{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,6,10]],"date-time":"2026-06-10T15:55:07Z","timestamp":1781106907962,"version":"3.54.1"},"reference-count":38,"publisher":"IGI Global Scientific Publishing","issue":"1","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2012,1,1]]},"abstract":"<p>In this paper, cellular manufacturing scheduling problems are studied. The objective is to minimize makespan (Cmax) considering part family in the manufacturing cell flow line where the setup times are sequence dependent. Minimizing Cmax will result in the increment of output rate and the speed of manufacturing systems which is the main goal of such systems. This problem is solved using Ant Colony Optimization (ACO), Genetic Algorithm (GA) operators, and local search technique. To show the validity of proposed approach, it is compared with a tailor-made heuristic algorithm, called SVS. The obtained results indicate that the proposed method is quite fast and efficient.<\/p>","DOI":"10.4018\/jamc.2012010105","type":"journal-article","created":{"date-parts":[[2012,4,5]],"date-time":"2012-04-05T09:10:02Z","timestamp":1333617002000},"page":"48-64","source":"Crossref","is-referenced-by-count":15,"title":["Scheduling Cellular Manufacturing Systems Using ACO and GA"],"prefix":"10.4018","volume":"3","author":[{"given":"Mohammad T.","family":"Taghavifard","sequence":"first","affiliation":[{"name":"Allameh Tabataba\u2019i University, Iran"}],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"2432","reference":[{"key":"jamc.2012010105-0","doi-asserted-by":"publisher","DOI":"10.1016\/0895-7177(90)90368-W"},{"key":"jamc.2012010105-1","unstructured":"Chien, C. H. (1997). Scheduling in a flow line manufacturing cells system considering intercellular parts: The tabu search approach (Unpublished doctoral dissertation). University of Texas, Arlington, TX."},{"key":"jamc.2012010105-2","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijpe.2004.07.006"},{"key":"jamc.2012010105-3","first-page":"11","article-title":"The ant colony optimization meta-heuristic","author":"M.Dorigo","year":"1999","journal-title":"New ideas in optimization"},{"key":"jamc.2012010105-4","doi-asserted-by":"crossref","DOI":"10.7551\/mitpress\/1290.001.0001","author":"M.Dorigo","year":"2004","journal-title":"Ant colony optimization"},{"key":"jamc.2012010105-5","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2003.11.004"},{"key":"jamc.2012010105-6","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijpe.2005.01.003"},{"key":"jamc.2012010105-7","doi-asserted-by":"crossref","first-page":"163","DOI":"10.1057\/palgrave.jors.2601971","article-title":"Minimizing flow time in a flow-line manufacturing cell with family setup times.","volume":"57","author":"J. N. D.Gupta","year":"2006","journal-title":"The Journal of the Operational Research Society"},{"key":"jamc.2012010105-8","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijpe.2007.02.031"},{"key":"jamc.2012010105-9","first-page":"419","article-title":"Operation scheduling for group technology applications.","volume":"26","author":"K.Hitomi","year":"1976","journal-title":"Annals of the CIRP"},{"key":"jamc.2012010105-10","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijpe.2007.06.007"},{"key":"jamc.2012010105-11","doi-asserted-by":"publisher","DOI":"10.1016\/j.cor.2007.12.010"},{"key":"jamc.2012010105-12","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijpe.2004.03.011"},{"key":"jamc.2012010105-13","doi-asserted-by":"publisher","DOI":"10.1016\/0925-5273(94)00083-M"},{"key":"jamc.2012010105-14","doi-asserted-by":"publisher","DOI":"10.1016\/0925-5273(91)90098-E"},{"key":"jamc.2012010105-15","doi-asserted-by":"publisher","DOI":"10.1016\/j.cor.2004.07.004"},{"key":"jamc.2012010105-16","doi-asserted-by":"publisher","DOI":"10.1080\/00207549108948058"},{"key":"jamc.2012010105-17","doi-asserted-by":"publisher","DOI":"10.1007\/s001700050149"},{"key":"jamc.2012010105-18","doi-asserted-by":"publisher","DOI":"10.1016\/S0360-8352(00)00003-6"},{"key":"jamc.2012010105-19","doi-asserted-by":"publisher","DOI":"10.1016\/j.cor.2009.04.013"},{"key":"jamc.2012010105-20","doi-asserted-by":"publisher","DOI":"10.1080\/002075400189419"},{"key":"jamc.2012010105-21","doi-asserted-by":"publisher","DOI":"10.1016\/S0360-8352(01)00049-3"},{"key":"jamc.2012010105-22","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijpe.2004.10.020"},{"key":"jamc.2012010105-23","doi-asserted-by":"publisher","DOI":"10.1016\/S0377-2217(99)00387-2"},{"key":"jamc.2012010105-24","doi-asserted-by":"crossref","first-page":"226","DOI":"10.15807\/jorsj.26.226","article-title":"Optimal schedule in a GT-type flow-shop under series-parallel precedence constraints.","volume":"26","author":"Y.Sekiguchi","year":"1983","journal-title":"Journal of the Operations Research Society of Japan"},{"key":"jamc.2012010105-25","doi-asserted-by":"publisher","DOI":"10.1080\/00207549308956819"},{"key":"jamc.2012010105-26","doi-asserted-by":"publisher","DOI":"10.1016\/S0925-5273(03)00196-8"},{"key":"jamc.2012010105-27","doi-asserted-by":"publisher","DOI":"10.1080\/00207549308956908"},{"key":"jamc.2012010105-28","doi-asserted-by":"publisher","DOI":"10.1016\/0360-8352(94)90336-0"},{"key":"jamc.2012010105-29","first-page":"251","article-title":"The ant colony optimization metaheuristic: Algorithms, applications, and advances","author":"T.Stutzle","year":"2003","journal-title":"Handbook of metaheuristics"},{"key":"jamc.2012010105-30","doi-asserted-by":"publisher","DOI":"10.1016\/j.eswa.2009.08.012"},{"key":"jamc.2012010105-31","author":"P.Venkumar","year":"2012","journal-title":"Design of cellular manufacturing system using non-traditional optimization algorithms"},{"key":"jamc.2012010105-32","doi-asserted-by":"publisher","DOI":"10.1080\/00207548908942637"},{"key":"jamc.2012010105-33","doi-asserted-by":"publisher","DOI":"10.1080\/07408179108963871"},{"key":"jamc.2012010105-34","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2007.08.003"},{"key":"jamc.2012010105-35","doi-asserted-by":"publisher","DOI":"10.1016\/S0305-0548(99)00070-2"},{"key":"jamc.2012010105-36","doi-asserted-by":"publisher","DOI":"10.1016\/0305-0548(96)00003-2"},{"key":"jamc.2012010105-37","doi-asserted-by":"crossref","first-page":"261","DOI":"10.1080\/05695557908974469","article-title":"Optimal two-stage production scheduling with setup times separated.","volume":"11","author":"T.Yoshida","year":"1979","journal-title":"AIIE Transactions"}],"container-title":["International Journal of Applied Metaheuristic Computing"],"original-title":[],"language":"ng","link":[{"URL":"https:\/\/www.igi-global.com\/viewtitle.aspx?TitleId=64644","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,6,1]],"date-time":"2022-06-01T14:11:37Z","timestamp":1654092697000},"score":1,"resource":{"primary":{"URL":"https:\/\/services.igi-global.com\/resolvedoi\/resolve.aspx?doi=10.4018\/jamc.2012010105"}},"subtitle":[""],"short-title":[],"issued":{"date-parts":[[2012,1,1]]},"references-count":38,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2012,1]]}},"URL":"https:\/\/doi.org\/10.4018\/jamc.2012010105","relation":{},"ISSN":["1947-8283","1947-8291"],"issn-type":[{"value":"1947-8283","type":"print"},{"value":"1947-8291","type":"electronic"}],"subject":[],"published":{"date-parts":[[2012,1,1]]}}}