{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2022,6,1]],"date-time":"2022-06-01T15:13:02Z","timestamp":1654096382323},"reference-count":57,"publisher":"IGI Global","issue":"1","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2013,1,1]]},"abstract":"<p>The purpose of this paper is to examine the socio-technical structures prevailing in technical organizations. It explores relationships that exist between technical and social structures and imperative project management practices, using statistical techniques. The study investigates links between organization design structures, project management performance, multiple dimensions of project managers\u2019 competencies including personal, business knowledge, interpersonal and managerial competencies and project performance. A systematic teardown approach was adopted for the analysis of various competencies. The statistical analysis technique, ANOVA (Analysis of Variance) was conducted to validate various factors. The results of statistical analysis has shown that organization design structures are not the major determinants, only organizational design structures with functionally structured resource distributions are established as determinants of project management performance. Furthermore, it was proven that the project managers\u2019 competencies have a major influence on project performance. This study will help to improve performance of technical projects and will lay a foundation for the framework of improvement and development of organizations.<\/p>","DOI":"10.4018\/jitpm.2013010106","type":"journal-article","created":{"date-parts":[[2013,3,6]],"date-time":"2013-03-06T17:02:56Z","timestamp":1362589376000},"page":"72-87","source":"Crossref","is-referenced-by-count":2,"title":["Linkages between Organization Design Structures, Performance Measurement Systems and Project Performance in Project Based Technical Environment\u2014An Empirical Analysis"],"prefix":"10.4018","volume":"4","author":[{"given":"Sameen","family":"Baloch","sequence":"first","affiliation":[{"name":"Center for Advanced Studies in Engineering, Islamabad, Pakistan"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Azhar M.","family":"Khan","sequence":"additional","affiliation":[{"name":"Center for Advanced Studies in Engineering, Islamabad, Pakistan"}],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"2432","reference":[{"key":"jitpm.2013010106-0","doi-asserted-by":"publisher","DOI":"10.4018\/jitpm.2010100202"},{"key":"jitpm.2013010106-1","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijproman.2005.03.005"},{"key":"jitpm.2013010106-2","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijproman.2006.09.011"},{"key":"jitpm.2013010106-3","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijproman.2007.01.004"},{"key":"jitpm.2013010106-4","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijproman.2007.08.009"},{"issue":"4","key":"jitpm.2013010106-5","doi-asserted-by":"crossref","first-page":"25","DOI":"10.1177\/875697289903000405","article-title":"The logical framework method for defining project success.","volume":"30","author":"D.Baccarini","year":"1999","journal-title":"Project Management Journal"},{"key":"jitpm.2013010106-6","doi-asserted-by":"publisher","DOI":"10.4018\/jitpm.2010070103"},{"key":"jitpm.2013010106-7","doi-asserted-by":"publisher","DOI":"10.1016\/S0377-2217(03)00155-3"},{"key":"jitpm.2013010106-8","doi-asserted-by":"publisher","DOI":"10.1007\/s10796-008-9083-6"},{"key":"jitpm.2013010106-9","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijpe.2009.11.025"},{"key":"jitpm.2013010106-10","doi-asserted-by":"publisher","DOI":"10.4018\/jitpm.2010070101"},{"key":"jitpm.2013010106-11","doi-asserted-by":"publisher","DOI":"10.1142\/S1609945104000152"},{"issue":"4","key":"jitpm.2013010106-12","doi-asserted-by":"crossref","first-page":"40","DOI":"10.1080\/10429247.2008.11431787","article-title":"A preliminary assessment of the relationships between project success, system engineering, and team organization.","volume":"20","author":"P. J.Componation","year":"2008","journal-title":"Engineering Management Journal"},{"issue":"3","key":"jitpm.2013010106-13","doi-asserted-by":"crossref","first-page":"74","DOI":"10.1177\/875697280603700308","article-title":"Developing organizational project management capability: Theory and practice.","volume":"37","author":"L.Crawford","year":"2006","journal-title":"Project Management Journal"},{"key":"jitpm.2013010106-14","doi-asserted-by":"publisher","DOI":"10.4018\/jitpm.2010100103"},{"key":"jitpm.2013010106-15","author":"D. A.Dillman","year":"2000","journal-title":"Mail & internet surveys: The total design method"},{"key":"jitpm.2013010106-16","doi-asserted-by":"publisher","DOI":"10.1016\/j.dss.2005.04.001"},{"key":"jitpm.2013010106-17","unstructured":"Dwyer, C. (2011). Socio-technical systems theory and environmental sustainability, Proceedings of SIG Green Workshop. Sprouts: Working Papers on Information Systems, 11(3)."},{"key":"jitpm.2013010106-18","doi-asserted-by":"crossref","unstructured":"Frisanco, T., Anglberger, N., Ang, R., & Onu, S. (2008). Project management\u2014A holistic approach for managed services. In Proceedings of the 15 International Conference on Management Science & Engineering, Long Beach, USA.","DOI":"10.1109\/ICMSE.2008.4669084"},{"key":"jitpm.2013010106-19","doi-asserted-by":"publisher","DOI":"10.4018\/jitpm.2011010103"},{"key":"jitpm.2013010106-20","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijproman.2005.09.001"},{"key":"jitpm.2013010106-21","doi-asserted-by":"publisher","DOI":"10.4018\/jitpm.2011010101"},{"key":"jitpm.2013010106-22","unstructured":"Jalote, P. (2000). Use of metrics in high maturity organizations. In Proceedings of the SEPG2K Conference, Seattle, WA."},{"key":"jitpm.2013010106-23","doi-asserted-by":"publisher","DOI":"10.1080\/14639220903353401"},{"issue":"1","key":"jitpm.2013010106-24","doi-asserted-by":"crossref","first-page":"3","DOI":"10.1080\/10429247.2006.11431678","article-title":"Project manager roles in IT outsourcing.","volume":"18","author":"J. T.Karlsen","year":"2006","journal-title":"Engineering Management Journal"},{"key":"jitpm.2013010106-25","author":"K.Kendra","year":"2003","journal-title":"An organization design approach to project management. Unpublished doctoral ddissertation"},{"issue":"1","key":"jitpm.2013010106-26","doi-asserted-by":"crossref","first-page":"30","DOI":"10.1177\/875697280403500104","article-title":"Project success: A cultural framework.","volume":"35","author":"K.Kendra","year":"2004","journal-title":"Project Management Journal"},{"key":"jitpm.2013010106-27","author":"H.Kerzner","year":"1989","journal-title":"Project management: A systems approach to planning, scheduling, and controlling"},{"key":"jitpm.2013010106-28","author":"H.Kerzner","year":"1998","journal-title":"In search of excellence in project management: Successful practices in high performing organizations"},{"key":"jitpm.2013010106-29","author":"H.Kerzner","year":"2000","journal-title":"Applied project management best practices on implementation"},{"key":"jitpm.2013010106-30","author":"H.Kerzner","year":"2001","journal-title":"Project management--A systems approach to planning, scheduling, and controlling"},{"key":"jitpm.2013010106-31","author":"H.Kerzner","year":"2001","journal-title":"Strategic planning for project management\u2011Using a project management maturity model"},{"key":"jitpm.2013010106-32","doi-asserted-by":"publisher","DOI":"10.1504\/IJPOM.2011.038866"},{"issue":"1","key":"jitpm.2013010106-33","doi-asserted-by":"crossref","first-page":"29","DOI":"10.1080\/10429247.2008.11431753","article-title":"Evaluating benefits & challenges of knowledge transfer across projects.","volume":"20","author":"R. E.Landaeta","year":"2008","journal-title":"Engineering Management Journal"},{"key":"jitpm.2013010106-34","doi-asserted-by":"crossref","unstructured":"Lechler, T., & Grace, E. (2007). Successful management of highly innovative and urgent projects: Analyzing project management practices to reveal strategic directions. In Proceedings of the 2007 Portland International Conference on Management of Engineering and Technology, Portland, OR.","DOI":"10.1109\/PICMET.2007.4349535"},{"issue":"1","key":"jitpm.2013010106-35","doi-asserted-by":"crossref","first-page":"38","DOI":"10.3233\/HSM-2004-23103","article-title":"The management of socio-technical systems using configuration modeling.","volume":"23","author":"S.Lock","year":"2004","journal-title":"Human Systems Management"},{"issue":"4","key":"jitpm.2013010106-36","doi-asserted-by":"crossref","first-page":"17","DOI":"10.1080\/10429247.2005.11431668","article-title":"Cultural influence on the implementation of lessons learned in project management.","volume":"17","author":"I.Maya","year":"2005","journal-title":"Engineering Management Journal"},{"key":"jitpm.2013010106-37","doi-asserted-by":"publisher","DOI":"10.4018\/jitpm.2010100205"},{"key":"jitpm.2013010106-38","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijproman.2004.11.002"},{"key":"jitpm.2013010106-39","author":"J.Nunnally","year":"1978","journal-title":"Psychometric theory"},{"key":"jitpm.2013010106-40","doi-asserted-by":"crossref","unstructured":"Rezaiea, K., Ostadib, B., Tadayoun, S., & Aghdasi, M. (2009). Critical success factors (CSFs) for process management projects. In Proceedings of the 16th International Conference on Industrial Engineering and Engineering Management (IE&EM '09) (pp. 100-103).","DOI":"10.1109\/ICIEEM.2009.5344625"},{"key":"jitpm.2013010106-41","doi-asserted-by":"publisher","DOI":"10.4018\/jitpm.2011040105"},{"key":"jitpm.2013010106-42","doi-asserted-by":"publisher","DOI":"10.4018\/jitpm.2010100204"},{"issue":"4","key":"jitpm.2013010106-43","doi-asserted-by":"crossref","first-page":"3","DOI":"10.1080\/10429247.2008.11431782","article-title":"Taking hold of system of systems management.","volume":"20","author":"B.Sauser","year":"2008","journal-title":"Engineering Management Journal"},{"key":"jitpm.2013010106-44","doi-asserted-by":"publisher","DOI":"10.1016\/j.jom.2007.10.006"},{"key":"jitpm.2013010106-45","doi-asserted-by":"publisher","DOI":"10.1016\/S0024-6301(01)00097-8"},{"issue":"2","key":"jitpm.2013010106-46","first-page":"5","article-title":"Mapping the dimensions of project success.","volume":"28","author":"A. J.Shenhar","year":"1997","journal-title":"Project Management Journal"},{"key":"jitpm.2013010106-47","doi-asserted-by":"publisher","DOI":"10.1111\/1467-9310.00244"},{"key":"jitpm.2013010106-48","doi-asserted-by":"crossref","unstructured":"Sicotte, H., & Bourgault, M. (2001). Competencies in practice: revisiting present and anticipated profiles for project managers. In Proceedings of the Portland International Conference on Management of Engineering and Technology (PICMET '01) (pp. 407-408).","DOI":"10.1109\/PICMET.2001.952316"},{"key":"jitpm.2013010106-49","doi-asserted-by":"publisher","DOI":"10.4018\/jitpm.2010100101"},{"key":"jitpm.2013010106-50","year":"2004","journal-title":"2004 third quarter research report"},{"key":"jitpm.2013010106-51","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijproman.2007.02.001"},{"key":"jitpm.2013010106-52","doi-asserted-by":"publisher","DOI":"10.1109\/TEM.2009.2036159"},{"issue":"2","key":"jitpm.2013010106-53","doi-asserted-by":"crossref","first-page":"49","DOI":"10.1177\/875697280503600206","article-title":"The project manager\u2019s role as a success factor on projects: A literature review","volume":"36","author":"R.Turner","year":"2005","journal-title":"Project Management Journal"},{"key":"jitpm.2013010106-54","doi-asserted-by":"publisher","DOI":"10.1016\/S0263-7863(01)00012-6"},{"key":"jitpm.2013010106-55","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijproman.2007.05.006"},{"key":"jitpm.2013010106-56","author":"R. K.Wysocki","year":"2000","journal-title":"Effective project management"}],"container-title":["International Journal of Information Technology Project Management"],"original-title":[],"language":"ng","link":[{"URL":"https:\/\/www.igi-global.com\/viewtitle.aspx?TitleId=75581","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,6,1]],"date-time":"2022-06-01T14:30:06Z","timestamp":1654093806000},"score":1,"resource":{"primary":{"URL":"https:\/\/services.igi-global.com\/resolvedoi\/resolve.aspx?doi=10.4018\/jitpm.2013010106"}},"subtitle":[""],"short-title":[],"issued":{"date-parts":[[2013,1,1]]},"references-count":57,"journal-issue":{"issue":"1","published-print":{"date-parts":[[2013,1]]}},"URL":"https:\/\/doi.org\/10.4018\/jitpm.2013010106","relation":{},"ISSN":["1938-0232","1938-0240"],"issn-type":[{"value":"1938-0232","type":"print"},{"value":"1938-0240","type":"electronic"}],"subject":[],"published":{"date-parts":[[2013,1,1]]}}}