{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,2,5]],"date-time":"2025-02-05T17:40:21Z","timestamp":1738777221331,"version":"3.37.0"},"reference-count":19,"publisher":"Academy Publisher","issue":"7","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["JNW"],"DOI":"10.4304\/jnw.9.7.1783-1789","type":"journal-article","created":{"date-parts":[[2014,7,3]],"date-time":"2014-07-03T10:41:45Z","timestamp":1404384105000},"source":"Crossref","is-referenced-by-count":0,"title":["An improved Genetic Algorithm of Bi-level Coding for Flexible Job Shop Scheduling Problems"],"prefix":"10.4304","volume":"9","author":[{"given":"Ye","family":"Li","sequence":"first","affiliation":[]},{"given":"Yan","family":"Chen","sequence":"additional","affiliation":[]}],"member":"2838","published-online":{"date-parts":[[2014,7,3]]},"reference":[{"key":"ref1","doi-asserted-by":"publisher","DOI":"10.1016\/j.eswa.2010.08.006"},{"key":"ref2","first-page":"623","article-title":"Genetic Algorithm with Fuzzy Logic Controller for Preemptive and non-Preemptive Job Shop Scheduling Problems","volume":"34","author":"Yun","year":"2007","unstructured":"[2] Young Su Yun. Genetic Algorithm with Fuzzy Logic Controller for Preemptive and non-Preemptive Job Shop Scheduling Problems, Computers & Industrial Engineering, Vol. 34, pp. 623-644, 2007","journal-title":"Comput Ind Eng","ISSN":"https:\/\/id.crossref.org\/issn\/0360-8352","issn-type":"print"},{"key":"ref3","doi-asserted-by":"publisher","DOI":"10.1016\/j.cor.2005.12.002"},{"key":"ref4","first-page":"269","article-title":"A genetic algorithm for job-shop scheduling","volume":"5","author":"Li","year":"2010","unstructured":"[4] Ye Li, Yan Chen. A genetic algorithm for job-shop scheduling, Journal of Software, Vol. 5, pp. 269-274, 2010","journal-title":"J Softw","ISSN":"https:\/\/id.crossref.org\/issn\/1000-9825","issn-type":"print"},{"key":"ref5","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2005.03.073"},{"key":"ref6","first-page":"709","article-title":"Hybrid ant colony optimization and visibility studies applied to a job-shop scheduling problem","volume":"179","author":"Heinonen","year":"2007","unstructured":"[6] J. Heinonen, F. Pettersson. Hybrid ant colony optimization and visibility studies applied to a job-shop scheduling problem, Applied Mathematics and Computation, Vol. 179, pp. 709-722, 2007","journal-title":"Appl Math Comput","ISSN":"https:\/\/id.crossref.org\/issn\/0096-3003","issn-type":"print"},{"key":"ref7","doi-asserted-by":"publisher","DOI":"10.1016\/S0360-8352(02)00130-4"},{"key":"ref8","doi-asserted-by":"publisher","DOI":"10.1016\/S0377-2217(02)00733-6"},{"key":"ref9","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2005.12.020"},{"key":"ref10","first-page":"2271","article-title":"Application of self-adaptive multi-objective genetic algorithm in flexible job shop scheduling","volume":"18","author":"Hua-ping","year":"2006","unstructured":"[10] Chen Hua-ping, Gu Feng, Lu Bing-yuan et al. Application of self-adaptive multi-objective genetic algorithm in flexible job shop scheduling, Journal of System Simulation. Vol. 18, 2271-2274, 2006","journal-title":"Journal of System Simulation"},{"key":"ref11","first-page":"246","article-title":"Research on bi-objective flexible job shop scheduling based on genetic algorithm","volume":"17","author":"Yi-wei","year":"2006","unstructured":"[11] Yu Yi-wei, Huang Tie-qun, Ye Liang-peng. Research on bi-objective flexible job shop scheduling based on genetic algorithm, Journal of China Jiliang University, Vol. 17, 246-250, 2006","journal-title":"Journal of China Jiliang University"},{"key":"ref12","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2004.03.012"},{"key":"ref13","doi-asserted-by":"publisher","DOI":"10.1016\/j.cie.2004.12.008"},{"key":"ref14","doi-asserted-by":"publisher","DOI":"10.1016\/j.ejor.2005.12.020"},{"key":"ref15","doi-asserted-by":"publisher","DOI":"10.1016\/S0921-8890(00)00088-9"},{"key":"ref16","doi-asserted-by":"publisher","DOI":"10.1016\/S0360-8352(02)00130-4"},{"key":"ref17","doi-asserted-by":"publisher","DOI":"10.1016\/j.simpat.2005.05.001"},{"key":"ref18","doi-asserted-by":"publisher","DOI":"10.1016\/j.cor.2007.02.014"},{"key":"ref19","doi-asserted-by":"publisher","DOI":"10.3901\/JME.2007.04.119"}],"container-title":["Journal of Networks"],"original-title":[],"deposited":{"date-parts":[[2025,2,5]],"date-time":"2025-02-05T17:06:56Z","timestamp":1738775216000},"score":1,"resource":{"primary":{"URL":"https:\/\/dblp.org\/db\/journals\/jnw\/index.html"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2014,7,3]]},"references-count":19,"journal-issue":{"issue":"7","published-online":{"date-parts":[[2014,7,3]]}},"URL":"https:\/\/doi.org\/10.4304\/jnw.9.7.1783-1789","relation":{},"ISSN":["1796-2056"],"issn-type":[{"type":"print","value":"1796-2056"}],"subject":[],"published":{"date-parts":[[2014,7,3]]}}}