{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,6,10]],"date-time":"2026-06-10T16:56:51Z","timestamp":1781110611456,"version":"3.54.1"},"reference-count":26,"publisher":"IGI Global Scientific Publishing","issue":"2","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2012,4,1]]},"abstract":"<p>Numerous difficulties and problems are associated with learning in a project. To tackle these problems, in this paper, an integrated project management model is constructed for facilitating knowledge learning. First, the depth of a professional or management skill is defined and evaluated using the analytic hierarchical procedure. A project cannot start until the depth of every necessary skill reaches a certain level. There is also stepwise increase in the scores of successive projects. A systematic procedure composed of fifteen steps is then embedded in the system to facilitate project learning. The proposed methodology is applied to the development of an e-commerce application system.<\/p>","DOI":"10.4018\/jeis.2012040103","type":"journal-article","created":{"date-parts":[[2012,5,16]],"date-time":"2012-05-16T10:04:41Z","timestamp":1337162681000},"page":"30-51","source":"Crossref","is-referenced-by-count":8,"title":["An Integrated Project Management System for Facilitating Knowledge Learning"],"prefix":"10.4018","volume":"8","author":[{"given":"Toly","family":"Chen","sequence":"first","affiliation":[{"name":"Feng Chia University, Taiwan"}],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Yu-Cheng","family":"Wang","sequence":"additional","affiliation":[{"name":"Feng Chia University, Taiwan"}],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"2432","reference":[{"key":"jeis.2012040103-0","doi-asserted-by":"publisher","DOI":"10.1016\/0263-7863(95)00080-1"},{"key":"jeis.2012040103-1","doi-asserted-by":"publisher","DOI":"10.1016\/S0925-5273(97)00056-X"},{"key":"jeis.2012040103-2","doi-asserted-by":"publisher","DOI":"10.1016\/S0305-750X(03)00143-8"},{"key":"jeis.2012040103-3","doi-asserted-by":"publisher","DOI":"10.1007\/978-1-4615-5691-6_6"},{"key":"jeis.2012040103-4","doi-asserted-by":"publisher","DOI":"10.1016\/S0263-7863(02)00090-X"},{"key":"jeis.2012040103-5","doi-asserted-by":"publisher","DOI":"10.1016\/S0263-7863(02)00022-4"},{"key":"jeis.2012040103-6","doi-asserted-by":"publisher","DOI":"10.1016\/S0166-4972(98)00065-0"},{"key":"jeis.2012040103-7","unstructured":"CGN & Associates Inc. (2004). Project management maturity: A critical competence. Retrieved from http:\/\/www.cgn.net\/"},{"key":"jeis.2012040103-8","doi-asserted-by":"publisher","DOI":"10.1016\/0738-0593(94)E0007-B"},{"key":"jeis.2012040103-9","doi-asserted-by":"publisher","DOI":"10.1016\/j.eswa.2008.07.058"},{"key":"jeis.2012040103-10","doi-asserted-by":"publisher","DOI":"10.1016\/j.eswa.2010.12.044"},{"key":"jeis.2012040103-11","doi-asserted-by":"publisher","DOI":"10.1016\/S0263-7863(00)00033-8"},{"key":"jeis.2012040103-12","doi-asserted-by":"publisher","DOI":"10.1016\/S0263-7863(02)00092-3"},{"key":"jeis.2012040103-13","doi-asserted-by":"publisher","DOI":"10.1016\/S0263-7863(01)00070-9"},{"key":"jeis.2012040103-14","doi-asserted-by":"publisher","DOI":"10.1016\/S0263-7863(02)00057-1"},{"key":"jeis.2012040103-15","author":"H.Kerzner","year":"1998","journal-title":"Project management \u2013 A systems approach to planning, scheduling, and controlling"},{"key":"jeis.2012040103-16","unstructured":"Kuppuswamy, S., Podikunju, B., & Devarajamma, S. (2004). Digital library solutions for knowledge sharing and information retrieval of engineering drawings for R&D division of aerospace industry: a case study. In Proceedings of the 22nd National Convention & Conference on Digital Information Exchange: Pathways to Build Global Information Society, Chennai, India (pp. 22-23)."},{"key":"jeis.2012040103-17","doi-asserted-by":"publisher","DOI":"10.1016\/S0263-7863(02)00089-3"},{"key":"jeis.2012040103-18","doi-asserted-by":"crossref","DOI":"10.1093\/oso\/9780195092691.001.0001","author":"I.Nonaka","year":"1995","journal-title":"The knowledge-creating company, how Japanese companies create the dynamics of innovation"},{"key":"jeis.2012040103-19","unstructured":"Powell, M. (2004). Using a maturity assessment tool to benchmark project capability across the organization \u2013 getting value for money. Retrieved from http:\/\/www.bppm.com\/"},{"key":"jeis.2012040103-20","year":"2000","journal-title":"A guide to the project management body of knowledge"},{"key":"jeis.2012040103-21","doi-asserted-by":"publisher","DOI":"10.1108\/02635579910282920"},{"key":"jeis.2012040103-22","doi-asserted-by":"publisher","DOI":"10.1016\/S0263-7863(02)00096-0"},{"key":"jeis.2012040103-23","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijproman.2004.01.003"},{"key":"jeis.2012040103-24","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijproman.2004.05.002"},{"key":"jeis.2012040103-25","unstructured":"Waldron, C., & Dorrough, F. (1994). Process line automation for the aerospace industry. National Conference Publication \u2013 Institution of Engineers, 2(11), 581-586."}],"container-title":["International Journal of Enterprise Information Systems"],"original-title":[],"language":"ng","link":[{"URL":"https:\/\/www.igi-global.com\/viewtitle.aspx?TitleId=67120","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,4,24]],"date-time":"2024-04-24T12:32:16Z","timestamp":1713961936000},"score":1,"resource":{"primary":{"URL":"https:\/\/services.igi-global.com\/resolvedoi\/resolve.aspx?doi=10.4018\/jeis.2012040103"}},"subtitle":[""],"short-title":[],"issued":{"date-parts":[[2012,4,1]]},"references-count":26,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2012,4]]}},"URL":"https:\/\/doi.org\/10.4018\/jeis.2012040103","relation":{},"ISSN":["1548-1115","1548-1123"],"issn-type":[{"value":"1548-1115","type":"print"},{"value":"1548-1123","type":"electronic"}],"subject":[],"published":{"date-parts":[[2012,4,1]]}}}