{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2022,5,6]],"date-time":"2022-05-06T12:35:36Z","timestamp":1651840536110},"reference-count":23,"publisher":"IGI Global","issue":"1","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2018,1]]},"abstract":"<jats:p>Repetitive construction activities have the same activities which are performed repeatedly. Repetitive projects include: pipelines, highways, and multi-story buildings. Repetitive projects have been modelled widely using the traditional network techniques although, they have some disadvantages. Furthermore, different approached have been developed for repetitive activities including the graphical and analytical techniques. The objective of this research is to add new enhancements on an approach called Repetitive Project Model (RPM) which is related to the repetitive construction projects. The enhancements incorporating the incentives and penalties within the RPM. This model incorporates a network technique, a graphical technique, and an analytical technique. A numerical example was demonstrated in this research paper to aid on using the suggested model in the real-life application.<\/jats:p>","DOI":"10.4018\/ijoris.2018010101","type":"journal-article","created":{"date-parts":[[2017,11,9]],"date-time":"2017-11-09T16:44:05Z","timestamp":1510245845000},"page":"1-21","source":"Crossref","is-referenced-by-count":1,"title":["Repetitive Project Modelling With Penalty and Incentive"],"prefix":"10.4018","volume":"9","author":[{"given":"Mohammed","family":"Shurrab","sequence":"first","affiliation":[{"name":"Department of Mechanical Engineering, Kyushu University, Fukuoka, Japan"}]},{"given":"Ghaleb Y.","family":"Abbasi","sequence":"additional","affiliation":[{"name":"Department of Industrial Engineering, University of Jordan, Amman, Jordan"}]},{"given":"Osama","family":"Eljamal","sequence":"additional","affiliation":[{"name":"Department of Earth System Science and Technology, Kyushu University, Fukuoka, Japan"}]},{"given":"Jalal T.","family":"Tanatrah","sequence":"additional","affiliation":[{"name":"Department of Industrial Engineering, University of Jordan, Amman, Jordan"}]}],"member":"2432","reference":[{"key":"IJORIS.2018010101-0","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(1986)112:3(411)"},{"key":"IJORIS.2018010101-1","doi-asserted-by":"publisher","DOI":"10.1016\/j.aej.2012.11.003"},{"key":"IJORIS.2018010101-2","doi-asserted-by":"publisher","DOI":"10.1016\/j.aej.2013.08.003"},{"key":"IJORIS.2018010101-3","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijproman.2015.04.003"},{"key":"IJORIS.2018010101-4","doi-asserted-by":"publisher","DOI":"10.1016\/S0263-7863(01)00078-3"},{"key":"IJORIS.2018010101-5","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(1986)112:4(476)"},{"key":"IJORIS.2018010101-6","author":"R. H.Clough","year":"2000","journal-title":"Construction project management"},{"key":"IJORIS.2018010101-7","doi-asserted-by":"publisher","DOI":"10.4018\/joris.2012100103"},{"key":"IJORIS.2018010101-8","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijproman.2014.10.015"},{"key":"IJORIS.2018010101-9","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(1994)120:3(603)"},{"key":"IJORIS.2018010101-10","author":"J.Heagney","year":"2016","journal-title":"Fundamentals of project management"},{"key":"IJORIS.2018010101-11","author":"J.Hickson Robin","year":"2015","journal-title":"Project Management for Mining: Handbook for Delivering Project Success"},{"key":"IJORIS.2018010101-12","doi-asserted-by":"publisher","DOI":"10.1007\/BF02941255"},{"issue":"2","key":"IJORIS.2018010101-13","doi-asserted-by":"crossref","DOI":"10.1061\/JCCEAZ.0000960","article-title":"Linear scheduling method for highway construction.","volume":"107","author":"D. W.Johnston","year":"1981","journal-title":"Journal of the Construction Division"},{"key":"IJORIS.2018010101-14","doi-asserted-by":"crossref","unstructured":"Maji, A., & Jha, M. K. (2013). Highway alignment optimization using cost-benefit analysis under user equilibrium. In Optimizing, Innovating, and Capitalizing on Information Systems for Operations (pp. 313-327).","DOI":"10.4018\/978-1-4666-2925-7.ch016"},{"key":"IJORIS.2018010101-15","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijproman.2011.08.005"},{"key":"IJORIS.2018010101-16","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(1985)111:2(105)"},{"key":"IJORIS.2018010101-17","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(1990)116:2(316)"},{"key":"IJORIS.2018010101-18","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(1988)114:1(36)"},{"key":"IJORIS.2018010101-19","doi-asserted-by":"crossref","DOI":"10.1007\/978-3-319-05443-8","volume":"Vol. 2","author":"C.Schwindt","year":"2015","journal-title":"Handbook on Project Management and Scheduling"},{"key":"IJORIS.2018010101-20","author":"S. K.Sears","year":"2015","journal-title":"Construction project management"},{"key":"IJORIS.2018010101-21","author":"C.Srisuwanrat","year":"2009","journal-title":"The Sequence Step Algorithm: A Simulation-based Scheduling Algorithm for Repetitive Projects with Probabilistic Activity Durations"},{"key":"IJORIS.2018010101-22","first-page":"365","article-title":"Resource-driven scheduling for repetitive projects: A pull-system approach.","author":"I. T.Yang","year":"2001","journal-title":"Proceedings of the 9th International Group for Lean Construction Conference"}],"container-title":["International Journal of Operations Research and Information Systems"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/www.igi-global.com\/viewtitle.aspx?TitleId=193047","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,5,5]],"date-time":"2022-05-05T22:03:22Z","timestamp":1651788202000},"score":1,"resource":{"primary":{"URL":"http:\/\/services.igi-global.com\/resolvedoi\/resolve.aspx?doi=10.4018\/IJORIS.2018010101"}},"subtitle":[""],"short-title":[],"issued":{"date-parts":[[2018,1]]},"references-count":23,"journal-issue":{"issue":"1"},"URL":"https:\/\/doi.org\/10.4018\/ijoris.2018010101","relation":{},"ISSN":["1947-9328","1947-9336"],"issn-type":[{"value":"1947-9328","type":"print"},{"value":"1947-9336","type":"electronic"}],"subject":[],"published":{"date-parts":[[2018,1]]}}}