{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2023,8,16]],"date-time":"2023-08-16T18:51:01Z","timestamp":1692211861585},"reference-count":70,"publisher":"IGI Global","issue":"2","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2000,4,1]]},"abstract":"<p>The aim of this paper is to identify and classify the numerous managerial issues encountered in the management of personnel in confined site construction. For the purpose of this research, a confined construction site is defined as a site where permanent works fit the site footprint, extending to levels above and\/or below ground level, leaving spatial restrictions for other operations (e.g. plant and material movements, materials storage and temporary accommodation etc.) and require effective resource co-ordination beyond normal on-site management input. A literature review and analysis, case studies incorporating interviews and focus groups, and a questionnaire survey were used in order to gain a comprehensive insight into the issues of management of personnel in a confined construction site environment. The following are the top five leading issues highlighted; (1) Accidents due to an untidy site, (2) One contractor holding up another because of the lack of space, (3) A risk to personnel because of vehicular traffic on-site, (4) Difficult to facilitate several contractors at one work location, and (5) Numerous personnel working within the one space. In today\u2019s modern environment, spatial restrictions are quickly becoming the norm in the industry. Therefore, the management of personnel on-site becomes progressively more difficult with the decrease in available space on-site. Where such environments exist, acknowledging the numerous issues highlighted above, aids site management in the supervision and co-ordination of personnel on-site, thus reducing accidents, increasing productivity and increasing profit margins. As on-site management professionals successfully identify, acknowledge and counteract the numerous issues illustrated, the successful management of personnel on a confined construction site is achievable. By identifying the numerous issues, on-site management can proactively mitigate such issues through adopting counteractive measures and through successful identification of the traits identified.<\/p>","DOI":"10.4018\/jitpm.2013040106","type":"journal-article","created":{"date-parts":[[2013,7,18]],"date-time":"2013-07-18T20:05:25Z","timestamp":1374177925000},"page":"92-108","source":"Crossref","is-referenced-by-count":1,"title":["Critical Factors Affecting Effective Management of Site Personnel and Operatives in Confined Site Construction"],"prefix":"10.4018","volume":"4","author":[{"given":"John P.","family":"Spillane","sequence":"first","affiliation":[{"name":"School of Planning, Architecture and Civil Engineering, Queen\u2019s University Belfast, Belfast, UK"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Lukumon O.","family":"Oyedele","sequence":"additional","affiliation":[{"name":"School of Planning, Architecture and Civil Engineering, Queen\u2019s University Belfast, Belfast, UK"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Jason","family":"von Meding","sequence":"additional","affiliation":[{"name":"School of Planning, Architecture and Civil Engineering, Queen\u2019s University Belfast, Belfast, UK"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Ashwini","family":"Konanahalli","sequence":"additional","affiliation":[{"name":"School of Planning, Architecture and Civil Engineering, Queen\u2019s University Belfast, Belfast, UK"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Babatunde E.","family":"Jaiyeoba","sequence":"additional","affiliation":[{"name":"Department of Architecture, Obafemi Awolowo University, Ile-Ife, Nigeria"}],"role":[{"role":"author","vocabulary":"crossref"}]},{"given":"Iyabo K.","family":"Tijani","sequence":"additional","affiliation":[{"name":"Department of Graphic Design, Yaba College of Technology, Lagos, Nigeria"}],"role":[{"role":"author","vocabulary":"crossref"}]}],"member":"2432","reference":[{"key":"jitpm.2013040106-0","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(2000)126:1(52)"},{"key":"jitpm.2013040106-1","doi-asserted-by":"crossref","unstructured":"Akinci, B., & Fischer, M. (2000). 4D WorkPlanner - A prototype system for automated generation of construction spaces and analysis of time-space conflicts. In Proceedings of the Eighth International Conference on Computing in Civil and Building Engineering (ICCCBE-VIII), Stanford University, CA (pp. 740-747).","DOI":"10.1061\/40513(279)97"},{"key":"jitpm.2013040106-2","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(2002)128:4(296)"},{"key":"jitpm.2013040106-3","first-page":"3000","article-title":"Tools for the identification and reduction of waste in construction projects. Lean Construction, A. A. Balkema","volume":"1675","author":"L. F.Alarcon","year":"1999","journal-title":"P.O. Box"},{"key":"jitpm.2013040106-4","first-page":"95","article-title":"A study on causes of accident and prevention in Malaysian construction industry.","volume":"3","author":"A. S.Ali","year":"2010","journal-title":"Journal of Design and Build"},{"key":"jitpm.2013040106-5","author":"S.Angel","year":"2005","journal-title":"The dynamics of global urban expansion. Transport and urban development department"},{"key":"jitpm.2013040106-6","doi-asserted-by":"publisher","DOI":"10.1080\/01446190210131647"},{"issue":"4","key":"jitpm.2013040106-7","first-page":"1","article-title":"Managing work flow on design projects: A case study.","volume":"9","author":"G.Ballard","year":"2002","journal-title":"Engineering, Construction, and Architectural Management"},{"issue":"1","key":"jitpm.2013040106-8","first-page":"2","article-title":"Land use in Britain.","volume":"26","author":"P.Biddy","year":"2009","journal-title":"Land Use Policy"},{"key":"jitpm.2013040106-9","doi-asserted-by":"publisher","DOI":"10.1080\/01446190500184444"},{"key":"jitpm.2013040106-10","doi-asserted-by":"publisher","DOI":"10.1016\/S0263-7863(00)00032-6"},{"key":"jitpm.2013040106-11","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(2004)130:4(598)"},{"key":"jitpm.2013040106-12","doi-asserted-by":"crossref","unstructured":"Chau, K. W., & Anson, M. (2002). A knowledge \u2013based system for construction site level facilities layout. Lecture notes in Artificial Intelligence (pp. 2358, 393-402). Berlin\/Heidelberg, Germany: Springer.","DOI":"10.1007\/3-540-48035-8_39"},{"key":"jitpm.2013040106-13","author":"R.Chudley","year":"2006","journal-title":"Advanced construction technology"},{"key":"jitpm.2013040106-14","doi-asserted-by":"crossref","DOI":"10.4324\/9780080460864","author":"R.Chudley","year":"2006","journal-title":"Building construction handbook"},{"key":"jitpm.2013040106-15","author":"D. J.Cooper","year":"2004","journal-title":"Improving people performance in construction"},{"key":"jitpm.2013040106-16","doi-asserted-by":"publisher","DOI":"10.1016\/j.landusepol.2009.08.017"},{"key":"jitpm.2013040106-17","author":"J.Egan","year":"1998","journal-title":"Accelerating change \u2013 a report by the strategic forum for construction - chaired by Sir John Egan. Department of trade and Industry"},{"key":"jitpm.2013040106-18","unstructured":"Elbeltagi, E., & Hegazy, T. (2002). Incorporating safety into construction site management. In Proceedings of the First International Conference on Construction in the 21st Century - Challenges and Opportunities in Management and Technology, Miami, Florida (pp. 661-668)."},{"key":"jitpm.2013040106-19","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(2004)130:4(534)"},{"issue":"4","key":"jitpm.2013040106-20","doi-asserted-by":"crossref","first-page":"245","DOI":"10.3846\/13923730.2007.9636444","article-title":"Factors affecting labour productivity in building projects on the Gaza Strip.","volume":"8","author":"A.Enshassi","year":"2007","journal-title":"Journal of Civil Engineering and Management"},{"key":"jitpm.2013040106-21","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(1999)125:5(311)"},{"key":"jitpm.2013040106-22","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(2002)128:4(316)"},{"key":"jitpm.2013040106-23","doi-asserted-by":"publisher","DOI":"10.1016\/S0926-5805(98)00109-5"},{"key":"jitpm.2013040106-24","doi-asserted-by":"publisher","DOI":"10.1016\/j.apergo.2004.12.002"},{"key":"jitpm.2013040106-25","unstructured":"Health & Safety Executive. (2003a, February 21). HSE construction blitz targeting mobile plant, vehicles and lifting operations. HSE Press Release."},{"key":"jitpm.2013040106-26","year":"2003","journal-title":"Causal factors in construction accidents. Prepared by Loughborough University and UMIST, Research Report 156"},{"key":"jitpm.2013040106-27","year":"2006","journal-title":"Watch your step in the Construction Industry"},{"key":"jitpm.2013040106-28","unstructured":"Health & Safety Executive. (2009). Health and safety induction for smaller construction companies. HSE Press, February."},{"key":"jitpm.2013040106-29","unstructured":"Health & Safety Executive. (2011). Traffic management on-site. Retrieved September 21st, 2011, from http:\/\/www.hse.gov.uk\/construction\/safetytopics\/vehiclestrafficmanagement.htm"},{"key":"jitpm.2013040106-30","first-page":"72","author":"R. M. W.Horner","year":"1995","journal-title":"Effects of accelerated working, delays and disruption on labour productivity. Chartered Institute of Building, Ascot, U.K. International Labour Office. (1995). Safety, health and welfare on construction sites: A training manual"},{"key":"jitpm.2013040106-31","doi-asserted-by":"crossref","DOI":"10.4135\/9781446269381","author":"P.Jones","year":"2008","journal-title":"Urban regeneration in the UK"},{"issue":"1","key":"jitpm.2013040106-32","first-page":"141","article-title":"Safety and cost considerations in site layout planning.","volume":"1","author":"A.Khalafallah","year":"2004","journal-title":"Housing and Building Research Centre Journal"},{"issue":"7","key":"jitpm.2013040106-33","first-page":"358","article-title":"Health hazards associated with work in confined spaces.","volume":"8","author":"M.Kleinfeld","year":"1966","journal-title":"Journal of Occupational Medicine."},{"key":"jitpm.2013040106-34","author":"R.Lambeck","year":"2008","journal-title":"Urban construction project management"},{"issue":"3","key":"jitpm.2013040106-35","doi-asserted-by":"crossref","first-page":"211","DOI":"10.1108\/eb021146","article-title":"Effects of overtime work and additional resources on the project cost and quality.","volume":"7","author":"H.Li","year":"2000","journal-title":"Engineering, Construction, and Architectural Management"},{"key":"jitpm.2013040106-36","doi-asserted-by":"publisher","DOI":"10.1021\/es062481d"},{"key":"jitpm.2013040106-37","doi-asserted-by":"crossref","unstructured":"Loosemore, M., Dainty, A., & Lingard, H. (2003b). Human resource management in construction projects. Routledge, Taylor & Francis Group.","DOI":"10.4324\/9780203417881"},{"key":"jitpm.2013040106-38","author":"M.Loosemore","year":"2003","journal-title":"Essentials of construction project management"},{"key":"jitpm.2013040106-39","doi-asserted-by":"publisher","DOI":"10.1016\/0022-4375(90)90023-5"},{"key":"jitpm.2013040106-40","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(2002)128:5(418)"},{"key":"jitpm.2013040106-41","author":"N.McManus","year":"1999","journal-title":"Safety and health in confined spaces"},{"key":"jitpm.2013040106-42","doi-asserted-by":"crossref","unstructured":"Mitropoulos, P., Howell, G. A., & Abdelhamid. (2005). Accident causation strategies: Causation model and research objectives. American Association of Civil Engineers - Construction Research Congress 2005.","DOI":"10.1061\/40754(183)8"},{"key":"jitpm.2013040106-43","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(2002)128:5(375)"},{"key":"jitpm.2013040106-44","doi-asserted-by":"publisher","DOI":"10.1108\/14714170610713917"},{"key":"jitpm.2013040106-45","doi-asserted-by":"publisher","DOI":"10.1080\/0144619032000087294"},{"key":"jitpm.2013040106-46","doi-asserted-by":"crossref","unstructured":"Riley, D. R. (2000). The role of 4D modelling in trade sequencing and production planning. In Proceeding of Construction Congress VI \u2013 Building Together for a Better Tomorrow in an Increasingly Complex World (pp. 1029-1034).","DOI":"10.1061\/40475(278)110"},{"key":"jitpm.2013040106-47","author":"P. W.Roberts","year":"2000","journal-title":"Urban regeneration: A handbook"},{"key":"jitpm.2013040106-48","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0742-597X(2003)19:2(78)"},{"key":"jitpm.2013040106-49","unstructured":"Samdani, S. A., Bhakal, L., & Singh, A. K. (2006, July 28). Site layout for temporary construction facilities using ant colony optimisation. In Proceedings of the ASCE 4th International Engineering and Construction Conference, Los Angeles, CA."},{"key":"jitpm.2013040106-50","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(1991)117:4(626)"},{"key":"jitpm.2013040106-51","doi-asserted-by":"publisher","DOI":"10.1016\/S0263-7863(98)00042-8"},{"key":"jitpm.2013040106-52","author":"B.Singer","year":"2002","journal-title":"Building on confined sites poses construction challenges"},{"key":"jitpm.2013040106-53","doi-asserted-by":"publisher","DOI":"10.1016\/j.autcon.2004.04.012"},{"key":"jitpm.2013040106-54","doi-asserted-by":"publisher","DOI":"10.1016\/j.advengsoft.2005.03.025"},{"issue":"7","key":"jitpm.2013040106-55","first-page":"138","article-title":"Confined site construction: A qualitative investigation of critical issues affecting management of health and safety.","volume":"2","author":"J. P.Spillane","year":"2011","journal-title":"Journal of Civil Engineering and Construction Technology"},{"key":"jitpm.2013040106-56","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(2002)128:3(220)"},{"key":"jitpm.2013040106-57","first-page":"16802","author":"B.Tan","year":"2005","journal-title":"A visual process for planning trade flow on construction projects. Computer integrated construction research program"},{"key":"jitpm.2013040106-58","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(2000)126:4(261)"},{"key":"jitpm.2013040106-59","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(2006)132:1(97)"},{"key":"jitpm.2013040106-60","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)1084-0680(2006)11:4(197)"},{"key":"jitpm.2013040106-61","author":"D.Tindiwensi","year":"2000","journal-title":"Integration of buildability issues in construction projects in developing economies"},{"key":"jitpm.2013040106-62","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(1993)119:2(266)"},{"key":"jitpm.2013040106-63","year":"2008","journal-title":"Urban agglomerations, 2007"},{"key":"jitpm.2013040106-64","year":"2008","journal-title":"Urban population, development and environment, 2007"},{"key":"jitpm.2013040106-65","year":"2010","journal-title":"World urbanisation prospects \u2013 the 2009 revision \u2013 highlights"},{"key":"jitpm.2013040106-66","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(2005)131:10(1125)"},{"key":"jitpm.2013040106-67","author":"G.Winch","year":"2010","journal-title":"Managing construction projects"},{"key":"jitpm.2013040106-68","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(2006)132:5(473)"},{"key":"jitpm.2013040106-69","doi-asserted-by":"publisher","DOI":"10.1016\/j.simpat.2008.09.011"}],"container-title":["International Journal of Information Technology Project Management"],"original-title":[],"language":"ng","link":[{"URL":"https:\/\/www.igi-global.com\/viewtitle.aspx?TitleId=77880","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2023,1,16]],"date-time":"2023-01-16T22:12:59Z","timestamp":1673907179000},"score":1,"resource":{"primary":{"URL":"https:\/\/services.igi-global.com\/resolvedoi\/resolve.aspx?doi=10.4018\/jitpm.2013040106"}},"subtitle":[""],"short-title":[],"issued":{"date-parts":[[2000,4,1]]},"references-count":70,"journal-issue":{"issue":"2","published-print":{"date-parts":[[2013,4]]}},"URL":"https:\/\/doi.org\/10.4018\/jitpm.2013040106","relation":{},"ISSN":["1938-0232","1938-0240"],"issn-type":[{"value":"1938-0232","type":"print"},{"value":"1938-0240","type":"electronic"}],"subject":[],"published":{"date-parts":[[2000,4,1]]}}}