10.1109\/IEEM.2007.4419350"},{"key":"IJITPM.2017070103-2","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2011.649096"},{"key":"IJITPM.2017070103-3","unstructured":"Caron, F., & Mancini, M. (2008). Project buffer sizing through historical errors. Retrieved from http:\/\/www.aice-it.org\/en\/download\/doc_view\/26-ingegneria-economica-n-79-all-1"},{"key":"IJITPM.2017070103-4","doi-asserted-by":"publisher","DOI":"10.1287\/mnsc.17.12.B803"},{"key":"IJITPM.2017070103-5","doi-asserted-by":"publisher","DOI":"10.1023\/A:1022283403119"},{"issue":"1","key":"IJITPM.2017070103-6","first-page":"73","article-title":"Buffer sizing for the critical chain project management method.","volume":"19","author":"A.Geekie","year":"2008","journal-title":"South African Journal of Industrial Engineering"},{"key":"IJITPM.2017070103-7","doi-asserted-by":"publisher","DOI":"10.1016\/j.sorms.2015.10.001"},{"journal-title":"Critical chain","year":"1997","author":"E. M.Goldratt","key":"IJITPM.2017070103-8"},{"key":"IJITPM.2017070103-9","doi-asserted-by":"publisher","DOI":"10.1016\/S0272-6963(01)00054-7"},{"key":"IJITPM.2017070103-10","doi-asserted-by":"publisher","DOI":"10.2307\/3007883"},{"key":"IJITPM.2017070103-11","doi-asserted-by":"publisher","DOI":"10.1016\/S0305-0548(97)00055-5"},{"journal-title":"Multi-project management","year":"2013","author":"G. I.Kendall","key":"IJITPM.2017070103-12"},{"journal-title":"Project management the managerial process","year":"2011","author":"E. W.Larson","key":"IJITPM.2017070103-13"},{"issue":"2","key":"IJITPM.2017070103-14","doi-asserted-by":"crossref","first-page":"39","DOI":"10.1177\/875697289903000207","article-title":"Critical chain project management improves project performance.","volume":"30","author":"L. P.Leach","year":"1999","journal-title":"Project Management Journal"},{"journal-title":"Critical chain project management","year":"2000","author":"L. P.Leach","key":"IJITPM.2017070103-15"},{"issue":"2","key":"IJITPM.2017070103-16","doi-asserted-by":"crossref","first-page":"34","DOI":"10.1177\/875697280303400205","article-title":"Schedule and cost buffer sizing: How to account for the bias between project performance and your model.","volume":"34","author":"L. P.Leach","year":"2003","journal-title":"Project Management Journal"},{"journal-title":"Lean project management: 8 Principles for Success","year":"2005","author":"L. P.Leach","key":"IJITPM.2017070103-17"},{"journal-title":"Critical chain project management","year":"2014","author":"L. P.Leach","key":"IJITPM.2017070103-18"},{"journal-title":"Lean project leadership","year":"2010","author":"L. P.Leach","key":"IJITPM.2017070103-19"},{"key":"IJITPM.2017070103-20","doi-asserted-by":"publisher","DOI":"10.1080\/10429247.2005.11431672"},{"key":"IJITPM.2017070103-21","unstructured":"Levine, R. I. (1984). Statistics for management (3rd ed.). New Jersey: Prentice-Hall Inc."},{"key":"IJITPM.2017070103-22","unstructured":"Lock, D. (2007). Project management (9th ed.). Burlington: Gower Publishing."},{"key":"IJITPM.2017070103-23","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijproman.2007.09.012"},{"journal-title":"Research Methods: A practical guide for the social researchers","year":"2010","author":"B.Matthews","key":"IJITPM.2017070103-24"},{"key":"IJITPM.2017070103-25","doi-asserted-by":"crossref","unstructured":"Min, Z., & Rongqiu, C. (2008, October 12-14). Buffer sized technique in critical chain management: A fuzzy approach. Proceedings of the 4th International Conference on Wireless Communications, Networking and Mobile Computing WiCOM '08.","DOI":"10.1109\/WiCom.2008.1742"},{"key":"IJITPM.2017070103-26","doi-asserted-by":"publisher","DOI":"10.1287\/opre.29.4.676"},{"key":"IJITPM.2017070103-27","doi-asserted-by":"publisher","DOI":"10.1002\/9781118536698"},{"key":"IJITPM.2017070103-28","doi-asserted-by":"crossref","DOI":"10.1201\/b18205","author":"R. C.Newbold","year":"1998","journal-title":"Project management in the fast lane: Applying the theory of constraints"},{"journal-title":"The billion dollar solution","year":"2008","author":"R. C.Newbold","key":"IJITPM.2017070103-29"},{"key":"IJITPM.2017070103-30","doi-asserted-by":"publisher","DOI":"10.3923\/itj.2012.829.839"},{"journal-title":"Project management: Achieving competitive advantage","year":"2007","author":"J. K.Pinto","key":"IJITPM.2017070103-31"},{"key":"IJITPM.2017070103-32","doi-asserted-by":"publisher","DOI":"10.1016\/0166-4972(89)90040-0"},{"key":"IJITPM.2017070103-33","doi-asserted-by":"publisher","DOI":"10.1287\/mnsc.16.1.93"},{"key":"IJITPM.2017070103-34","unstructured":"Product Development Institute. (1999). A tutorial on critical chain. [online]. Retrieved from http:\/\/materias.fi.uba.ar\/7546\/material\/Tutorial_critical_chain.pdf"},{"key":"IJITPM.2017070103-35","doi-asserted-by":"crossref","first-page":"24","DOI":"10.1177\/875697280303400404","article-title":"A critical look at critical chain project management.","volume":"34","author":"T.Raz","year":"2003","journal-title":"Project Management Journal"},{"journal-title":"Research methods for business students","year":"2009","author":"M.Saunders","key":"IJITPM.2017070103-36"},{"key":"IJITPM.2017070103-37","doi-asserted-by":"publisher","DOI":"10.1016\/0048-7333(95)00877-2"},{"key":"IJITPM.2017070103-38","doi-asserted-by":"publisher","DOI":"10.1111\/1467-9310.00244"},{"key":"IJITPM.2017070103-39","doi-asserted-by":"publisher","DOI":"10.1109\/AICI.2009.192"},{"key":"IJITPM.2017070103-40","doi-asserted-by":"publisher","DOI":"10.4018\/IJITPM.2016070105"},{"key":"IJITPM.2017070103-41","doi-asserted-by":"publisher","DOI":"10.1016\/S0263-7863(00)00026-0"},{"key":"IJITPM.2017070103-42","doi-asserted-by":"publisher","DOI":"10.1016\/S0263-7863(00)00054-5"},{"key":"IJITPM.2017070103-43","article-title":"Critical chain project management: A new approach for time buffer sizing.","author":"A.Tenera","year":"2007","journal-title":"Proc. of the Institute of Industrial Engineering Annual Conference"},{"key":"IJITPM.2017070103-44","doi-asserted-by":"crossref","first-page":"27","DOI":"10.1177\/875697280503600104","article-title":"Why a critical path by any other name would smell less sweet?","volume":"36","author":"D.Trietsch","year":"2005","journal-title":"Project Management Journal"},{"key":"IJITPM.2017070103-45","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2004.10.019"},{"journal-title":"The critical chain implementation handbook","year":"2014","author":"D.Updegrove","key":"IJITPM.2017070103-46"},{"key":"IJITPM.2017070103-47","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2007.11.008"},{"journal-title":"Revolutionizing product development","year":"1992","author":"S. C.Wheelwright","key":"IJITPM.2017070103-48"},{"issue":"1","key":"IJITPM.2017070103-49","first-page":"100","article-title":"Software development projects IRSE buffer settings and simulation based on critical chain.","volume":"17","author":"X.Xue-mei","year":"2010","journal-title":"Journal of China Universities of Posts and Telecommunications"},{"key":"IJITPM.2017070103-50","article-title":"The difference between different types of projects.","author":"R.Youker","year":"1999","journal-title":"Proceedings of the 30th Annual Project Management Institute Seminars & Symposium"}],"container-title":["International Journal of Information Technology Project Management"],"original-title":[],"language":"ng","link":[{"URL":"https:\/\/www.igi-global.com\/viewtitle.aspx?TitleId=182319","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2025,6,18]],"date-time":"2025-06-18T19:23:10Z","timestamp":1750274590000},"score":1,"resource":{"primary":{"URL":"https:\/\/services.igi-global.com\/resolvedoi\/resolve.aspx?doi=10.4018\/IJITPM.2017070103"}},"subtitle":[""],"short-title":[],"issued":{"date-parts":[[2017,7,1]]},"references-count":51,"journal-issue":{"issue":"3","published-print":{"date-parts":[[2017,7]]}},"URL":"https:\/\/doi.org\/10.4018\/ijitpm.2017070103","relation":{},"ISSN":["1938-0232","1938-0240"],"issn-type":[{"type":"print","value":"1938-0232"},{"type":"electronic","value":"1938-0240"}],"subject":[],"published":{"date-parts":[[2017,7,1]]}}}