{"status":"ok","message-type":"work-list","message-version":"1.0.0","message":{"facets":{},"total-results":2064607,"items":[{"indexed":{"date-parts":[[2023,5,22]],"date-time":"2023-05-22T09:27:00Z","timestamp":1684747620978},"publisher-location":"Madison, WI","reference-count":0,"publisher":"U.S. Department of Agriculture, Forest Service, Forest Products Laboratory","content-domain":{"domain":[],"crossmark-restriction":false},"published-print":{"date-parts":[[1994]]},"DOI":"10.2737\/fpl-gtr-82","type":"report","created":{"date-parts":[[2017,6,26]],"date-time":"2017-06-26T18:10:49Z","timestamp":1498500649000},"source":"Crossref","is-referenced-by-count":1,"title":["Capacity, production, and manufacturing of woodbased panels in North America"],"prefix":"10.2737","author":[{"given":"Henry","family":"Spelter","sequence":"first","affiliation":[]}],"member":"1450","deposited":{"date-parts":[[2017,9,27]],"date-time":"2017-09-27T19:24:47Z","timestamp":1506540287000},"score":31.602879,"resource":{"primary":{"URL":"https:\/\/www.fs.usda.gov\/treesearch\/pubs\/9670"}},"issued":{"date-parts":[[1994]]},"references-count":0,"URL":"https:\/\/doi.org\/10.2737\/fpl-gtr-82","published":{"date-parts":[[1994]]}},{"indexed":{"date-parts":[[2024,3,7]],"date-time":"2024-03-07T15:46:45Z","timestamp":1709826405524},"reference-count":7,"publisher":"IGI Global","content-domain":{"domain":[],"crossmark-restriction":false},"abstract":"<jats:p>It is always necessary to differentiate between an industrial company\u2019s production capacity (it shows the industrial company\u2019s maximum possible production in a time interval of one year), the production achieved by the industrial company, and industrial company\u2019s size (its size in terms of production volume that it may achieve). The production capacity can be analysed under two aspects, dynamic and static. Taking into account the specificity of the production departments within an industrial company, the production capacity must be calculated separately for the basic departments, auxiliary departments, and service departments. Knowing the production capacity and production volume achieved, the capacity reserves shall be determined, which can generally be extensive or intensive. When analysing and optimising the level of the production capacity, the operative management has a special role. The constructive, material, and technological preparation of production that shall be achieved within the industrial companies influences how the production capacity is calculated as well as its size.<\/jats:p>","DOI":"10.4018\/978-1-4666-2818-2.ch002","type":"book-chapter","created":{"date-parts":[[2012,12,17]],"date-time":"2012-12-17T14:20:13Z","timestamp":1355754013000},"page":"40-67","source":"Crossref","is-referenced-by-count":1,"title":["Capacity of Production"],"prefix":"10.4018","author":[{"given":"I. C.","family":"Dima","sequence":"first","affiliation":[{"name":"University Valahia of Targoviste, Romania"}]},{"given":"Sebastian","family":"Kot","sequence":"additional","affiliation":[{"name":"Technology University of Czestochowska, Poland"}]}],"member":"2432","reference":[{"key":"978-1-4666-2818-2.ch002.-1","author":"P.Baranger","year":"1993","journal-title":"Management et techniques de gestion"},{"key":"978-1-4666-2818-2.ch002.-2","author":"A.Courtois","year":"1989","journal-title":"Gestion de production"},{"key":"978-1-4666-2818-2.ch002.-3","author":"I. C.Dima","year":"2010","journal-title":"Elements of industrial operational management"},{"key":"978-1-4666-2818-2.ch002.-4","author":"I. C.Dima","year":"1999","journal-title":"Managementul activit\u0103\u0163ii industriale"},{"key":"978-1-4666-2818-2.ch002.-5","author":"F. E.Meyers","year":"2004","journal-title":"Manufacturing facilities design and material handling"},{"key":"978-1-4666-2818-2.ch002.-6","unstructured":"Slack, N., Chambers, S., & Johnston, R. (2001). Operations management. Harlow, MA: Financial Times\/Prentice Hall."},{"key":"978-1-4666-2818-2.ch002.-7","author":"W. C.Turner","year":"1993","journal-title":"Introduction to industrial and systems engineering"}],"container-title":["Industrial Production Management in Flexible Manufacturing Systems"],"link":[{"URL":"https:\/\/www.igi-global.com\/viewtitle.aspx?TitleId=73722","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2018,11,20]],"date-time":"2018-11-20T09:21:12Z","timestamp":1542705672000},"score":31.349453,"resource":{"primary":{"URL":"http:\/\/services.igi-global.com\/resolvedoi\/resolve.aspx?doi=10.4018\/978-1-4666-2818-2.ch002"}},"subtitle":[""],"issued":{"date-parts":[[null]]},"references-count":7,"URL":"https:\/\/doi.org\/10.4018\/978-1-4666-2818-2.ch002"},{"indexed":{"date-parts":[[2025,3,27]],"date-time":"2025-03-27T13:31:42Z","timestamp":1743082302795,"version":"3.40.3"},"publisher-location":"New York, NY","reference-count":0,"publisher":"Springer US","isbn-type":[{"type":"print","value":"9780792386308"},{"type":"electronic","value":"9781402006128"}],"license":[{"start":{"date-parts":[[2000,1,1]],"date-time":"2000-01-01T00:00:00Z","timestamp":946684800000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2000,1,1]],"date-time":"2000-01-01T00:00:00Z","timestamp":946684800000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"published-print":{"date-parts":[[2000]]},"DOI":"10.1007\/1-4020-0612-8_119","type":"book-chapter","created":{"date-parts":[[2006,1,30]],"date-time":"2006-01-30T16:26:37Z","timestamp":1138638397000},"page":"74-74","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":0,"title":["CAPACITY"],"prefix":"10.1007","author":[{"given":"P. M.","family":"Swamidass","sequence":"first","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2024,11,1]]},"container-title":["Encyclopedia of Production and Manufacturing Management"],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/1-4020-0612-8_119","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,10,31]],"date-time":"2024-10-31T09:24:21Z","timestamp":1730366661000},"score":30.213303,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/1-4020-0612-8_119"}},"issued":{"date-parts":[[2000]]},"ISBN":["9780792386308","9781402006128"],"references-count":0,"URL":"https:\/\/doi.org\/10.1007\/1-4020-0612-8_119","published":{"date-parts":[[2000]]},"assertion":[{"value":"1 November 2024","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}}]},{"indexed":{"date-parts":[[2025,3,27]],"date-time":"2025-03-27T06:51:02Z","timestamp":1743058262598,"version":"3.40.3"},"publisher-location":"New York, NY","reference-count":0,"publisher":"Springer US","isbn-type":[{"type":"print","value":"9780792386308"},{"type":"electronic","value":"9781402006128"}],"license":[{"start":{"date-parts":[[2000,1,1]],"date-time":"2000-01-01T00:00:00Z","timestamp":946684800000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2000,1,1]],"date-time":"2000-01-01T00:00:00Z","timestamp":946684800000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"published-print":{"date-parts":[[2000]]},"DOI":"10.1007\/1-4020-0612-8_122","type":"book-chapter","created":{"date-parts":[[2006,1,30]],"date-time":"2006-01-30T16:26:37Z","timestamp":1138638397000},"page":"74-75","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":0,"title":["CAPACITY INSTALLED"],"prefix":"10.1007","author":[{"given":"P. M.","family":"Swamidass","sequence":"first","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2024,11,1]]},"container-title":["Encyclopedia of Production and Manufacturing Management"],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/1-4020-0612-8_122","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,10,31]],"date-time":"2024-10-31T09:24:23Z","timestamp":1730366663000},"score":29.70836,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/1-4020-0612-8_122"}},"issued":{"date-parts":[[2000]]},"ISBN":["9780792386308","9781402006128"],"references-count":0,"URL":"https:\/\/doi.org\/10.1007\/1-4020-0612-8_122","published":{"date-parts":[[2000]]},"assertion":[{"value":"1 November 2024","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}}]},{"indexed":{"date-parts":[[2025,3,26]],"date-time":"2025-03-26T19:56:40Z","timestamp":1743019000487,"version":"3.40.3"},"publisher-location":"New York, NY","reference-count":0,"publisher":"Springer US","isbn-type":[{"type":"print","value":"9780792386308"},{"type":"electronic","value":"9781402006128"}],"license":[{"start":{"date-parts":[[2000,1,1]],"date-time":"2000-01-01T00:00:00Z","timestamp":946684800000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2000,1,1]],"date-time":"2000-01-01T00:00:00Z","timestamp":946684800000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"published-print":{"date-parts":[[2000]]},"DOI":"10.1007\/1-4020-0612-8_120","type":"book-chapter","created":{"date-parts":[[2006,1,30]],"date-time":"2006-01-30T16:26:37Z","timestamp":1138638397000},"page":"74-74","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":0,"title":["CAPACITY AVAILABLE"],"prefix":"10.1007","author":[{"given":"P. M.","family":"Swamidass","sequence":"first","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2024,11,1]]},"container-title":["Encyclopedia of Production and Manufacturing Management"],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/1-4020-0612-8_120","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,10,31]],"date-time":"2024-10-31T09:24:21Z","timestamp":1730366661000},"score":29.70522,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/1-4020-0612-8_120"}},"issued":{"date-parts":[[2000]]},"ISBN":["9780792386308","9781402006128"],"references-count":0,"URL":"https:\/\/doi.org\/10.1007\/1-4020-0612-8_120","published":{"date-parts":[[2000]]},"assertion":[{"value":"1 November 2024","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}}]},{"indexed":{"date-parts":[[2025,3,25]],"date-time":"2025-03-25T14:20:06Z","timestamp":1742912406484,"version":"3.40.3"},"publisher-location":"New York, NY","reference-count":0,"publisher":"Springer US","isbn-type":[{"type":"print","value":"9780792386308"},{"type":"electronic","value":"9781402006128"}],"license":[{"start":{"date-parts":[[2000,1,1]],"date-time":"2000-01-01T00:00:00Z","timestamp":946684800000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2000,1,1]],"date-time":"2000-01-01T00:00:00Z","timestamp":946684800000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"published-print":{"date-parts":[[2000]]},"DOI":"10.1007\/1-4020-0612-8_801","type":"book-chapter","created":{"date-parts":[[2006,1,30]],"date-time":"2006-01-30T16:32:49Z","timestamp":1138638769000},"page":"630-631","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":0,"title":["RATED CAPACITY"],"prefix":"10.1007","author":[{"given":"P. M.","family":"Swamidass","sequence":"first","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2024,11,1]]},"container-title":["Encyclopedia of Production and Manufacturing Management"],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/1-4020-0612-8_801","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,10,31]],"date-time":"2024-10-31T09:20:06Z","timestamp":1730366406000},"score":29.675388,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/1-4020-0612-8_801"}},"issued":{"date-parts":[[2000]]},"ISBN":["9780792386308","9781402006128"],"references-count":0,"URL":"https:\/\/doi.org\/10.1007\/1-4020-0612-8_801","published":{"date-parts":[[2000]]},"assertion":[{"value":"1 November 2024","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}}]},{"indexed":{"date-parts":[[2025,3,25]],"date-time":"2025-03-25T14:36:30Z","timestamp":1742913390890,"version":"3.40.3"},"publisher-location":"New York, NY","reference-count":11,"publisher":"Springer US","isbn-type":[{"type":"print","value":"9780792386308"},{"type":"electronic","value":"9781402006128"}],"license":[{"start":{"date-parts":[[2000,1,1]],"date-time":"2000-01-01T00:00:00Z","timestamp":946684800000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2000,1,1]],"date-time":"2000-01-01T00:00:00Z","timestamp":946684800000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"published-print":{"date-parts":[[2000]]},"DOI":"10.1007\/1-4020-0612-8_123","type":"book-chapter","created":{"date-parts":[[2006,1,30]],"date-time":"2006-01-30T16:26:37Z","timestamp":1138638397000},"page":"75-78","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":1,"title":["CAPACITY MANAGEMENT IN MAKE-TO-ORDER PRODUCTION SYSTEMS"],"prefix":"10.1007","author":[{"given":"V.","family":"Sridharan","sequence":"first","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2024,11,1]]},"reference":[{"key":"123_CR4","unstructured":"APICS, 1995. Apics Dictionary, 8th Edition, Falls Church, VA."},{"key":"123_CR5","first-page":"185","volume":"27-2","author":"N. Balakrishnan","year":"1995","unstructured":"Balakrishnan, N., Sridharan, V., and Patterson, J. W. (1995). \u201cRationing Capacity Between Two Product Classes.\u201d Decision Sciences, 27-2, 185\u2013215.","journal-title":"Decision Sciences"},{"key":"123_CR6","unstructured":"Bertrand, J. W.M. and Sridharan, V. (1998). A Study of Simple Rules for Subcontracting in Make-to-Order Manufacturing. European Journal of Operational Research, Forthcoming."},{"key":"123_CR7","doi-asserted-by":"publisher","first-page":"83","DOI":"10.1016\/0925-5273(94)90010-8","volume":"37-1","author":"F. J. Erens","year":"1994","unstructured":"Erens, F. J. and Hegge, H. M.H. (1994). \u201cManufacturing and Sales Coordination for Product Variety.\u201d International Journal of Production Economics, 37-1, 83\u2013100.","journal-title":"International Journal of Production Economics"},{"key":"123_CR8","doi-asserted-by":"publisher","first-page":"57","DOI":"10.1016\/0377-2217(95)00061-T","volume":"86\u20131","author":"J. C. Fransoo","year":"1995","unstructured":"Fransoo, J. C., Sridharan, V. and Bertrand, J. W.M. (1995). \u201cA Hierarchical Approach for Capacity Coordination in Multiple Products Single-Machine Production Systems With Stationary Stochastic Demands.\u201d European Journal of Operational Research, 86\u20131, 57\u201372.","journal-title":"European Journal of Operational Research"},{"key":"123_CR9","doi-asserted-by":"publisher","first-page":"5","DOI":"10.1016\/0925-5273(94)90003-5","volume":"37-1","author":"C. K. Hahn","year":"1994","unstructured":"Hahn, C. K., Duplaga, E. A., and Kim, K. Y. (1994). \u201cProduction\/Sales Interface: MPS at Hyundai Motor.\u201d International Journal of Production Economics, 37-1, 5\u201318.","journal-title":"International Journal of Production Economics"},{"key":"123_CR10","doi-asserted-by":"publisher","first-page":"139","DOI":"10.1016\/0925-5273(94)90014-0","volume":"37-1","author":"H. A. t. Kate","year":"1994","unstructured":"Kate, H. A. ten (1994). \u201cTowards a Better Understanding of Order Acceptance.\u201d International Journal of Production Economics, 37-1, 139\u2013152.","journal-title":"International Journal of Production Economics"},{"key":"123_CR11","first-page":"56","volume":"29-4","author":"T. L. Powers","year":"1988","unstructured":"Powers, T. L., Sterling, J. U., and Wolter, J. F. (1988). \u201cMarketing and Manufacturing Conflict: Sources and Resolution.\u201d Production and Inventory Management Journal, 29-4, 56\u201360.","journal-title":"Production and Inventory Management Journal"},{"key":"123_CR12","first-page":"104","volume":"55-5","author":"B. P. Shapiro","year":"1977","unstructured":"Shapiro, B. P. (1977). \u201cCan Marketing and Manufacturing coexist?\u201d Harvard Business Review, 55-5, 104\u2013114.","journal-title":"Harvard Business Review"},{"key":"123_CR13","doi-asserted-by":"publisher","first-page":"831","DOI":"10.1287\/opre.40.5.831","volume":"40-5","author":"L. R. Weatherford","year":"1992","unstructured":"Weatherford, L. R., and Bodily, S. E., 1992. \u201cA taxonomy and research overview of perishable-asset revenue management: Yield management, overbooking, and pricing.\u201d Operations Research, 40-5, 831\u2013844.","journal-title":"Operations Research"},{"key":"123_CR14","doi-asserted-by":"publisher","first-page":"1","DOI":"10.1016\/0925-5273(94)90002-7","volume":"37-1","author":"W. C. Whybark","year":"1994","unstructured":"Whybark, W. C. and Wijngaard, J. (1994). \u201cEditorial: Manufacturing-Sales Coordination.\u201d International Journal of Production Economics, 37-1, 1\u20134.","journal-title":"International Journal of Production Economics"}],"container-title":["Encyclopedia of Production and Manufacturing Management"],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/1-4020-0612-8_123","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,10,31]],"date-time":"2024-10-31T09:24:27Z","timestamp":1730366667000},"score":29.482443,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/1-4020-0612-8_123"}},"issued":{"date-parts":[[2000]]},"ISBN":["9780792386308","9781402006128"],"references-count":11,"URL":"https:\/\/doi.org\/10.1007\/1-4020-0612-8_123","published":{"date-parts":[[2000]]},"assertion":[{"value":"1 November 2024","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}}]},{"indexed":{"date-parts":[[2025,3,27]],"date-time":"2025-03-27T05:26:54Z","timestamp":1743053214177,"version":"3.40.3"},"publisher-location":"New York, NY","reference-count":1,"publisher":"Springer US","isbn-type":[{"type":"print","value":"9780792386308"},{"type":"electronic","value":"9781402006128"}],"license":[{"start":{"date-parts":[[2000,1,1]],"date-time":"2000-01-01T00:00:00Z","timestamp":946684800000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2000,1,1]],"date-time":"2000-01-01T00:00:00Z","timestamp":946684800000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"published-print":{"date-parts":[[2000]]},"DOI":"10.1007\/1-4020-0612-8_127","type":"book-chapter","created":{"date-parts":[[2006,1,30]],"date-time":"2006-01-30T16:26:37Z","timestamp":1138638397000},"page":"89-90","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":0,"title":["CAPACITY REQUIREMENTS PLANNING"],"prefix":"10.1007","author":[{"given":"P. M.","family":"Swamidass","sequence":"first","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2024,11,1]]},"reference":[{"key":"127_CR31","volume-title":"Manufacturing Planning and Control Systems","author":"T. E. Vollmann","year":"1997","unstructured":"Vollmann, T. E., Berry, W. L., Whybark, D. C. (1997) Manufacturing Planning and Control Systems, Fourth Edition, Irwin\/McGraw-Hill, New York."}],"container-title":["Encyclopedia of Production and Manufacturing Management"],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/1-4020-0612-8_127","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,10,31]],"date-time":"2024-10-31T09:24:34Z","timestamp":1730366674000},"score":29.320625,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/1-4020-0612-8_127"}},"issued":{"date-parts":[[2000]]},"ISBN":["9780792386308","9781402006128"],"references-count":1,"URL":"https:\/\/doi.org\/10.1007\/1-4020-0612-8_127","published":{"date-parts":[[2000]]},"assertion":[{"value":"1 November 2024","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}}]},{"indexed":{"date-parts":[[2025,3,26]],"date-time":"2025-03-26T22:49:34Z","timestamp":1743029374182,"version":"3.40.3"},"publisher-location":"New York, NY","reference-count":1,"publisher":"Springer US","isbn-type":[{"type":"print","value":"9780792386308"},{"type":"electronic","value":"9781402006128"}],"license":[{"start":{"date-parts":[[2000,1,1]],"date-time":"2000-01-01T00:00:00Z","timestamp":946684800000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2000,1,1]],"date-time":"2000-01-01T00:00:00Z","timestamp":946684800000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"published-print":{"date-parts":[[2000]]},"DOI":"10.1007\/1-4020-0612-8_327","type":"book-chapter","created":{"date-parts":[[2006,1,30]],"date-time":"2006-01-30T16:26:48Z","timestamp":1138638408000},"page":"206-207","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":0,"title":["FINITE CAPACITY SCHEDULING"],"prefix":"10.1007","author":[{"given":"P. M.","family":"Swamidass","sequence":"first","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2024,11,1]]},"reference":[{"key":"327_CR21","first-page":"38","volume":"8","author":"B. Kirchmier","year":"1998","unstructured":"Kirchmier, B. (1998). \u201cFinite capacity scheduling methods,\u201d APICS: The Performance Advantage, 8, 38\u201340.","journal-title":"APICS: The Performance Advantage"}],"container-title":["Encyclopedia of Production and Manufacturing Management"],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/1-4020-0612-8_327","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,10,31]],"date-time":"2024-10-31T09:28:54Z","timestamp":1730366934000},"score":29.275438,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/1-4020-0612-8_327"}},"issued":{"date-parts":[[2000]]},"ISBN":["9780792386308","9781402006128"],"references-count":1,"URL":"https:\/\/doi.org\/10.1007\/1-4020-0612-8_327","published":{"date-parts":[[2000]]},"assertion":[{"value":"1 November 2024","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}}]},{"indexed":{"date-parts":[[2025,3,28]],"date-time":"2025-03-28T02:46:18Z","timestamp":1743129978334,"version":"3.40.3"},"publisher-location":"New York, NY","reference-count":0,"publisher":"Springer US","isbn-type":[{"type":"print","value":"9780792386308"},{"type":"electronic","value":"9781402006128"}],"license":[{"start":{"date-parts":[[2000,1,1]],"date-time":"2000-01-01T00:00:00Z","timestamp":946684800000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2000,1,1]],"date-time":"2000-01-01T00:00:00Z","timestamp":946684800000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"published-print":{"date-parts":[[2000]]},"DOI":"10.1007\/1-4020-0612-8_263","type":"book-chapter","created":{"date-parts":[[2006,1,30]],"date-time":"2006-01-30T16:26:37Z","timestamp":1138638397000},"page":"166-166","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":0,"title":["DYNAMIC CAPACITY ALLOCATION"],"prefix":"10.1007","author":[{"given":"P. M.","family":"Swamidass","sequence":"first","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2024,11,1]]},"container-title":["Encyclopedia of Production and Manufacturing Management"],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/1-4020-0612-8_263","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,10,31]],"date-time":"2024-10-31T09:24:02Z","timestamp":1730366642000},"score":29.247568,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/1-4020-0612-8_263"}},"issued":{"date-parts":[[2000]]},"ISBN":["9780792386308","9781402006128"],"references-count":0,"URL":"https:\/\/doi.org\/10.1007\/1-4020-0612-8_263","published":{"date-parts":[[2000]]},"assertion":[{"value":"1 November 2024","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}}]},{"indexed":{"date-parts":[[2025,3,27]],"date-time":"2025-03-27T05:34:46Z","timestamp":1743053686293,"version":"3.40.3"},"publisher-location":"New York, NY","reference-count":1,"publisher":"Springer US","isbn-type":[{"type":"print","value":"9780792386308"},{"type":"electronic","value":"9781402006128"}],"license":[{"start":{"date-parts":[[2000,1,1]],"date-time":"2000-01-01T00:00:00Z","timestamp":946684800000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2000,1,1]],"date-time":"2000-01-01T00:00:00Z","timestamp":946684800000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"published-print":{"date-parts":[[2000]]},"DOI":"10.1007\/1-4020-0612-8_121","type":"book-chapter","created":{"date-parts":[[2006,1,30]],"date-time":"2006-01-30T16:26:37Z","timestamp":1138638397000},"page":"74-74","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":0,"title":["CAPACITY BILLS (CB) METHOD"],"prefix":"10.1007","author":[{"given":"P. M.","family":"Swamidass","sequence":"first","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2024,11,1]]},"reference":[{"issue":"1","key":"121_CR3","doi-asserted-by":"publisher","first-page":"13","DOI":"10.1016\/0272-6963(82)90018-3","volume":"3","author":"W. L. Berry","year":"1982","unstructured":"Berry, W. L., T. G. Schmitt, and T. E. Vollmann (1982). \u201cCapacity planning Techniques for Manufacturing Control Systems: Information Requirements and Operational Features,\u201d Journal of Operations Management, 3(1), pp. 13\u201325.","journal-title":"Journal of Operations Management"}],"container-title":["Encyclopedia of Production and Manufacturing Management"],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/1-4020-0612-8_121","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,10,31]],"date-time":"2024-10-31T09:24:23Z","timestamp":1730366663000},"score":28.9215,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/1-4020-0612-8_121"}},"issued":{"date-parts":[[2000]]},"ISBN":["9780792386308","9781402006128"],"references-count":1,"URL":"https:\/\/doi.org\/10.1007\/1-4020-0612-8_121","published":{"date-parts":[[2000]]},"assertion":[{"value":"1 November 2024","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}}]},{"indexed":{"date-parts":[[2025,3,27]],"date-time":"2025-03-27T15:38:40Z","timestamp":1743089920306,"version":"3.40.3"},"publisher-location":"New York, NY","reference-count":0,"publisher":"Springer US","isbn-type":[{"type":"print","value":"9780792386308"},{"type":"electronic","value":"9781402006128"}],"license":[{"start":{"date-parts":[[2000,1,1]],"date-time":"2000-01-01T00:00:00Z","timestamp":946684800000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2000,1,1]],"date-time":"2000-01-01T00:00:00Z","timestamp":946684800000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"published-print":{"date-parts":[[2000]]},"DOI":"10.1007\/1-4020-0612-8_830","type":"book-chapter","created":{"date-parts":[[2006,1,30]],"date-time":"2006-01-30T16:32:49Z","timestamp":1138638769000},"page":"654-654","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":0,"title":["ROUGH-CUT CAPACITY PLANNING"],"prefix":"10.1007","author":[{"given":"P. M.","family":"Swamidass","sequence":"first","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2024,11,1]]},"container-title":["Encyclopedia of Production and Manufacturing Management"],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/1-4020-0612-8_830","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,10,31]],"date-time":"2024-10-31T09:20:33Z","timestamp":1730366433000},"score":28.847904,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/1-4020-0612-8_830"}},"issued":{"date-parts":[[2000]]},"ISBN":["9780792386308","9781402006128"],"references-count":0,"URL":"https:\/\/doi.org\/10.1007\/1-4020-0612-8_830","published":{"date-parts":[[2000]]},"assertion":[{"value":"1 November 2024","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}}]},{"indexed":{"date-parts":[[2025,3,26]],"date-time":"2025-03-26T22:16:58Z","timestamp":1743027418073,"version":"3.40.3"},"publisher-location":"New York, NY","reference-count":10,"publisher":"Springer US","isbn-type":[{"type":"print","value":"9780792386308"},{"type":"electronic","value":"9781402006128"}],"license":[{"start":{"date-parts":[[2000,1,1]],"date-time":"2000-01-01T00:00:00Z","timestamp":946684800000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2000,1,1]],"date-time":"2000-01-01T00:00:00Z","timestamp":946684800000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"published-print":{"date-parts":[[2000]]},"DOI":"10.1007\/1-4020-0612-8_125","type":"book-chapter","created":{"date-parts":[[2006,1,30]],"date-time":"2006-01-30T16:26:37Z","timestamp":1138638397000},"page":"79-85","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":0,"title":["CAPACITY PLANNING: LONG-RANGE"],"prefix":"10.1007","author":[{"given":"Gregory P.","family":"White","sequence":"first","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2024,11,1]]},"reference":[{"key":"125_CR15","volume-title":"1997 CPIM Exam Content Manual","author":"APICS","year":"1996","unstructured":"APICS (1996). 1997 CPIM Exam Content Manual. APICS, the Educational Society for Resource Management, Virginia."},{"key":"125_CR16","volume-title":"Master Production Scheduling","author":"W. L. Berry","year":"1979","unstructured":"Berry, W. L., T. E. Vollmann, and D. C. Whybark (1979). Master Production Scheduling, American Production and Inventory Control Society, Virginia."},{"key":"125_CR17","doi-asserted-by":"crossref","unstructured":"Bitran, G. D., E. A. Haas, and A. C. Hax (1982). \u201cHierarchical Production Planning: A Two-Stage System.\u201d Operations Research, March-April, 232\u201351.","DOI":"10.1287\/opre.30.2.232"},{"key":"125_CR18","volume-title":"Capacity Management","author":"J. H. Blackstone Jr.","year":"1989","unstructured":"Blackstone, J. H. Jr. (1989). Capacity Management, South-Western, Cincinnati."},{"volume-title":"The Goal","year":"1986","key":"125_CR19","unstructured":"Goldratt, E. M. and J. Cox (1986). The Goal (Rev. Ed.). North River Press, New York."},{"key":"125_CR20","volume-title":"Planning Production, Inventories, and Workforce","author":"C. C. Holt","year":"1960","unstructured":"Holt, C. C., F. Modigliani, J. F. Muth, and H. A. Simon (1960). Planning Production, Inventories, and Workforce. Prentice Hall, New York."},{"key":"125_CR21","volume-title":"Synchronous Manufacturing","author":"M. Umble","year":"1995","unstructured":"Umble, M. and M. L. Srikanth (1995). Synchronous Manufacturing, Spectrum Publishing, Connecticut."},{"key":"125_CR22","volume-title":"Manufacturing Planning and Control Systems","author":"T. E. Vollmann","year":"1997","unstructured":"Vollmann, T. E., W. L. Berry, and D. C. Whybark (1997). Manufacturing Planning and Control Systems (4th ed.). Irwin\/McGraw-Hill, New York."},{"key":"125_CR23","volume-title":"Case Studies in Capacity Management","author":"U. Wemmerlov","year":"1984","unstructured":"Wemmerlov, U. (1984). Case Studies in Capacity Management. American Production and Inventory Control Society, Virginia."},{"key":"125_CR24","first-page":"9","volume":"11","author":"O. W. Wight","year":"1970","unstructured":"Wight, O. W. (1970). \u201cInput-output control, a real handle on lead time.\u201d Production and Inventory Management, 11, 9\u201331","journal-title":"Production and Inventory Management"}],"container-title":["Encyclopedia of Production and Manufacturing Management"],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/1-4020-0612-8_125","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,10,31]],"date-time":"2024-10-31T09:24:32Z","timestamp":1730366672000},"score":28.79403,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/1-4020-0612-8_125"}},"issued":{"date-parts":[[2000]]},"ISBN":["9780792386308","9781402006128"],"references-count":10,"URL":"https:\/\/doi.org\/10.1007\/1-4020-0612-8_125","published":{"date-parts":[[2000]]},"assertion":[{"value":"1 November 2024","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}}]},{"indexed":{"date-parts":[[2025,3,27]],"date-time":"2025-03-27T08:41:49Z","timestamp":1743064909317,"version":"3.40.3"},"publisher-location":"New York, NY","reference-count":0,"publisher":"Springer US","isbn-type":[{"type":"print","value":"9780792386308"},{"type":"electronic","value":"9781402006128"}],"license":[{"start":{"date-parts":[[2000,1,1]],"date-time":"2000-01-01T00:00:00Z","timestamp":946684800000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2000,1,1]],"date-time":"2000-01-01T00:00:00Z","timestamp":946684800000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"published-print":{"date-parts":[[2000]]},"DOI":"10.1007\/1-4020-0612-8_507","type":"book-chapter","created":{"date-parts":[[2006,1,30]],"date-time":"2006-01-30T16:33:33Z","timestamp":1138638813000},"page":"360-360","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":0,"title":["LEVEL STRATEGY FOR CAPACITY PLANNING"],"prefix":"10.1007","author":[{"given":"P. M.","family":"Swamidass","sequence":"first","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2024,11,1]]},"container-title":["Encyclopedia of Production and Manufacturing Management"],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/1-4020-0612-8_507","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,10,31]],"date-time":"2024-10-31T09:12:21Z","timestamp":1730365941000},"score":28.51466,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/1-4020-0612-8_507"}},"issued":{"date-parts":[[2000]]},"ISBN":["9780792386308","9781402006128"],"references-count":0,"URL":"https:\/\/doi.org\/10.1007\/1-4020-0612-8_507","published":{"date-parts":[[2000]]},"assertion":[{"value":"1 November 2024","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}}]},{"indexed":{"date-parts":[[2025,3,26]],"date-time":"2025-03-26T01:37:59Z","timestamp":1742953079497,"version":"3.40.3"},"publisher-location":"New York, NY","reference-count":0,"publisher":"Springer US","isbn-type":[{"type":"print","value":"9780792386308"},{"type":"electronic","value":"9781402006128"}],"license":[{"start":{"date-parts":[[2000,1,1]],"date-time":"2000-01-01T00:00:00Z","timestamp":946684800000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2000,1,1]],"date-time":"2000-01-01T00:00:00Z","timestamp":946684800000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"published-print":{"date-parts":[[2000]]},"DOI":"10.1007\/1-4020-0612-8_135","type":"book-chapter","created":{"date-parts":[[2006,1,30]],"date-time":"2006-01-30T16:26:37Z","timestamp":1138638397000},"page":"94-94","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":0,"title":["CHASE STRATEGY FOR CAPACITY PLANNING"],"prefix":"10.1007","author":[{"given":"P. M.","family":"Swamidass","sequence":"first","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2024,11,1]]},"container-title":["Encyclopedia of Production and Manufacturing Management"],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/1-4020-0612-8_135","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,10,31]],"date-time":"2024-10-31T09:24:43Z","timestamp":1730366683000},"score":28.504028,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/1-4020-0612-8_135"}},"issued":{"date-parts":[[2000]]},"ISBN":["9780792386308","9781402006128"],"references-count":0,"URL":"https:\/\/doi.org\/10.1007\/1-4020-0612-8_135","published":{"date-parts":[[2000]]},"assertion":[{"value":"1 November 2024","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}}]},{"indexed":{"date-parts":[[2023,3,4]],"date-time":"2023-03-04T05:25:44Z","timestamp":1677907544679},"reference-count":0,"publisher":"Mark Allen Group","issue":"3","license":[{"start":{"date-parts":[[2014,5,1]],"date-time":"2014-05-01T00:00:00Z","timestamp":1398902400000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.elsevier.com\/tdm\/userlicense\/1.0\/"}],"content-domain":{"domain":[],"crossmark-restriction":false},"short-container-title":["Filtration + Separation"],"published-print":{"date-parts":[[2014,5]]},"DOI":"10.1016\/s0015-1882(14)70108-9","type":"journal-article","created":{"date-parts":[[2014,6,19]],"date-time":"2014-06-19T02:17:50Z","timestamp":1403144270000},"page":"39","source":"Crossref","is-referenced-by-count":0,"title":["Manufacturing: Customised filter solution helps boost production capacity"],"prefix":"10.12968","volume":"51","member":"5130","container-title":["Filtration + Separation"],"language":"en","link":[{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0015188214701089?httpAccept=text\/xml","content-type":"text\/xml","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0015188214701089?httpAccept=text\/plain","content-type":"text\/plain","content-version":"vor","intended-application":"text-mining"},{"URL":"https:\/\/api.elsevier.com\/content\/article\/PII:S0015188214701089?httpAccept=text\/plain","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2023,3,3]],"date-time":"2023-03-03T10:06:39Z","timestamp":1677837999000},"score":28.461185,"resource":{"primary":{"URL":"https:\/\/linkinghub.elsevier.com\/retrieve\/pii\/S0015188214701089"}},"issued":{"date-parts":[[2014,5]]},"references-count":0,"journal-issue":{"issue":"3","published-print":{"date-parts":[[2014,5]]}},"alternative-id":["S0015188214701089"],"URL":"https:\/\/doi.org\/10.1016\/s0015-1882(14)70108-9","ISSN":["0015-1882"],"issn-type":[{"value":"0015-1882","type":"print"}],"published":{"date-parts":[[2014,5]]}},{"indexed":{"date-parts":[[2025,3,28]],"date-time":"2025-03-28T09:52:49Z","timestamp":1743155569811,"version":"3.40.3"},"publisher-location":"New York, NY","reference-count":0,"publisher":"Springer US","isbn-type":[{"type":"print","value":"9780792386308"},{"type":"electronic","value":"9781402006128"}],"license":[{"start":{"date-parts":[[2000,1,1]],"date-time":"2000-01-01T00:00:00Z","timestamp":946684800000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2000,1,1]],"date-time":"2000-01-01T00:00:00Z","timestamp":946684800000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"published-print":{"date-parts":[[2000]]},"DOI":"10.1007\/1-4020-0612-8_124","type":"book-chapter","created":{"date-parts":[[2006,1,30]],"date-time":"2006-01-30T16:26:37Z","timestamp":1138638397000},"page":"78-79","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":0,"title":["CAPACITY PLANNING BY OVERALL FACTORS"],"prefix":"10.1007","author":[{"given":"P. M.","family":"Swamidass","sequence":"first","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2024,11,1]]},"container-title":["Encyclopedia of Production and Manufacturing Management"],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/1-4020-0612-8_124","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,10,31]],"date-time":"2024-10-31T09:24:27Z","timestamp":1730366667000},"score":28.458519,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/1-4020-0612-8_124"}},"issued":{"date-parts":[[2000]]},"ISBN":["9780792386308","9781402006128"],"references-count":0,"URL":"https:\/\/doi.org\/10.1007\/1-4020-0612-8_124","published":{"date-parts":[[2000]]},"assertion":[{"value":"1 November 2024","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}}]},{"indexed":{"date-parts":[[2024,9,5]],"date-time":"2024-09-05T14:25:42Z","timestamp":1725546342757},"reference-count":3,"publisher":"IEEE","content-domain":{"domain":[],"crossmark-restriction":false},"DOI":"10.1109\/iemt.1995.526176","type":"proceedings-article","created":{"date-parts":[[2002,11,19]],"date-time":"2002-11-19T17:32:37Z","timestamp":1037727157000},"page":"292-294","source":"Crossref","is-referenced-by-count":0,"title":["Utilizing production data to increase factory capacity"],"prefix":"10.1109","author":[{"given":"J.","family":"Konopka","sequence":"first","affiliation":[]},{"given":"W.","family":"Trybula","sequence":"additional","affiliation":[]}],"member":"263","reference":[{"key":"ref3","doi-asserted-by":"publisher","DOI":"10.1109\/95.465141"},{"key":"ref2","article-title":"A General Framework for Equipment Productivity Analysis","author":"konopka","year":"1995","journal-title":"Working Paper"},{"year":"0","key":"ref1"}],"event":{"name":"Seventeenth IEEE\/CPMT International Electronics Manufacturing Technology Symposium. 'Manufacturing Technologies - Present and Future'","acronym":"IEMT-1795","location":"Austin, TX, USA"},"container-title":["Seventeenth IEEE\/CPMT International Electronics Manufacturing Technology Symposium. 'Manufacturing Technologies - Present and Future'"],"link":[{"URL":"http:\/\/xplorestaging.ieee.org\/ielx5\/4023\/11545\/00526176.pdf?arnumber=526176","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2017,3,9]],"date-time":"2017-03-09T16:24:14Z","timestamp":1489076654000},"score":28.427385,"resource":{"primary":{"URL":"http:\/\/ieeexplore.ieee.org\/document\/526176\/"}},"issued":{"date-parts":[[null]]},"references-count":3,"URL":"https:\/\/doi.org\/10.1109\/iemt.1995.526176"},{"indexed":{"date-parts":[[2025,3,27]],"date-time":"2025-03-27T18:48:19Z","timestamp":1743101299656,"version":"3.40.3"},"publisher-location":"New York, NY","reference-count":0,"publisher":"Springer US","isbn-type":[{"type":"print","value":"9780792386308"},{"type":"electronic","value":"9781402006128"}],"license":[{"start":{"date-parts":[[2000,1,1]],"date-time":"2000-01-01T00:00:00Z","timestamp":946684800000},"content-version":"tdm","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"},{"start":{"date-parts":[[2000,1,1]],"date-time":"2000-01-01T00:00:00Z","timestamp":946684800000},"content-version":"vor","delay-in-days":0,"URL":"https:\/\/www.springer.com\/tdm"}],"content-domain":{"domain":["link.springer.com"],"crossmark-restriction":false},"published-print":{"date-parts":[[2000]]},"DOI":"10.1007\/1-4020-0612-8_356","type":"book-chapter","created":{"date-parts":[[2006,1,30]],"date-time":"2006-01-30T16:26:48Z","timestamp":1138638408000},"page":"224-224","update-policy":"https:\/\/doi.org\/10.1007\/springer_crossmark_policy","source":"Crossref","is-referenced-by-count":0,"title":["FOLLOW THE LEADER CAPACITY EXPANSION STRATEGY"],"prefix":"10.1007","author":[{"given":"P. M.","family":"Swamidass","sequence":"first","affiliation":[]}],"member":"297","published-online":{"date-parts":[[2024,11,1]]},"container-title":["Encyclopedia of Production and Manufacturing Management"],"language":"en","link":[{"URL":"https:\/\/link.springer.com\/content\/pdf\/10.1007\/1-4020-0612-8_356","content-type":"unspecified","content-version":"vor","intended-application":"similarity-checking"}],"deposited":{"date-parts":[[2024,10,31]],"date-time":"2024-10-31T09:29:21Z","timestamp":1730366961000},"score":28.106146,"resource":{"primary":{"URL":"https:\/\/link.springer.com\/10.1007\/1-4020-0612-8_356"}},"issued":{"date-parts":[[2000]]},"ISBN":["9780792386308","9781402006128"],"references-count":0,"URL":"https:\/\/doi.org\/10.1007\/1-4020-0612-8_356","published":{"date-parts":[[2000]]},"assertion":[{"value":"1 November 2024","order":1,"name":"first_online","label":"First Online","group":{"name":"ChapterHistory","label":"Chapter History"}}]},{"indexed":{"date-parts":[[2024,9,12]],"date-time":"2024-09-12T23:53:42Z","timestamp":1726185222426},"publisher-location":"1 Oliver\u2019s Yard,\u00a055 City Road,\u00a0London\u00a0 EC1Y 1SP\u00a0 United Kingdom\u00a0","reference-count":0,"publisher":"SAGE Publications: SAGE Business Cases Originals","isbn-type":[{"type":"electronic","value":"9781529621075"}],"content-domain":{"domain":[],"crossmark-restriction":false},"published-print":{"date-parts":[[2023]]},"DOI":"10.4135\/9781529621075","type":"reference-book","created":{"date-parts":[[2023,1,14]],"date-time":"2023-01-14T13:38:30Z","timestamp":1673703510000},"source":"Crossref","is-referenced-by-count":0,"title":["Electrical Circuit Breaker Manufacturing: A Strategy for Increasing Production Capacity Post COVID-19"],"prefix":"10.4135","author":[{"given":"Anand","family":"Sasikumar","sequence":"first","affiliation":[]},{"given":"S.","family":"Jayakrishnan","sequence":"additional","affiliation":[]}],"member":"179","deposited":{"date-parts":[[2023,1,14]],"date-time":"2023-01-14T13:38:33Z","timestamp":1673703513000},"score":28.052689,"resource":{"primary":{"URL":"https:\/\/sk.sagepub.com\/cases\/circuit-breaker-manufacturing-increasing-production-post-covid-19"}},"issued":{"date-parts":[[2023]]},"ISBN":["9781529621075"],"references-count":0,"alternative-id":["10.4135\/9781529621075"],"URL":"https:\/\/doi.org\/10.4135\/9781529621075","published":{"date-parts":[[2023]]}}],"items-per-page":20,"query":{"start-index":0,"search-terms":"Production+capacity.+Manufacturing+capacity"}}}