{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2026,6,25]],"date-time":"2026-06-25T20:02:19Z","timestamp":1782417739041,"version":"3.54.5"},"reference-count":9,"publisher":"STEF92 Technology","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":[],"published-print":{"date-parts":[[2025,8,15]]},"abstract":"<jats:p>In the era of advancing digitization, the application of Building Information Modeling (BIM) technology in the construction industry is increasingly evident at advanced level. However, the use of BIM tools during the operational phase of buildings\ufffdbeyond traditional design and construction\ufffdremains a niche area, with integrated digital facility management practices still limited in adoption. In this article, the authors focus on presenting an example of pilot project of implementation of the digital Common Data Environment (CDE) platform for managing an existing building, for which 3D documentation was not created in earlier stages of the lifecycle. For analysis and as an attempt to implement the use of BIM technology the first building D-2 located on the AGH campus was selected. Virtual documentation in the form of a \"digital twin\" was prepared for the selected object. The traditional and currently practiced property management plan was analyzed. Firstly, a plan for repetitive tasks was presented, including required building inspections and cyclical work performed. Subsequently, a process of action in case of a selected failure was developed. The traditional management plan was compared with the one prepared using the digital platform. The advantages and disadvantages of each solution were identified, and the validity of introducing process improvement for building administration using the selected tool was verified. The pilot project was originally conducted for a single building within the campus, with the aim of enabling the Dalux FM platform to be utilized in the future for management processes across buildings throughout the entire university campus.<\/jats:p>","DOI":"10.5593\/sgem2025\/2.1\/s08.11","type":"proceedings-article","created":{"date-parts":[[2025,11,22]],"date-time":"2025-11-22T09:23:08Z","timestamp":1763803388000},"page":"81-90","source":"Crossref","is-referenced-by-count":1,"title":["DIGITAL COMMON DATA ENVIRONMENT PLATFORM AS AN IMPLEMENTED TOOL FOR THE MANAGEMENT OF AN OPERATIONAL BUILDING"],"prefix":"10.5593","volume":"25","author":[{"given":"Karolina","family":"Drozdowska","sequence":"first","affiliation":[{"name":"Faculty of Civil Engineering and Resource Management, AGH University of Krakow","place":["Poland"]}],"role":[{"vocabulary":"crossref","role":"author"}]},{"given":"Aleksandra","family":"Radziejowska","sequence":"additional","affiliation":[{"name":"Faculty of Civil Engineering and Resource Management, AGH University of Krakow","place":["Poland"]}],"role":[{"vocabulary":"crossref","role":"author"}]}],"member":"3602","reference":[{"key":"ref=1","unstructured":"[1] Anna Anger, Pawel Laguna, Bartosz Zamara: BIM dla manager\ufffdw. Wyd. 1, Wydawnictwo Naukowe PWN SA, Poland 2021, ISBN-13, 978-83-01-21722-8"},{"key":"ref=2","doi-asserted-by":"crossref","unstructured":"[2] Jacek Nawrot: Wykorzystanie technologii BIM w procesie eksploatacji budynku, Zeszyty Naukowe Politechniki Czestochowskiej vol. 24 (2018), pp 249\ufffd254, Poland, 2018, DOI 10.17512\/znb.2018.1.39","DOI":"10.17512\/znb.2018.1.39"},{"key":"ref=3","doi-asserted-by":"crossref","unstructured":"[3] Hossein Omrany, Karam M. Al-Obaidi, Amreen Husain, Amirhosein Ghaffarianhoseini: Digital Twins in the Construction Industry: A Comprehensive Review of Current Implementations, Enabling Technologies, and Future Directions, UK 2023, DOI 10.3390\/su151410908","DOI":"10.3390\/su151410908"},{"key":"ref=4","unstructured":"[4] Barnes Peter, Davies Nigel: BIM in principle and in practise, Chapter 3: How BIM works, Wyd. 3, ICE Publishing, UK 2014, ISBN 978-0-7277-5863-7"},{"key":"ref=5","unstructured":"[5] Jankovic, M., Marijanovic, M. BIM and Facility Management: A systematic literature review. Journal of Building Engineering, Netherlands, 2021. ISSN 2352-7102."},{"key":"ref=6","unstructured":"[6] Borys, M., Radziejowska, A. Digital tools in facility management \ufffd challenges and opportunities. Inzynieria i Budownictwo, Polska, 2022. ISSN 0020-8039."},{"key":"ref=7","unstructured":"[7] Ma, Z., Ren, Y., Xiang, Y., Wang, J. A digital twin-driven approach for smart construction management. Advanced Engineering Informatics, Netherlands, 2022. ISSN 1474-0346."},{"key":"ref=8","unstructured":"[8] Barlish, K., Sullivan, K. How to measure the benefits of BIM \ufffd A case study approach. Automation in Construction, Netherlands, 2021. ISSN 0926-5805."},{"key":"ref=9","unstructured":"[9] Zajac, M., Brzezinski, M. Zarzadzanie obiektami budowlanymi w dobie cyfryzacji. Wydawnictwo Politechniki Warszawskiej, Polska, 2021. ISBN 978-83-7814-876-0."}],"event":{"name":"25th SGEM International Multidisciplinary Scientific GeoConference 2025","theme":"Earth and Planetary Sciences","location":"Albena, Bulgaria","acronym":"SGEM2025","number":"25","sponsor":["SGEM WORLD SCIENCE (SWS) Scholarly Society, Austria"],"start":{"date-parts":[[2025,6,29]]},"end":{"date-parts":[[2025,7,6]]}},"container-title":["SGEM International Multidisciplinary Scientific GeoConference\ufffd EXPO Proceedings","25th International Multidisciplinary Scientific GeoConference Proceedings SGEM 2025, Geoinformatics, Remote Sensing, and Artificial Intelligence (AI), Vol 25, Issue 2.1"],"original-title":[],"deposited":{"date-parts":[[2026,6,25]],"date-time":"2026-06-25T19:29:52Z","timestamp":1782415792000},"score":1,"resource":{"primary":{"URL":"https:\/\/epslibrary.at\/items\/addf0262-ff3b-455b-9f34-d135412e9ac5\/digital-common-data-environment-platform-as-an-implemented-tool-for-the-management-of-an-o"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2025,8,15]]},"references-count":9,"URL":"https:\/\/doi.org\/10.5593\/sgem2025\/2.1\/s08.11","relation":{},"ISSN":["1314-2704"],"issn-type":[{"value":"1314-2704","type":"print"}],"subject":[],"published":{"date-parts":[[2025,8,15]]}}}