{"status":"ok","message-type":"work","message-version":"1.0.0","message":{"indexed":{"date-parts":[[2025,10,27]],"date-time":"2025-10-27T10:55:58Z","timestamp":1761562558214},"reference-count":29,"publisher":"Centre for Evaluation in Education and Science (CEON\/CEES)","issue":"4","content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["FME Transactions"],"published-print":{"date-parts":[[2019]]},"DOI":"10.5937\/fmet1904757f","type":"journal-article","created":{"date-parts":[[2019,10,10]],"date-time":"2019-10-10T21:12:57Z","timestamp":1570741977000},"page":"757-764","source":"Crossref","is-referenced-by-count":12,"title":["An Industry 4.0 oriented tool for supporting dynamic selection of dispatching rules based on Kano model satisfaction scheduling"],"prefix":"10.5937","volume":"47","author":[{"given":"Luis","family":"Ferreirinha","sequence":"first","affiliation":[]},{"given":"Sara","family":"Baptista","sequence":"additional","affiliation":[]},{"given":"\u00c2ngela","family":"Pereira","sequence":"additional","affiliation":[]},{"given":"A.S.","family":"Santos","sequence":"additional","affiliation":[]},{"given":"J.","family":"Bastos","sequence":"additional","affiliation":[]},{"given":"A.M.","family":"Madureira","sequence":"additional","affiliation":[]},{"suffix":"Leonilde","given":"Maria","family":"Varela","sequence":"additional","affiliation":[]}],"member":"3964","reference":[{"key":"ref1","doi-asserted-by":"crossref","unstructured":"S. Kirkpatrick, C. D. Gelatt, and M. P. Vecchi, \"Optimization by simulated annealing.,\" Science, vol. 220, no. 4598, pp. 671-80, May 1983.;","DOI":"10.1126\/science.220.4598.671"},{"key":"ref2","doi-asserted-by":"crossref","unstructured":"I. Boussa\u00efd, J. Lepagnot, and P. Siarry, \"A survey on optimization metaheuristics,\" Inf. Sci. (Ny)., vol. 237, pp. 82-117, Jul. 2013.;","DOI":"10.1016\/j.ins.2013.02.041"},{"key":"ref3","doi-asserted-by":"crossref","unstructured":"A. Artiba and S. E. Elmaghraby, The Planning and Scheduling of Production Systems: Methodologies and applications. Springer US, 1996.;","DOI":"10.1007\/978-1-4613-1195-9"},{"key":"ref4","unstructured":"M. L. R. Varela, \"Uma contribui\u00e7\u00e3o para o escalonamento da produ\u00e7\u00e3o baseado em m\u00e9todos globalmente distribu\u00eddos,\" Universidade do Minho, 2007.;"},{"key":"ref5","doi-asserted-by":"crossref","unstructured":"L. Ferreirinha et al., \"A Dynamic Selection of Dispatching Rules Based on the Kano Model Satisfaction Scheduling Tool,\" Springer, Cham, 2019, pp. 339-346.;","DOI":"10.1007\/978-3-319-91334-6_46"},{"key":"ref6","doi-asserted-by":"crossref","unstructured":"D. Shabtay and G. Steiner, \"The single-machine earliness-tardiness scheduling problem with due date assignment and resource-dependent processing times,\" Ann. Oper. Res., vol. 159, no. 1, pp. 25-40, Mar. 2008.;","DOI":"10.1007\/s10479-007-0269-y"},{"key":"ref7","unstructured":"A. B. G. S. e Santos, \"An\u00e1lise do Desempenho de T\u00e9cnicas de Otimiza\u00e7\u00e3o no Problema de Escalonamento,\" ISEP, 2015.;"},{"key":"ref8","doi-asserted-by":"crossref","unstructured":"S. Goren and I. Sabuncuoglu, \"Robustness and stability measures for scheduling: single-machine environment,\" IIE Trans., vol. 40, no. 1, pp. 66-83, Jan. 2008.;","DOI":"10.1080\/07408170701283198"},{"key":"ref9","doi-asserted-by":"crossref","unstructured":"K. R. Baker and D. Trietsch, \"Principles of sequencing and scheduling, A John Wiley & Sons,\" Inc. Publ., 2009.;","DOI":"10.1002\/9780470451793"},{"key":"ref10","doi-asserted-by":"crossref","unstructured":"M. Pinedo, Scheduling: theory, algorithms, and systems. 2012.;","DOI":"10.1007\/978-1-4614-2361-4"},{"key":"ref11","doi-asserted-by":"crossref","unstructured":"S. B. Akers and J. Friedman, \"A Non-Numerical Approach to Production Scheduling Problems,\" J. Oper. Res. Soc. Am., vol. 3, no. 4, pp. 429-442, Nov. 1955.;","DOI":"10.1287\/opre.3.4.429"},{"key":"ref12","doi-asserted-by":"crossref","unstructured":"G. Campanella, R. A. Ribeiro, and L. R. Varela, \"A Model for B2B Supplier Selection,\" Springer, Berlin, Heidelberg, 2011, pp. 221-228.;","DOI":"10.1007\/978-3-642-24001-0_21"},{"key":"ref13","unstructured":"M. L. R. Varela, J. N. Apar\\'\\icio, and S. C. Silva, \"A Web-based application for manufacturing scheduling.,\" in IASTED International Conference on Intelligent Systems and Control, 2003, pp. 400-405.;"},{"key":"ref14","doi-asserted-by":"crossref","unstructured":"S. C. Graves, \"A Review of Production Scheduling,\" Oper. Res., vol. 29, no. 4, pp. 646-675, Aug. 1981.;","DOI":"10.1287\/opre.29.4.646"},{"key":"ref15","doi-asserted-by":"crossref","unstructured":"A. Madureira, I. Pereira, P. Pereira, and A. Abraham, \"Negotiation mechanism for self-organized scheduling system with collective intelligence,\" Neurocomputing, vol. 132, pp. 97-110, May 2014.;","DOI":"10.1016\/j.neucom.2013.10.032"},{"key":"ref16","unstructured":"L. R. Varela and T. Pinto, \"Comparing Extended Neighborhood Search Techniques Applied to Production Scheduling The Romanian Review Precision Mechanics,\" 2010.;"},{"key":"ref17","doi-asserted-by":"crossref","unstructured":"A. Madureira and I. Pereira, \"Intelligent Bio-Inspired system for manufacturing scheduling under uncertainties,\" in 2010 10th International Conference on Hybrid Intelligent Systems, 2010, pp. 109-112.;","DOI":"10.1109\/HIS.2010.5600084"},{"key":"ref18","unstructured":"J. Blazewicz, K. H. Ecker, E. Pesch, G. Schmidt, and J. Weglarz, Handbook on Scheduling: From Theory to Applications. Springer Berlin Heidelberg, 2007.;"},{"key":"ref19","doi-asserted-by":"crossref","unstructured":"M. Pfund, J. W. Fowler, and J. N. D. Gupta, \"A survey of algorithms for single and multi-objective unrelated parallel-machine deterministic scheduling problems,\" J. Chinese Inst. Ind. Eng., vol. 21, no. 3, pp. 230-241, Jan. 2004.;","DOI":"10.1080\/10170660409509404"},{"key":"ref20","unstructured":"M. Petrovi\u0107, Z. Miljkovi\u0107, and B. Babi\u0107, \"Integration of process planning, scheduling, and mobile robot navigation based on TRIZ and multi-agent methodology,\" FME Trans., vol. 41, no. 2, pp. 120-129, 2013.;"},{"key":"ref21","doi-asserted-by":"crossref","unstructured":"D. Terekhov, D. G. Down, and J. C. Beck, \"Queueing-theoretic approaches for dynamic scheduling: A survey,\" Surv. Oper. Res. Manag. Sci., vol. 19, no. 2, pp. 105-129, Jul. 2014.;","DOI":"10.1016\/j.sorms.2014.09.001"},{"key":"ref22","doi-asserted-by":"crossref","unstructured":"M. L. R. Varela and R. A. Ribeiro, \"Distributed Manufacturing Scheduling Based on a Dynamic Multi-criteria Decision Model,\" Springer, Cham, 2014, pp. 81-93.;","DOI":"10.1007\/978-3-319-06323-2_6"},{"key":"ref23","doi-asserted-by":"crossref","unstructured":"J. A. V\u00e1zquez-Rodr\u00edguez and S. Petrovic, \"A new dispatching rule based genetic algorithm for the multi-objective job shop problem,\" J. Heuristics, vol. 16, no. 6, pp. 771-793, Dec. 2010.;","DOI":"10.1007\/s10732-009-9120-8"},{"key":"ref24","doi-asserted-by":"crossref","unstructured":"C. E. Nugraheni, \"On the Development of Hyper Heuristics Based Framework for Scheduling Problems in Textile Industry,\" Artic. Int. J. Model. Optim., 2016.;","DOI":"10.7763\/IJMO.2016.V6.539"},{"key":"ref25","unstructured":"C. Bharatiraja, G. Kasilingam, J. Pasupuleti, C. Bharatiraja, and Y. Adedayo, \"Single Machine Connected Infinite Bus System Tuning Coordination Control using Biogeography-Based Optimization Algorithm,\" FME Trans., vol. 41, pp. 120-129, 2013.;"},{"key":"ref26","unstructured":"J. Antonio V\u00e1zquez Rodr\u00edguez and A. Salhi, \"A Robust Meta-Hyper-Heuristic Approach,\" 2006.;"},{"key":"ref27","unstructured":"V. Spasojevi\u0107-Brki\u0107, G. Putnik, V. Shah, H. Castro, and Z. Veljkovi\u0107, \"Human-computer interactions and user interfaces for remote control of manufacturing systems,\" FME Trans., vol. 41, no. 3, pp. 250-255, 2013.;"},{"key":"ref28","doi-asserted-by":"crossref","unstructured":"C. H\u00f6gstr\u00f6m, M. Rosner, and A. Gustafsson, \"How to create attractive and unique customer experiences,\" Mark. Intell. Plan., vol. 28, no. 4, pp. 385-402, Jun. 2010.;","DOI":"10.1108\/02634501011053531"},{"key":"ref29","doi-asserted-by":"crossref","unstructured":"M. L\u00f6fgren, L. Witell, and A. Gustafsson, \"Theory of attractive quality and life cycles of quality attributes,\" TQM J., vol. 23, no. 2, pp. 235-246, Mar. 2011.;","DOI":"10.1108\/17542731111110267"}],"container-title":["FME Transactions"],"original-title":["Alat za orijentaciju Industrije 4.0 za podr\u0161ku dinami\u010dkom izboru pravila dispe\u010dinga na osnovu planiranja zadovoljstva Kano modela"],"language":"en","link":[{"URL":"https:\/\/scindeks-clanci.ceon.rs\/data\/pdf\/1451-2092\/2019\/1451-20921904757F.pdf","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2019,10,10]],"date-time":"2019-10-10T21:18:07Z","timestamp":1570742287000},"score":1,"resource":{"primary":{"URL":"https:\/\/scindeks.ceon.rs\/Article.aspx?artid=1451-20921904757F"}},"subtitle":[],"short-title":[],"issued":{"date-parts":[[2019]]},"references-count":29,"journal-issue":{"issue":"4","published-print":{"date-parts":[[2019]]}},"URL":"https:\/\/doi.org\/10.5937\/fmet1904757f","relation":{},"ISSN":["1451-2092","2406-128X"],"issn-type":[{"value":"1451-2092","type":"print"},{"value":"2406-128X","type":"electronic"}],"subject":[],"published":{"date-parts":[[2019]]}}}