{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,6,10]],"date-time":"2026-06-10T16:46:21Z","timestamp":1781109981101,"version":"3.54.1"},"reference-count":46,"publisher":"IGI Global Scientific Publishing","issue":"3","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2019,7]]},"abstract":"<jats:p>Logistics firms are exposed several domestic and global risks such as variability in demand, shipment damages, earthquakes, and terrorist attacks. The purpose of this study is to provide an approach for selecting a logistics firm based on logistics risk factors according to the manufacturing firms' perspectives. An analytical network process method is utilized to determine risk factors' importance levels and VIKOR method is used to select the logistics firm. The study results show that the most important logistics risk factors are customer and supplier, and the least risky logistic firm is B. It can be concluded that the proposed model enables managers to examine potential risks influencing their logistics activities and select the logistics firm having minimum risk.<\/jats:p>","DOI":"10.4018\/ijoris.2019070103","type":"journal-article","created":{"date-parts":[[2019,5,17]],"date-time":"2019-05-17T05:12:02Z","timestamp":1558069922000},"page":"31-43","source":"Crossref","is-referenced-by-count":0,"title":["Firm Selection Based on Logistics Risk Factors"],"prefix":"10.4018","volume":"10","author":[{"given":"Iskender","family":"Peker","sequence":"first","affiliation":[{"name":"Department of Business Administration, Gumushane University, Gumushane, Turkey"}],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Selcuk","family":"Korucuk","sequence":"additional","affiliation":[{"name":"Department of Transportation Services, Gumushane University, Gumushane, Turkey"}],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Birdogan","family":"Baki","sequence":"additional","affiliation":[{"name":"Department of Business Administration, Karadeniz Technical University, Trabzon, Turkey"}],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"2432","reference":[{"key":"IJORIS.2019070103-0","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2004.12.005"},{"key":"IJORIS.2019070103-1","doi-asserted-by":"publisher","DOI":"10.1016\/0377-2217(90)90058-J"},{"key":"IJORIS.2019070103-2","doi-asserted-by":"publisher","DOI":"10.1109\/TEM.1986.6447649"},{"key":"IJORIS.2019070103-3","doi-asserted-by":"publisher","DOI":"10.1016\/0305-0483(81)90018-9"},{"key":"IJORIS.2019070103-4","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijpe.2011.01.002"},{"key":"IJORIS.2019070103-5","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijpe.2006.12.017"},{"key":"IJORIS.2019070103-6","doi-asserted-by":"crossref","unstructured":"B\u00fcy\u00fck\u00f6zkan, G., & Ruan D. (2008). Evaluation of Software Development Projects Using a Fuzzy Multi Criteria Decision Approach. Mathematics an Computers in Simulation, 77, 464-475.","DOI":"10.1016\/j.matcom.2007.11.015"},{"key":"IJORIS.2019070103-7","doi-asserted-by":"publisher","DOI":"10.1108\/09600030410545427"},{"key":"IJORIS.2019070103-8","doi-asserted-by":"publisher","DOI":"10.1080\/0144619042000202852"},{"issue":"1","key":"IJORIS.2019070103-9","first-page":"53","article-title":"Managing Risk to Avoid Supply-Chain Breakdown.","volume":"46","author":"S.Chopra","year":"2004","journal-title":"MIT Sloan Management"},{"key":"IJORIS.2019070103-10","doi-asserted-by":"publisher","DOI":"10.1108\/09600030410545436"},{"key":"IJORIS.2019070103-11","doi-asserted-by":"publisher","DOI":"10.1108\/09574090410700275"},{"key":"IJORIS.2019070103-12","doi-asserted-by":"publisher","DOI":"10.1108\/17410380610678756"},{"key":"IJORIS.2019070103-13","doi-asserted-by":"crossref","unstructured":"Dickson, G.W. (1966). An Analysis of Vendor Selection Systems and Decisions. Journal of Purchasing, 5-17.","DOI":"10.1111\/j.1745-493X.1966.tb00818.x"},{"key":"IJORIS.2019070103-14","doi-asserted-by":"publisher","DOI":"10.1016\/j.pec.2008.07.032"},{"key":"IJORIS.2019070103-15","first-page":"233","article-title":"Risk Management in Logistics Systems.","volume":"4","author":"H.Fuchs","year":"2009","journal-title":"Advances in Production Engineering & Management"},{"key":"IJORIS.2019070103-16","doi-asserted-by":"publisher","DOI":"10.1108\/09574090610663464"},{"key":"IJORIS.2019070103-17","doi-asserted-by":"publisher","DOI":"10.1016\/S0925-5273(97)00009-1"},{"key":"IJORIS.2019070103-18","doi-asserted-by":"publisher","DOI":"10.1108\/09600030410567504"},{"key":"IJORIS.2019070103-19","doi-asserted-by":"publisher","DOI":"10.1108\/09600030410567478"},{"key":"IJORIS.2019070103-20","author":"J.Heizer","year":"2006","journal-title":"Principles of Operations Management"},{"key":"IJORIS.2019070103-21","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2015.1030467"},{"key":"IJORIS.2019070103-22","doi-asserted-by":"crossref","unstructured":"J\u00fcttner, U. (2005). Supply Chain Risk Management Understanding the Business Requirements from a Practitioner Perspective. The International Journal of Logistics Management, 16(1), 120-141.","DOI":"10.1108\/09574090510617385"},{"key":"IJORIS.2019070103-23","doi-asserted-by":"publisher","DOI":"10.1080\/13675560310001627016"},{"issue":"1","key":"IJORIS.2019070103-24","first-page":"9908","article-title":"VIKOR Method with Enhanced Accuracy for Multiple Criteria Decision Making in Healthcare Management.","volume":"37","author":"Q.Lin","year":"2013","journal-title":"Journal of Medical Systems"},{"key":"IJORIS.2019070103-25","doi-asserted-by":"publisher","DOI":"10.4018\/IJISSS.2016070103"},{"key":"IJORIS.2019070103-26","doi-asserted-by":"publisher","DOI":"10.1108\/09600030810866986"},{"key":"IJORIS.2019070103-27","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijforecast.2003.09.013"},{"key":"IJORIS.2019070103-28","doi-asserted-by":"publisher","DOI":"10.1108\/03684921011043198"},{"key":"IJORIS.2019070103-29","doi-asserted-by":"publisher","DOI":"10.1016\/S0377-2217(03)00020-1"},{"key":"IJORIS.2019070103-30","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2006.01.020"},{"key":"IJORIS.2019070103-31","doi-asserted-by":"publisher","DOI":"10.1108\/09600031111175816"},{"key":"IJORIS.2019070103-32","doi-asserted-by":"publisher","DOI":"10.1108\/09600039410066141"},{"key":"IJORIS.2019070103-33","doi-asserted-by":"publisher","DOI":"10.4018\/ijisss.2015040105"},{"key":"IJORIS.2019070103-34","author":"T. L.Saaty","year":"2006","journal-title":"Decision Making with the Analytic Network Process: Economic, Political, Social and Technological Applications with Benefits, Opportunities, Costs and Risks"},{"key":"IJORIS.2019070103-35","doi-asserted-by":"publisher","DOI":"10.1080\/00207543.2012.741330"},{"key":"IJORIS.2019070103-36","unstructured":"Sheffi, Y., Rice, J. B., Fleck, J. M., & Caniato, F. (2006). Supply Chain Response to Global Terorism: A Situation Scan. EurOMA POMS Joint International Conference, Milano, Italy. Retrieved from web.mit.edu\/scresponse"},{"key":"IJORIS.2019070103-37","doi-asserted-by":"publisher","DOI":"10.1016\/S0305-0483(00)00039-6"},{"key":"IJORIS.2019070103-38","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijpe.2005.12.006"},{"key":"IJORIS.2019070103-39","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijpe.2008.07.008"},{"key":"IJORIS.2019070103-40","doi-asserted-by":"crossref","unstructured":"Vahdani, B., Hadipour, H., Sadaghiani, J.S., & Amiri, M. (2010). Extension of VIKOR method based on interval-valued fuzzy sets. International Journal of Advanced Manufacturing Technology, 47(9-12), 1231-1239.","DOI":"10.1007\/s00170-009-2241-2"},{"key":"IJORIS.2019070103-41","doi-asserted-by":"publisher","DOI":"10.1016\/S0272-6963(02)00039-6"},{"key":"IJORIS.2019070103-42","doi-asserted-by":"publisher","DOI":"10.4018\/jisscm.2009010102"},{"key":"IJORIS.2019070103-43","doi-asserted-by":"publisher","DOI":"10.1016\/0377-2217(91)90033-R"},{"key":"IJORIS.2019070103-44","doi-asserted-by":"publisher","DOI":"10.1111\/j.1745-493X.2003.tb00156.x"},{"key":"IJORIS.2019070103-45","doi-asserted-by":"publisher","DOI":"10.1016\/0164-1212(93)90119-I"}],"container-title":["International Journal of Operations Research and Information Systems"],"original-title":[],"language":"en","link":[{"URL":"https:\/\/www.igi-global.com\/viewtitle.aspx?TitleId=229428","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,5,6]],"date-time":"2022-05-06T02:13:50Z","timestamp":1651803230000},"score":1,"resource":{"primary":{"URL":"http:\/\/services.igi-global.com\/resolvedoi\/resolve.aspx?doi=10.4018\/IJORIS.2019070103"}},"subtitle":["A Multiple Criteria Decision Making Approach"],"short-title":[],"issued":{"date-parts":[[2019,7]]},"references-count":46,"journal-issue":{"issue":"3"},"URL":"https:\/\/doi.org\/10.4018\/ijoris.2019070103","relation":{},"ISSN":["1947-9328","1947-9336"],"issn-type":[{"value":"1947-9328","type":"print"},{"value":"1947-9336","type":"electronic"}],"subject":[],"published":{"date-parts":[[2019,7]]}}}