{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,6,10]],"date-time":"2026-06-10T15:31:24Z","timestamp":1781105484222,"version":"3.54.1"},"reference-count":28,"publisher":"IGI Global Scientific Publishing","issue":"3","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2013,7,1]]},"abstract":"<p>Risk and reliability are two main factors that must be studied in order to measure the successful rate of a project. As a result, innovative project delivery methods have been proposed to mitigate the risk and improve reliability of a project. The intent of this study is to compare the use of the Analytical Hierarchical Process (AHP) and fuzzy AHP for decisions surrounding the early stages of construction projects based on risk and reliability measures. Financial risk is especially high during the early design stages of a project due to the unknown obstacles that will follow. The case study uses the selection of a project delivery method as an example, and provides a sample project to highlight the project-specific variability of the multi-criteria decision analysis.<\/p>","DOI":"10.4018\/jsds.2013070103","type":"journal-article","created":{"date-parts":[[2013,11,22]],"date-time":"2013-11-22T14:31:56Z","timestamp":1385130716000},"page":"54-65","source":"Crossref","is-referenced-by-count":2,"title":["Analysis of Risk and Reliability in Project Delivery Methods"],"prefix":"10.4018","volume":"4","author":[{"given":"Robert","family":"Schultz","sequence":"first","affiliation":[{"name":"Department of Systems Engineering & Management, California State University, Northridge, CA, USA"}],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Ahmad","family":"Sarfaraz","sequence":"additional","affiliation":[{"name":"Department of Systems Engineering & Management, California State University, Northridge, CA, USA"}],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Kouroush","family":"Jenab","sequence":"additional","affiliation":[{"name":"Society of Reliability Engineering-Ottawa, Ottawa, ON, Canada"}],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"2432","reference":[{"key":"jsds.2013070103-0","doi-asserted-by":"publisher","DOI":"10.1504\/IJISCM.2011.039069"},{"key":"jsds.2013070103-1","doi-asserted-by":"publisher","DOI":"10.1016\/S0263-7863(01)00032-1"},{"key":"jsds.2013070103-2","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijproman.2004.11.004"},{"key":"jsds.2013070103-3","doi-asserted-by":"publisher","DOI":"10.4018\/jeis.2009070101"},{"key":"jsds.2013070103-4","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijproman.2010.01.016"},{"key":"jsds.2013070103-5","doi-asserted-by":"publisher","DOI":"10.4018\/jeis.2009090201"},{"key":"jsds.2013070103-6","doi-asserted-by":"publisher","DOI":"10.4018\/jeis.2012010104"},{"key":"jsds.2013070103-7","doi-asserted-by":"publisher","DOI":"10.4018\/jeis.2012040103"},{"key":"jsds.2013070103-8","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(2002)128:6(473)"},{"key":"jsds.2013070103-9","unstructured":"Goldfrey, P. S. (1996). Control of risk: A guide to the systematic management of risk from construction. London, UK: Construction Industry research and Information Association."},{"key":"jsds.2013070103-10","doi-asserted-by":"publisher","DOI":"10.4018\/jeis.2005040105"},{"key":"jsds.2013070103-11","doi-asserted-by":"publisher","DOI":"10.1504\/IJPOM.2008.020030"},{"key":"jsds.2013070103-12","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijproman.2005.05.007"},{"issue":"1","key":"jsds.2013070103-13","first-page":"46","article-title":"Integrated project delivery an example pf relational contracting.","volume":"2","author":"O.Matthews","year":"2005","journal-title":"Lean Construction Journal"},{"key":"jsds.2013070103-14","doi-asserted-by":"publisher","DOI":"10.4018\/jeis.2006040101"},{"issue":"3\/4","key":"jsds.2013070103-15","doi-asserted-by":"crossref","first-page":"248","DOI":"10.1504\/IJASM.2008.021212","article-title":"Managing risk and uncertainty in an agile construction environment: Application of agile building specialist model.","volume":"3","author":"A. S.Oyegoke","year":"2008","journal-title":"International Journal of Agile Systems and Management"},{"issue":"4","key":"jsds.2013070103-16","doi-asserted-by":"crossref","first-page":"7","DOI":"10.1057\/palgrave.rm.8240224","article-title":"On integrating risk perspectives in project management.","volume":"7","author":"M.Sandy","year":"2005","journal-title":"Risk Management: An International Journal"},{"key":"jsds.2013070103-17","unstructured":"Santos, S. D. F. R., & Cabral, S. (2005). FMEA and PMBOK applied to project risk management. In Proceedings of the International Conference on Management of Technology, Vienna, Austria."},{"key":"jsds.2013070103-18","unstructured":"Seyedhoseini, S. M., Noori, S., & Hatefi, M. A. (2007). Two-polar concept of project risk management (TPCRM). In Proceeding of the 1st International Conference on Innovation Management, Shanghai, China."},{"key":"jsds.2013070103-19","doi-asserted-by":"publisher","DOI":"10.4018\/jeis.2007040104"},{"key":"jsds.2013070103-20","doi-asserted-by":"publisher","DOI":"10.4018\/jeis.2008010101"},{"key":"jsds.2013070103-21","unstructured":"Tatum, C. B. (1987). The project manager's role in integrating design and construction. Project Management Journal, 18(2), 96. Retrieved October 22, 2011, from ABI\/INFORM Global. (Document ID: 1272955)."},{"key":"jsds.2013070103-22","author":"G. J.Walewski","year":"2003","journal-title":"International project risk assessment: Methods, procedures, and critical factors, a report of the center construction industry studies"},{"key":"jsds.2013070103-23","unstructured":"Wei, G. (2004). Development of a framework for preliminary risk analysis in transportations projects. A Thesis for Degree of Master of Science in Civil Engineering."},{"key":"jsds.2013070103-24","doi-asserted-by":"publisher","DOI":"10.1061\/(ASCE)0733-9364(2003)129:4(382)"},{"key":"jsds.2013070103-25","doi-asserted-by":"publisher","DOI":"10.1016\/j.ijproman.2009.10.005"},{"key":"jsds.2013070103-26","doi-asserted-by":"crossref","unstructured":"Zhang, X. L., & Wang, L. H. (2009). Choosing an appropriate construction project delivery method using FAHP in China. In Proceedings of the 16th International Conference on Industrial Engineering and Engineering Management, Sydney, NSW, Australia, (pp. 78\u201382).","DOI":"10.1109\/ICIEEM.2009.5344629"},{"key":"jsds.2013070103-27","doi-asserted-by":"publisher","DOI":"10.1080\/01446193.2010.519781"}],"container-title":["International Journal of Strategic Decision Sciences"],"original-title":[],"language":"ng","link":[{"URL":"https:\/\/www.igi-global.com\/viewtitle.aspx?TitleId=94661","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2022,6,1]],"date-time":"2022-06-01T16:26:09Z","timestamp":1654100769000},"score":1,"resource":{"primary":{"URL":"https:\/\/services.igi-global.com\/resolvedoi\/resolve.aspx?doi=10.4018\/jsds.2013070103"}},"subtitle":[""],"short-title":[],"issued":{"date-parts":[[2013,7,1]]},"references-count":28,"journal-issue":{"issue":"3","published-print":{"date-parts":[[2013,7]]}},"URL":"https:\/\/doi.org\/10.4018\/jsds.2013070103","relation":{},"ISSN":["1947-8569","1947-8577"],"issn-type":[{"value":"1947-8569","type":"print"},{"value":"1947-8577","type":"electronic"}],"subject":[],"published":{"date-parts":[[2013,7,1]]}}}